Introduction The Active Platforms Copper Cable Management Solution provides cable management functions for CISCOTM 6509 equipment mounted within a frame or enclosure. This publication provides instructions for installing and using the copper cable management solution.
1
Verify frame/enclosure dimensions. The cable management solution is designed around CISCO 6509 equipment to be installed on a frame or enclosure with the dimensions shown below. NOTE:
2
Verify cable management components. The ADC cable management components required for this procedure are shown below. Verify that all the components are on hand in the specified quantities.
Doors, side panels, and other accessories are not shown here. For details, contact the manufacturer of the frame or enclosure.
40 IN. (102 CM) MINIMUM
28 IN. (71 CM) MINIMUM
VERTICAL CABLE GUIDE (1)
REAR CABLE MANAGER (2)
FIBER BRACKET (3)
CABLE RING (7) CONVOLUTED TUBING (1)
42 RU MINIMUM
CAT 6 PATCH PANEL AND CABLE BARS (7) CROSS OVER TROUGH (1)
23441-A
1468425 Rev A
HORIZONTAL SLACK STORAGE PANEL (2)
2 RU BLANK PANEL (2) 23442-A
Page 1 © 2009, ADC Telecommunications, Inc
ADCP-80-378 Issue 1 5/2009
3
Adjust frame front and rear vertical mounting flanges. Adjust the front and rear mounting flanges to the specified dimensions. NOTE:
The spacing shown for the front flanges is critical. Without the proper spacing, it will be impossible to mount the front cable management panels in the recommended location. Cable management, access, and fill capacity will be insufficient.
4
Install cross over trough, active equipment, and 2RU blank plates. Mount cross over trough in bottom rack location or first two rack spaces. Directly above it, mount a 2RU blank plate and above that mount active equipment support rails (refer to 6509 documentation). Slide in active equipment on support rails. Do not torque down right side active equipment mounting flange. Mount second 2RU blank plate in rack space directly above active equipment. Ground in location shown.
REAR
TOP VIEW OF FRAME
REAR FLANGES 16.25 IN. (41.3 CM)
PLACEMENT OF ACTIVE EQUIPMENT SHOWN IN GREY FRONT FLANGES
10.5 IN. (26.7 CM)
ACTIVE EQUIPMENT
FRONT
BLANK PLATE REAR VERTICAL MOUNTING FLANGES
LINECARD MOUNTING SLOTS
FRONT VERTICAL MOUNTING FLANGES BLANK PLATE
23444-A
CROSS OVER TROUGH
GROUND 23445-A
Page 2 © 2009, ADC Telecommunications, Inc
ADCP-80-378 Issue 1 5/2009
5
Install linecard vertical cable guide.
6
Install horizontal slack storage panel. Install one horizontal slack storage panel directly above the top 2RU blank plate, with radius opening to the left. Install the remaining slack storage panel with opening to the right. Ground in locations shown.
Install the linecard vertical cable guide on the lower right side of the frame as shown below. Attach the cable guide to the right front vertical mounting flange. Remove screws from the active equipment mounting bracket as needed. Replace screws to secure to the mounting flange. Torque down all right side mounting hardware. Ground in location shown.
SLACK STORAGE PANELS
TOP OF INSTALLED LINECARD VCG
VERTICAL CABLE GUIDE
RADIUS OPENINGS
GROUND (BACKSIDE)
GROUND
LINECARD MOUNTING SLOTS
23446-A
23448-A
Page 3 © 2009, ADC Telecommunications, Inc
ADCP-80-378 Issue 1 5/2009
7
Install patch panels. Install three patch panels with three cable rings on the left side of the angle jacks, as shown below. Angle the 6-packs on the three panels to the left. Install four patch panels with four cable rings on the right side of the angle jacks, as shown below. Angle the 6-packs on the four panels to the right. Ground in locations shown.
FRONT VIEW
FOUR CABLE RINGS
THREE CABLE RINGS
GROUND LOCATIONS
BOND TO OTHER CABLE RINGS USING SCREWS PROVIDED
CABLE RING
CAT6 PATCH PANEL 23449-A
Page 4 © 2009, ADC Telecommunications, Inc
ADCP-80-378 Issue 1 5/2009
8
Install the rear cable manager. Install the rear cable manager on the right and left side of the frame or enclosure as shown below. Ground in locations shown.
GROUND
GROUND
REAR CABLE MANAGER
SCREW TO BE FLUSH WITH THREADED INSERT
CABINET RAIL
CABINET RAIL
REAR CABLE MANAGER
MOUNTING BRACKET SCREW (2) MOUNTING BRACKET
MOUNTING BRACKET SCREW (2)
INITIAL INSTALLATION
MOUNTING BRACKET
FINAL INSTALLATION
23450-A
Page 5 © 2009, ADC Telecommunications, Inc
ADCP-80-378 Issue 1 5/2009
9
Install the cable bars. Install cable bars as shown.
NOTE:
Wait to install cable bars until each cable patch panel is punched down.
FOR CLARITY CABLES ARE NOT SHOWN
23451-A
Page 6 © 2009, ADC Telecommunications, Inc
ADCP-80-378 Issue 1 5/2009
10
Install divider brackets. Install brackets on right front corner of rack.
FRONT
FIBER BRACKET
CONVOLUTED TUBING
23465-A
Page 7 © 2009, ADC Telecommunications, Inc
ADCP-80-378 Issue 1 5/2009
11
Install cables. When installing a patch cord, first connect it to the active equipment, then connect it to the patch panel, then route the patch cord appropriately through the cable guides. Refer to the diagrams below.
TOP ENTRY
CABLES CAN ENTER ENCLOSURE FROM TOP OR BOTTOM
BOTTOM ENTRY
7-FOOT
11-FOOT 23454-A
REAR CABLE MANAGEMENT 23453-A
FRONT CABLE MANAGEMENT Routing and Zoning
ADC Telecommunications, Inc. PO Box 1101, Minneapolis, MN 55440-1101 USA 1-800-366-3891 Ext. 73475 Technical Assistance Center (TAC)
[email protected] © 2008, ADC Telecommunications, Inc. All Rights Reserved
Page 8 © 2009, ADC Telecommunications, Inc