Instruction Sheet
AMP NETCONNECT* Back Cable
408-10170
Manager Kits 1933352-[ ] for MRJ21* and Other High-Density Patch Panels
Thumb Screw (Qty: 2)
28 AUG 07
Rev A
3. INSTALLATION 3.1. Mount to the Rack A. Back Mount
Align each bracket with the back of the rack so that the short leg faces out. Secure the brackets with the mounting screws included with the cable manager. Refer to Figure 2, Detail A.
Tie Down Bar
B. Front Mount
Left Support
Right Support
Bracket
Bracket
If the cable manager will be using the same holes of the rack as the patch panel (as shown in Figure 2, Detail B), the cable manager must be installed onto the rack before the patch panel. Align each bracket with the front of the rack so that the short leg faces out. Secure the brackets and the patch panel with the mounting screws included with the patch panel. Refer to Figure 2, Detail B.
Detail A Ċ
Back Mount
Mounting Screw (Qty: 4)
Figure 1
Use
Cable Manager
Mounting Screws
1. INTRODUCTION
Back Cable Manager Kits 1933352–[ ] are used to provide strain relief, support, and distribution of cables in horizontal and vertical routing from the patch panel. The cable manager is capable of supporting loads associated with large diameter cable. The cable manager is designed to be mounted onto a standard 483–mm [19–in.] Electronic Industries Alliance (EIA) rack or equipment cabinet. NOTE
Patch Panel
Back of
(Ref)
EIA Rack (Ref)
Detail B Ċ
Front Mount
Dimensions in this instruction sheet are in metric units [with U.S. customary units in brackets].
i
Figures are not drawn to scale.
Front of EIA Rack
To obtain information on AMP NETCONNECT products, call PRODUCT INFORMATION at the number at the bottom of this page, or visit the AMP NETCONNECT website at www.ampnetconnect.com.
(Ref)
Patch Panel (Ref)
2. DESCRIPTION
Each cable manager patch panel kit consists of a left support bracket, right support bracket, tie down bar, 2 thumb screws, and 4 mounting screws. The tie down bar and the brackets have slots for securing the cable. Refer to Figure 1.
E
2007 Tyco Electronics Corporation, Harrisburg, PA
All International Rights Reserved
Use
Patch Panel
Mounting Screws Note: Figures shown with cable manager and patch panel using same holes of rack.
Figure 2
TOOLING ASSISTANCE CENTER 1-800-722-1111
This controlled document is subject to change.
PRODUCT INFORMATION 1-800-522-6752
For latest revision and Regional Customer Service,
TE logo and Tyco Electronics are trademarks. *Trademark. Other products, logos, and company names used are the property of their respective owners.
visit our website at www.tycoelectronics.com
1 of 2 LOC B
408-10170
Back Cable Manager Kits 1933352-[ ] 3.2. Attach the Tie Down Bar
3.3. Secure the Cable
1. Align the mounting holes of tie down bar with the ends of the brackets so that the slots of the tie down bar are oriented either horizontally (shown in Figure 3, Detail A) or vertically (shown in Figure 3, Detail B). 2. Thread the thumb screws through the top holes, then hand–tighten the thumb screws.
Using AMP–TY* Cable Tie 604772–[ ] or Hook–and– Loop Cable Tie 1375253–[ ] (both made of nylon), or similar cable fasteners, secure the cable to the tie down bar and/or the brackets. The cable can be secured over or under the tie down bar and to the inside or outside of the brackets. Distribute the cables evenly. See Figure 4. CAUTION
Attaching Tie Down Bar Detail A
To avoid damage to the cable, DO NOT over-tighten the cable fasteners.
! DO NOT exceed the maximum total load of 9 kg [20 lbs].
Slots Oriented Horizontally
Securing Cable Over Tie Down Bar and
Inside of Bracket and
Under Tie Down Bar
Outside of Bracket
Detail B Slots Oriented
Patch Panel
Vertically
(Ref)
Figure 4
4. REVISION SUMMARY S Initial release of instruction sheet
Figure 3
2 of 2
Tyco Electronics Corporation
Rev
A