Preview only show first 10 pages with watermark. For full document please download

2006-05-11 Followup Physical Plant Operations

   EMBED


Share

Transcript

Page 1 of 2 Report: PPO DAVE THOMAS EDUCATION CENTER Walkthrough Date: 05/11/2006 Temp RH CO2 Outdoor Parameters: 91.6 Room Priority 101D Inside Parameters: 2 Room Priority 101J Inside Parameters: 101K Recommendation Temp RH CO2 75.9 47.6 1047 PPO Temperature varied between 74.8 - 79.1 within a span of 4 min. Physical Plant Operations to evaluate and repair as appropriate. Responsible Answer Recommendation Temp RH CO2 76.5 46.1 1060 PPO 2 PPO Inside Parameters: 2 Room Priority 129 Responsible Answer 2 Room Priority Inside Parameters: 50.1 524 Physical Plant Operations to evaluate and repair as appropriate. Temperature varied between 74.3 - 77.6 within 4-5 min. Becoming Physical Plant Operations to warmer. evaluate and repair as appropriate. Temperature varies. Responsible Answer Recommendation Temp RH CO2 76.6 46.9 1076 PPO Water is not poured down floor drain at least once a week. Open drain for dehumidifier, slight odor. Also occupant claims that the unit gets very hot. Fears it is a fire hazard. Physical Plant Operations to evaluate and repair as appropriate. Responsible Answer Recommendation Temp RH CO2 72.1 41.4 1040 No leaks identified. Signs of previous water intrusion as evidenced http://169.139.254.126/riskmgmt/reports.aspx 1/8/2007 Page 2 of 2 1 PPO 2 PPO by staining. FISH 128C - Adjoining Kitchen for ESE adult classroom. It appears that the ventilation system is not adequate based on room activities. Room is used by adult ESE students. http://169.139.254.126/riskmgmt/reports.aspx Physical Plant Operations to evaluate and repair as appropriate. Replace exhaust fan, check flowrate. 1/8/2007