Preview only show first 10 pages with watermark. For full document please download

00703612a Gb

   EMBED


Share

Transcript

Standard equipment Pit construction diagram 00703612A 2 Pit brackets, lengthwise 2 Pit brackets, crosswise 2 Cover strips 4 Nuts M8 DIN 934 4 Hex bolts M8x20 DIN 933 1 Locking plate 4 Dowels METTLER TOLEDO MultiRange Dry and wet pit KC/MC/DC/KCS/MCS/DCS line Subject to technical changes © Mettler-Toledo (Albstadt) GmbH Printed in Germany 06/04 english 1. Determine location of weighing platform 4 Screws 4 Washers 1 Rubber grommet 1 Accessories bag with parts for scale installation 1 Pit construction instructions KC/MC/DC/KCS/MCS/DCS line Dry pit KC/MC/DC 113.7 KCS/MCS/DCS 93.7 2. Determine location of terminal 15 A Good, sufficient room to load pallets on the weighing platform 1 1 • Set up terminal to ensure good access C Wrong, unnecessary wear on weighing platform • Length of connection cable terminal 5 m (standard) Note maximum static load: min. 1300 kg/25 cm 2 82.4 2 3. Prepare framework pit 2 • Excavate framework pit as specified in the table below. A 1 • Pipe diameter min. 4 cm. Do not use a right-angled pipe, rather two pipes of 45° A Section A-A 11 cm > 4 cm 45° 45° B KC/MC/DC - Dry pit - Wet pit 165 140 KCS/MCS/DCS - Dry pit - Wet pit 140 X Wet pit 20 30 1 130 20 30 KC/MC/DC 113.7 KCS/MCS/DCS 93.7 18 15 1 X 82.4 4. Concrete forming • Assemble steel pit frame. When tightening the bolts ensure that the frame is flat. Check that the frame is rectangular. 2 2 • Prepare stable wooden frame (see sketch for dimensions). The steel frame must fit the wooden frame exactly. • Install wooden frame together with steel frame in the framework pit. The steel frame must be exactly horizontal. B A KC/MC/DC KCS/MCS/DCS • When concreting ensure that the wooden frame remains in place. • Wet pit: After the pit base has set and the formwork removed, concrete the supports for the leveling feet of the weighing platform (see Dimension drawings). 1 Supporting surface for levelling feet of the weighing platform 2 Cable conduit 10 LxB L 15 • Only wet pit: Ensure appropriate gradient for drain water. Install recess with siphon as shown. X 1 12 • Excavate channel for cable conduit. The cable conduit ends in the base of the pit (see illustration). 113.7 93.7 X 12 A 82.4 Section X-X 1 1 B 12 C A 1 Supporting surface for levelling feet of the weighing platform 2 Cable conduit 10 B Unsuitable, difficult to access Section B-B 20 B Pit construction diagram 00703612A 5. Dimension drawings Dimensions in cm