Preview only show first 10 pages with watermark. For full document please download

Align Gen Ii 3 Installation Instructions 1) Attach Track To Wall 2

   EMBED


Share

Transcript

Align Gen II 3 Installation Instructions 1) Attach track to wall 2) Assemble CPU Holder: 3) Attach vertical mount to CPU Holder: To install at optimal height, mount bottom of track 22” from the floor. Be sure to use drywall anchors when not mounting to studs. Be sure track is completely straight. Use all available holes Using center rectangular plate, assemble CPU Holder with wing nuts 4) Insert wire manager sheath Attach vertical mount to CPU Holder using the three screws and then slide it on the top of the track and tighten in place 5) Insert gas arm, then extension arm, then vesa mount. Then attach monitor Score wire manager sheath with razor at the desired length. Then snap it. Insert into track. Next slide in monitor arm’s vertical mount and tighten. 7) Attach keyboard tray 6) Insert next wire manager sheath Score wire manager sheath with razor at the desired length. Then snap it. Insert into track. Next slide in monitor arm’s vertical mount and tighten. Attach monitor and adjust gas spring tension so it floats freely. 8) Tighten all set screws Turn vesa mount so it faces the ceiling. Attach keyboard tray to it with included 4 screws and cap nuts. Attach mouse guard and mouse pad. Adjust gas arm tension so keyboard tray floats freely. In both adjustable gas arms there are 3 set screws in each joint. Tighten them to touch only, do not over tighten. They are meant to lock the arms in and stop any “float.” over tightening will inhibit arm movement. Score wire manager sheath with razor at the desired length. Then snap it. Insert into track. Next slide in keyboard tray’s vertical mount and tighten.