Preview only show first 10 pages with watermark. For full document please download

215019_cover And Index_amiller.rvt - Sheet: _co2

   EMBED


Share

Transcript

KEYNOTES: COPYRIGHT 2017 BY FANNING/HOWEY ASSOCIATES, INC. # 3 MP1 MP1 MP1 AV-VPS-1 5 SP3 W SP3 E 2 2 SP2 W SP1 IS1 2 SB1 SP2 E 2 2 2 ANT 1 1 ANT 1 4 SP4 C B E C KEY PLAN SP4 E 9 7 1 SP5 8 T402 SP5 IS1 6 VC1 VC1 VC1 SP5 8 SP5 SP5 8 SP5 The FUTURE Built SMARTER. ® A Division of 1 N ORT H SECOND FLOOR PLAN - TECHNOLOGY 1/8" = 1'-0" 8900 KEYSTONE XING, SUITE 210 INDIANAPOLIS, IN 46240 317.848.5045 FAX: 317.844.2201 www.imegcorp.com PROJECT # 00161109.00 KJWW CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF KJWW CORP AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF KJWW CORP. © 2017 KJWW CORP. REFERENCE SCALE IN INCHES 0 1 2 3 DATE REV DESCRIPTION AV-PRO-1 IS1 ISSUE DATE: 3.20.2017 IS1 COMM. NO.: AV-ER-1 TP1 WP8 11 9 DRAWN BY: MTB ANT 10 AV-SRGX-W 3/6/2017 2:42:19 PM G CHECKED BY: RCH 9 1 F D 1 SP4 W IS1 H UNIT D SECOND FLOOR TECHNOLOGY PLAN IS1 4 J WHITLEY COUNTY CONSOLIDATED SCHOOLS MP1 www.fhai.com MP1 T101 MP1 Columbia City, IN DN FIELD COORDINATE INTERCOM JACK LOCATION AT CATWALK AND SPOT LIGHT LOCATIONS - SYMMETRICALLY. REVIEW THEATRICAL LIGHTING AND ARCHITECTURAL PLAN FOR ACCESS AND FINAL LOCATIONS, ON SHOPS. PROVIDE CIRCULATING CONDUIT TO AV RACKS (3/4" TYPICAL). 2. FIELD COORDINATION REQUIRED FOR PRECISION LOUDSPEAKER SUSPENSIONS. REFER TO T401 LOUDSPEAKER LOCATION AND AIM SCHEDULE AND INCORPORATE FULLY, FOR CELING CANOPY. AVC ALONE IS RESPONSIBLE FOR ALL PRECISION AIM AND FULL CLEARANCE OF LOUDSPEAKERS AND THIS WORK SHALL NOT BE REASSIGNED. COORDINATE WITH ARCHITECTURAL CLOUDS AND PROVIDE PE RATED SUPPLEMENTAL SUSPENSION PER DIVISION 27 41 01 AND 27 05 01 SPECIFICATIONS. SHOPS REQUIRED BEFORE INSTALLATION. SPACING TO MAINTAIN LOUDSPEAKER SPECIFIED POSITION WITH CLEAR SIGHTLINES FROM SPEAKER FACE TO SEATING, NO EXCEPTIONS. NEVER OCCLUDE FULL COVERAGE ANGLE OF LOUDSPEAKERS AT ANY TIME. FACE SHALL BE FULL CLEAR AND NEARLY FLUSH WITH CANOPY LINE. WHEN SPEAKERS ARE EXPOSED - PULL TIGHT TO WALL OR CEILING, PER LOUDSPEAKER LOCATION AND AIM SCHEDULE AND MANAGE ALL ATTACHMENTS AND CABLE. VERIFY LIFT ACCESS FOR RE-ADJUSTMENTS DURING COMMISSIONING "QUIET DAY". DETAIL SURROUNDING FACE AND GRILL OR OPENINGS ON SHOPS FOR APPROVAL. AVC SHALL BE ON SITE FOR ALL MAIN LOUDSPEAKER MOUNTING NEEDS IN A TIMELY FASHION. 3. COORDINATE SUSPENDED MICROPHONE CEILING PLATE AND CABLE EXTENSION TO STAGE BATTEN, 9' AFF WITH 1' SERVICE LOOP TO BE ADJUSTED DURING COMMISSIONING "QUIET DAY", WITH LIFT. COORDINATE CABLE MANAGEMENT. MICROPHONE CAPSULES SHALL BE EQUALLY SPACED AND SYMMETRICALLY SUSPENDED FROM BATTEN. SEE THEATRICAL AND ARCHITECTURAL DRAWINGS. 4. WIRELESS MICROPHONE ANTENNA AT BOTTOM OF CATWALK. COORDINATE FINAL LOCATION AND MAINTAIN LINE OF SIGHT TO STAGE. KEEP ALL ANTENNA TO MINIMUM 6' FROM DUCT OR OTHER METAL. ADDITIONALLY, MAINTAIN LINE OF SIGHT BETWEEN ANTENNAE AND STAGE. ALLOW COAX CABLE PER MANUFACTURER REQUIREMENTS AND SHOW ON SHOPS FOR MOUNT CONDITIONS AND COAX TYPE. PROVIDE LOW LOSS COAX NOT TO EXCEED 100' TO RACK. OPEN CABLE PERMITTED. 5. AVC TO COORDINATE "QUIET" MOTOR, REMOTE, AND HOUSING WITH PROCENIUM, AND SHOW DETAIL ON SHOPS FOR REVIEW PRIOR TO INSTALLATION. PROVIDE ELASTOMERIC WASHERS ON SUSPENSION MOUNTING TO ISOLATE AND DECOUPLE SCREEN ATTACHMENTS FROM BUILDING STRUCTURE, (1/2" RUBBER WASHERS, TYPICAL). CONFIRM BLOCKING AND LOAD WITH APERTURE OPENING. EXTEND REMOTE CONTROL CABLE TO AVC RACK AS REQUIRED WITH 3/4" CONDUIT, IN ADDITION TO PROJECTOR POWER. 6. LENS CALCULATION REQUIRED ON SHOPS BEFORE PURCHASE. MOUNT WITH 1" THICK 4'x3' SURFACE AREA COVERAGE ACOUSTICAL PANEL AT PROJECTOR MOUNT. REFERENCE PRODUCT IS KINETICS NOISE CONTROL HARDSIDE - BEVEL EDGE. GUILFORD OF MAINE FABRIC - BLACK. AVC TO COORDINATE. PROVIDE SIZE AT 12 SF AND APPLY TO CEILING AS REQUIRED AROUND MOUNT AND PROJECTOR FAN. DETAIL ON SHOPS FOR PROJECTOR MOUNT, SAFETY CABLE, AC POWER COORDINATION, AND CABLE MANAGEMENT BEFORE INSTALLATION. KEEP PROJECTOR FAN AWAY FROM ALL USERS AS POSSIBLE AND MOUNT HIGH IN OPENING. 7. AWP MAY BE ABOVE VOLUME CONTROL AT 42"-48". 8. SYMMETRICAL PLACEMENT. 70 VOLT, REAR ROOM CEILING CIRCULATING CABLE TO LOCAL VOLUME CONTROL. TAP AT 2 WATTS, UON. 9. PAINT SPEAKER AND SPEAKER BRACKET AS DIRECTED BY ARCHITECT FOR COLOR TO MATCH CANOPY. VERIFY WITH LIFT ACCESS AVAILABLE AND DENOTE ON SHOPS. 10. REFER TO DETAIL 1/T201 FOR AC POWER REQUIREMENTS TO AV SYSTEM. 11. PROVIDE EC WITH APPROPRIATE GUTTER BOXES FOR CONDUIT ENTRANCE AT RACK, TYPICALLY 6"x24"x6" DEEP AT LOW AND HIGH POSITIONS AS REQUIRED. SEPARATE ALL AV FROM ALL POWER ALWAYS - NEVER COMBINE. SEPARATE ALL MICROPHONE CABLE FROM ALL OTHER CABLE, ALWAYS. PROVIDE CLEAR WORKING DISTANCE (2' MINIMUM) BEHIND FLOOR AV RACKS AND MANAGE AV CABLE AS REQUIRED TO PROTECT AND SEPARATE. COORDINATE THIS LOCATION IN ADVANCE ON SITE WITH DIV 26. PROVIDE ELABORATION AND DETAILS ON AV SHOPS. NEW COLUMBIA CITY HIGH SCHOOL 1. NEW COLUMBIA CITY HIGH SCHOOL 00161109.00 A