Preview only show first 10 pages with watermark. For full document please download

757 Task Card

   EMBED


Share

Transcript

STATION BOEING CARD NO. 24-031-01 TAIL NO. AHY DATE WORK AREA SKILL AVION RELATED TASK INTERVAL AFT CARGO 1C TASK TITLE CLEAN AIRLINE CARD NO. 757 TASK CARD PHASE MPD REV TASK CARD REVISION 11212 009 SEP 28/02 STRUCTURAL ILLUSTRATION REFERENCE APU BATTERY CHARGER APPLICABILITY AIRPLANE ENGINE ALL ZONES 154 MECH ALL ACCESS PANELS 822 MPD ITEM NUMBER INSP CLEAN (OFF-AIRCRAFT) THE APU BATTERY CHARGER IN ACCORDANCE WITH THE INSTRUCTIONS IN THE VENDOR'S COMPONENT MAINTENANCE MANUAL. 24-31-04-4A THE FOLLOWING PROCEDURE APPLIES TO THE ON-AIRCRAFT PORTION OF THIS TASK (REMOVAL/INSTALLATION): 1. Remove the APU Battery Charger ______________________________ A. References (1) B. C. AMM 20-10-01/401, E/E Rack Mounted Components Access (1) Location Zone 154 Aft cargo compartment (Right) (2) Access Panel 822 Aft cargo compartment door Prepare for Removal CAUTION: _______ (1) Open this circuit breaker on the right miscellaneous electrical equipment panel (referred to as the P37 panel) and attach a DO-NOT-CLOSE tag: (a) 1 4 0 5 EFFECTIVITY OPEN THESE CIRCUIT BREAKERS IN THE SEQUENCE SHOWN TO PREVENT DAMAGE TO THE APU BATTERY CHARGER. 37B5 OR 37K2, BATTERY CHARGERS APU CLEAN 24-31-04-4A APU BATTERY CHARGER 24-031-01 PAGE BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 1 OF 5 SEP 28/00 BOEING CARD NO. 24-031-01 AHY MECH INSP (2) Open this circuit breaker on the aft equipment center rack (referred to as the E6 rack) and attach a DO-NOT-CLOSE tag: (a) (3) (4) 2. B. Do these steps to disconnect the APU battery charger: (a) Open the front cover on the E6 rack. (b) Remove the electrical connector from the battery charger. (c) Remove the terminal cover from the battery charger. (d) Identify the wires on the terminals for installation. (e) Remove the wires from the terminals on the battery charger. Remove the battery charger (AMM 20-10-01/401). References (1) AMM 20-10-01/401, E/E Rack Mounted Components (2) AMM 24-22-00/201, Electrical Power - Control Access (1) (2) C. Location Zone 154 211/212 Aft cargo compartment (Right) Flight compartment Access Panel 822 Aft cargo compartment door Install the battery charger (1) Install the battery charger (AMM 20-10-01/401). (2) Do these steps to connect the battery charger: (a) EFFECTIVITY APU BAT CHGR Install the APU Battery Charger _______________________________ A. 1 4 0 6 AIRLINE CARD NO. 757 TASK CARD Install the wire, washer, lockwasher and nut on the positive terminal of the battery charger. CLEAN 24-31-04-4A APU BATTERY CHARGER 24-031-01 PAGE BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 2 OF 5 SEP 28/00 BOEING CARD NO. 24-031-01 AHY MECH INSP CAUTION: _______ (3) (b) Tighten the nut on the positive terminal of the battery charger to 170-190 inch-pounds (19.2-21.5 Newton meters). (c) Install the wire, washer, lockwasher and nut on the negative terminal of the battery charger. (d) Tighten the nut on the negative terminal of the battery charger to 135-145 inch-pounds (15.3-16.4 Newton meters). (e) Install the terminal cover on the battery charger. (f) Connect the electrical connector to the battery charger. (g) Close the front cover on the E6 rack. CLOSE THESE CIRCUIT BREAKERS IN THE SEQUENCE SHOWN TO PREVENT DAMAGE TO THE APU BATTERY CHARGER. Remove the DO-NOT-CLOSE tag and close this circuit breaker on the E6 rack: (a) (4) D. EFFECTIVITY APU BAT CHGR Remove the DO-NOT-CLOSE tag and close this circuit breaker on the P37 panel: (a) 1 4 0 7 AIRLINE CARD NO. 757 TASK CARD 37B5 OR 37K2, BATTERY CHARGERS APU Do a test of the battery charger installation (1) Supply electrical power (AMM 24-22-00/201). (2) Make sure the six EICAS circuit breakers on the overhead circuit breaker panel, P11, are closed. (3) Do a test of the APU battery charger, as follows: (a) Push the ELEC HYD switch on the EICAS MAINT panel on the right side panel, P61. (b) Make sure the BAT switch on the standby power panel (P5) is in the ON position. (c) Turn the STBY POWER switch on the P5 panel to the BAT position for approximately one minute. CLEAN 24-31-04-4A APU BATTERY CHARGER 24-031-01 PAGE BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 3 OF 5 SEP 28/00 BOEING CARD NO. 24-031-01 AHY MECH INSP (d) Make sure this value is below APU/BAT on the bottom EICAS display: 1) (e) DC-V = 24 | 4 Turn the STBY POWER switch on the P5 panel to the AUTO position. NOTE: ____ (f) Watch the EICAS display closely. display will change quickly. 1) DC-A value increases quickly to 38 | 5 2) DC-V value increases to 32 | 4 then decreases to 28 | 2 3) (4) EFFECTIVITY The values on the Make sure these values show below APU/BAT on the bottom EICAS display: NOTE: ____ 1 4 0 8 AIRLINE CARD NO. 757 TASK CARD It will usually take less than one minute for the voltage value to increase and then decrease. A fully discharged battery can extend this time to 75 minutes. After the DC-V value decreases to 28 | 2, make sure the DC-A value is 0 | 5. Remove electrical power if it is not necessary (AMM 24-22-00/201). CLEAN 24-31-04-4A APU BATTERY CHARGER 24-031-01 PAGE BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 4 OF 5 SEP 28/00 BOEING CARD NO. 24-031-01 AHY AIRLINE CARD NO. 757 TASK CARD AFT CARGO DOOR AFT CARGO DOOR AFT EQUIPMENT CENTER RACK, E6 SEE APU BATTERY CHARGER A SEE B FWD AFT EQUIPMENT CENTER RACK, E6 A 1 ELECTRICAL CONNECTOR WASHER LOCKWASHER NUT TERMINAL BLOCK COVER WASHER WIRES SCREW WASHER LOCKWASHER NUT 1 FWD APU BATTERY CHARGER BATTERY CHARGER WITH THE CHARGER AND BATTERY LEDs B APU Battery Charger Installation Figure 401 EFFECTIVITY L26639 1 4 0 9 CLEAN 24-31-04-4A APU BATTERY CHARGER 24-031-01 PAGE BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 5 OF 5 SEP 28/02