Transcript
Submittal Transmittal Detailed, Grouped by Each Number
1654 - Marywood Learning Commons 2300 Adams Avenue Scranton, PA 18509 Date:
Project # 1654 Tel: Fax:
Sordoni Construction Services, Inc.
5/27/2014
Reference Number: 0145
Transmitted To:
Transmitted By: Dematic Corp
Todd Plociniak Sordoni Construction Services, Inc. 45 Owen Street Forty Fort, PA 18704 Tel: (570) 287-3161 Fax: (570) 287-0298
Qty
Submittal Package No
Description
Due Date
01
1205-120570-0001 - - 0
Dematic ASRS shop drawings & rack powder coat sample
Transmitted For
Delivered Via
Construction
E-Mail
Items
Qty
Spec Section
120570
01
Cc:
Company Name
Package Action Approved as Noted
Tracking Number
Description automated retrieval system
Type Shop Drawings
Contact Name
Copies Notes
Notes
Item Action Approved as Noted
Remarks Rack powder coat color selection to be determined once matte powder coat sample and galvanized bin sample are received for comparison
Prolog Manager
Printed on: 5/27/2014
Signature
Signed Date
SCS PA
Page 1
APPROVED APPROVED AS NOTED
REVISE & RESUBMIT
FABRICATION/ INSTALLATION MAY BE UNDERTAKEN. APPROVAL DOES NOT AUTHORIZE CHANGES IN THE CONTRACT SUM OR CONTRACT TIME. FABRICATION/ INSTALLATION MAY NOT BE UNDERTAKEN. IN RESUBMITTING, LIMIT CORRECTIONS TO THE ITEMS MARKED.
REVIEW / APPROVAL NEITHER EXTENDS NOR ALTERS ANY CONTRACTUAL OBLIGATIONS OF THE ARCHITECT OR CONTRACTOR
CL
5/23/2014 BY:_________________________________________ DATE:__________ hemmler + camayd architects
GENERAL NOTES: 1. Please provide a set of load calculations with reactions for record. 2. Rack powder coat color selection to be determined once matte powder coat sample and galvanized bin sample are received for comparison.
Bohlin Cywinski Jackson Architecture Planning Interior Design 8 West Market Street, Suite 1200 Wilkes-Barre, Pennsylvania 18701 570.825.8756 Voice 570.825.3744 Fax
Spec Section & Title
Project Name Marywood University - Learning Commons
Submittal No 120570.0001
Submittal Review 12 05 70 ASRS Automated Retrieval System
Scranton, PA
Project No.
Revision No: 0
Submittal Description: ASRS Shop Drawings Date:
BCJ 11104
5/6/2014 LEED applicability
Submittal Comments:
SUBMITTAL REVIEW 0
REVISION NO.
Corrections or comments made on the submittals during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. Approval of a specific item shall not include approval of an assembly of which the item is a component. The contractor is responsible for: confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of all other trades, and performing his work in a safe and satisfactory manner.
Architect's Review Approved Furnish as Corrected Revise and Resubmit Rejected Reviewed Comments Attached By:
HM
Date:
5/23/14
Bohlin Cywinski Jackson Architecture Planning Interior Design
Note: Where attached, refer to Engineer's review stamp for additional comments/markings. Comments contained herein have the same force as if placed directly on the submittal ori
Transmit via:
UPS Overnight
Distribution:
H+C
R+B
UPS 2nd Day SMA
MU
USPS FILE
Email OTHER
Hand Deliver
SUBMITTAL REVIEW COMMENTS Project Name:
Marywood University Learning Commons
Project No:
2416.11
Submittal Name:
DEMATIC ASRS Shop Drawings
Submittal No:
120570-0001
Reviewed By:
TPM
Date Reviewed:
05/231/2014
Specification Section:
120570
Review Comments: The attached shop drawing submittal has been reviewed for the final design loading provided by the ASRS Manufacturer that will be imparted upon the mat slab foundation at the Terrace Level. The attached submittal is being marked “Received for Information” per the shop drawing stamp affixed to the bottom of this Submittal Review Comments sheet. The ASRS manufacturer needs to submit for record the final design loads that their equipment will place on the foundations. It could not be determined from the attached shop drawings the design loads imparted by the ASRS onto the mat slab foundation.
www.reutherbowen.com Phone: 570-496-7020 Fax: 570-496-7021
Approved
Approved as Noted
Not Approved
Revise and Resubmit
x Received for Information
See Attached Comment Sheet
REVIEW OF SUBMITTED INFORMATION IS ONLY FOR CONFORMANCE WITH THE DESIGN INTENT AND FOR COMPLIANCE WITH ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS. DEVIATIONS FROM EITHER WHICH HAVE NOT BEEN EXPRESSLY IDENTIFIED BY THE CONTRACTOR AS A SUBSTITUTION IN WRITING ARE NOT APPROVED. CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFICATION OF FIELD CONDITIONS; FOR COORDINATION, ACCURACY, AND COMPLETENESS OF DIMENSIONS AND QUANTITIES; FABRICATION; CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES; AND COORDINATING ALL PORTIONS OF THE WORK. REVIEW DOES NOT RELIEVE CONTRACTOR FROM THESE OR OTHER OBLIGATIONS UNDER THE CONTRACT.
TPM BY: _________________ 05-23-2014 DATE: _______________ 326 326 W
ARD
S
TREET
-S
120570-0001 (1) SUBMITTAL #: _______________ 2416.11 PROJECT #: ________________
, PA 1851218512-1935
P
CRANTON
: 570.496.7020 / F : 570.496.7021
HONE
www.reutherbowen.com
AX
VIF
VIF
VIF
VIF
CM TO CLOSELY COORDINATE THIS DIMENSION WITH STEEL & DECK INSTALLATION
VIF