Preview only show first 10 pages with watermark. For full document please download

1205.120570.0001 Dematic Asrs Shop Drawings

   EMBED


Share

Transcript

Submittal Transmittal Detailed, Grouped by Each Number 1654 - Marywood Learning Commons 2300 Adams Avenue Scranton, PA 18509 Date: Project # 1654 Tel: Fax: Sordoni Construction Services, Inc. 5/27/2014 Reference Number: 0145 Transmitted To: Transmitted By: Dematic Corp Todd Plociniak Sordoni Construction Services, Inc. 45 Owen Street Forty Fort, PA 18704 Tel: (570) 287-3161 Fax: (570) 287-0298 Qty Submittal Package No Description Due Date 01 1205-120570-0001 - - 0 Dematic ASRS shop drawings & rack powder coat sample Transmitted For Delivered Via Construction E-Mail Items Qty Spec Section 120570 01 Cc: Company Name Package Action Approved as Noted Tracking Number Description automated retrieval system Type Shop Drawings Contact Name Copies Notes Notes Item Action Approved as Noted Remarks Rack powder coat color selection to be determined once matte powder coat sample and galvanized bin sample are received for comparison Prolog Manager Printed on: 5/27/2014 Signature Signed Date SCS PA Page 1 APPROVED APPROVED AS NOTED REVISE & RESUBMIT FABRICATION/ INSTALLATION MAY BE UNDERTAKEN. APPROVAL DOES NOT AUTHORIZE CHANGES IN THE CONTRACT SUM OR CONTRACT TIME. FABRICATION/ INSTALLATION MAY NOT BE UNDERTAKEN. IN RESUBMITTING, LIMIT CORRECTIONS TO THE ITEMS MARKED. REVIEW / APPROVAL NEITHER EXTENDS NOR ALTERS ANY CONTRACTUAL OBLIGATIONS OF THE ARCHITECT OR CONTRACTOR CL 5/23/2014 BY:_________________________________________ DATE:__________ hemmler + camayd architects GENERAL NOTES: 1. Please provide a set of load calculations with reactions for record. 2. Rack powder coat color selection to be determined once matte powder coat sample and galvanized bin sample are received for comparison. Bohlin Cywinski Jackson Architecture Planning Interior Design 8 West Market Street, Suite 1200 Wilkes-Barre, Pennsylvania 18701 570.825.8756 Voice 570.825.3744 Fax Spec Section & Title Project Name Marywood University - Learning Commons Submittal No 120570.0001 Submittal Review 12 05 70 ASRS Automated Retrieval System Scranton, PA Project No. Revision No: 0 Submittal Description: ASRS Shop Drawings Date: BCJ 11104 5/6/2014 LEED applicability Submittal Comments: SUBMITTAL REVIEW 0 REVISION NO. Corrections or comments made on the submittals during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. Approval of a specific item shall not include approval of an assembly of which the item is a component. The contractor is responsible for: confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of all other trades, and performing his work in a safe and satisfactory manner. Architect's Review Approved Furnish as Corrected Revise and Resubmit Rejected Reviewed Comments Attached By: HM Date: 5/23/14 Bohlin Cywinski Jackson Architecture Planning Interior Design Note: Where attached, refer to Engineer's review stamp for additional comments/markings. Comments contained herein have the same force as if placed directly on the submittal ori Transmit via: UPS Overnight Distribution: H+C R+B UPS 2nd Day SMA MU USPS FILE Email OTHER Hand Deliver SUBMITTAL REVIEW COMMENTS Project Name: Marywood University Learning Commons Project No: 2416.11 Submittal Name: DEMATIC ASRS Shop Drawings Submittal No: 120570-0001 Reviewed By: TPM Date Reviewed: 05/231/2014 Specification Section: 120570 Review Comments: The attached shop drawing submittal has been reviewed for the final design loading provided by the ASRS Manufacturer that will be imparted upon the mat slab foundation at the Terrace Level. The attached submittal is being marked “Received for Information” per the shop drawing stamp affixed to the bottom of this Submittal Review Comments sheet. The ASRS manufacturer needs to submit for record the final design loads that their equipment will place on the foundations. It could not be determined from the attached shop drawings the design loads imparted by the ASRS onto the mat slab foundation. www.reutherbowen.com Phone: 570-496-7020 Fax: 570-496-7021 Approved Approved as Noted Not Approved Revise and Resubmit x Received for Information See Attached Comment Sheet REVIEW OF SUBMITTED INFORMATION IS ONLY FOR CONFORMANCE WITH THE DESIGN INTENT AND FOR COMPLIANCE WITH ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS. DEVIATIONS FROM EITHER WHICH HAVE NOT BEEN EXPRESSLY IDENTIFIED BY THE CONTRACTOR AS A SUBSTITUTION IN WRITING ARE NOT APPROVED. CONTRACTOR IS SOLELY RESPONSIBLE FOR VERIFICATION OF FIELD CONDITIONS; FOR COORDINATION, ACCURACY, AND COMPLETENESS OF DIMENSIONS AND QUANTITIES; FABRICATION; CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES; AND COORDINATING ALL PORTIONS OF THE WORK. REVIEW DOES NOT RELIEVE CONTRACTOR FROM THESE OR OTHER OBLIGATIONS UNDER THE CONTRACT. TPM BY: _________________ 05-23-2014 DATE: _______________ 326 326 W ARD S TREET -S 120570-0001 (1) SUBMITTAL #: _______________ 2416.11 PROJECT #: ________________ , PA 1851218512-1935 P CRANTON : 570.496.7020 / F : 570.496.7021 HONE www.reutherbowen.com AX VIF VIF VIF VIF CM TO CLOSELY COORDINATE THIS DIMENSION WITH STEEL & DECK INSTALLATION VIF