Transcript
6 6-574.1 5H081079A A
F February, 2012 2
INSTA ALLATION INSTRU UCTIONS S tw wo-point mounting kit mo odels HD/H HDS (100 & 125 only)), PTC, PTS S T Two-Point Mo ounted Unit Heater
2-P POINT MOU UNTING KIT Mo del Applic cation On o occasion, build ing structures m may not easily accommodate e the sstandard four-p point unit suspe ension on HD/H HDS (100 & For those 125 only), PTC (85 5-310 only), or PTS models. F es, Modine offe ers a two-point mounting convversion kit, case whicch can be used to convert the e unit to two-point suspension. The conversion kit includes two h heavy gauge "C C" channel bracckets and two a angle brackets, along with req quired fasteners s to atttach the brackets to the heater. To e ensure adequatte suspension of the unit is acchieved, follow these e instructions in detail. For ccomplete unit in nstallation instr uctions, please e refer to the la atest revision off the Insta allation & Service Manual thatt shipped with the unit. Thesse are summarrized in Table 1 1.1.
Figu ure 2.2 – Ang gle Bracket Installation Installation n & Service Model Man nual
WAR RNING Gas supply sh hall be shut-off and the electrical power disconnected before proceed ding with the co onversion. s could result in fire, explosio on, electrical Failure to do so shock, or the unit u starting suddenly resultin ng in injury.
HD 100 & 125
6-58 83
HDS 100 & 125
6-58 84
PTC (85–3 310)
6-56 63
PTS
6-56 61
Ass shipped with th e unit, or latest rrevision.
Deta ailed instruc ctions for the e assembly/in nstallation of verse side of the two-point mounting kit a are on the rev s sheet. this
IMPOR RTANT T 1. The use of this manual is specifically inte ended for a qualified ins stallation and service s agency. All installation and service e of these kits must m be perform med by a qualified ins stallation and service s agency. 2. These instrructions must also a be used in conjunction with the Ins stallation and Service S (I&S) Manual M originally y shipped witth the appliance e being converrted, in addition n to any other accompanyin ng component supplier s literature.
THIS MA ANUAL IS TH HE PROPERT TY OF THE O OWNER. PLEASE BE B SURE TO LEAVE IT WITH THE OW WNER WHEN YOU LEAVE E THE JOB.
INS STALLATION – 2-P POINT MO OUNTING G KIT ACC CESSORY Y Ass sembly/Insttallation The rrecommended procedure for assembly a and installation i is descrribed as follows s (refer to Figures 2.1 and 2.3 3): 1.
A Attach both "C"" Channel Brac ckets to the exis sting unit ssuspension holes using the ha ardware supplied with the m mounting kit. Each E bracket is attached using g (2) 3/8"-16 x 1” hex head machine m bolts and a (2) 3/8” flatt washers. R Refer to Figure 2.1.
Figure 2.1 – “C” Bracket Installation
5.
ed to the vertica al supports the angle bracketss are connecte he same heigh ht. Once the un nit is level, tightten the at th nutss from Step 2. Con ntinue with the gas, electric, a and venting insstallation insttructions listed in the I&S Man nual that shippe ed with the ollow all caution nary notes. Re e-check unitt. Be sure to fo thatt the unit is leve el and that noth hing has shifte ed once the insttallation of the u unit has been ccompleted.
Figure 2.2 – Angle Bracket Insttallation 1/2” – 16 x 1-1/2” HE EX HEAD MACHINE BO OLT
3/8” – 16 x 1” HEX HEAD MACHINE BO OLT “C” CHANNEL BRACKET
ANGLE BRAC CKET
3/8” FLA AT WASHE ER
1/2”” FLAT WA ASHER 1/2”” LOCK WA ASHER
1/2” – 16 NUT
d Unit Heate er Figure 2.3 – Two-Point Mounted UNISTRUT T P3000T OR EQUIVA ALENT (BY OTHER RS)
FASTENERS (BY OTHERS)
2.
3.
4.
A Attach one of th he angle bracke ets to the top of o each “C” cchannel. Each angle bracket is attached usiing (3) 1/2”1 16 x 1-1/2” hex head machine e bolts, (3) 1/2” flat washers, (3) 1/2” lock wa ashers, and (3) 1/2”-16 nuts. Refer to F Figure 2.2. Han nd tighten the nuts n to allow un nit balancing in n Step 4. E Ensure that the e vertical suppo orts (Unistrut P3 3000T or e equivalent, by others) o from wh hich the unit will be ssuspended are plumb and rigiidly supported. Raise the u unit to its mounting position an nd align the an ngle brackets w with the vertical supports as shown s in Figure e 2.3. Fasten th kets to the vertical supports (fasteners are he angle brack b by others). A After securing the t unit to the two vertical sup pports, e ensure that the unit is level bo oth front to back and side to sside. The slotte ed mounting ho oles in the “C” channel c a allow the unit to o be moved forward or backw wards until it is le evel front to ba ack. To level th he unit side to side, s ensure Modin ne Manufacturing g Company has a continuous pro oduct improveme ent program, and therefore reserves s the right to change design and sspecifications wi thout notice.
Comm mercial Produ ucts Group Modine M Manufa acturing Compa any 1500 DeK Koven Avenue Racine, Wiscconsin, USA 53 3403-2552 Phone: 1.800.828.4328 (HEAT) www.modinehv w vac.com © Modine Manufacturing Company 2012 6-5 574.1