Preview only show first 10 pages with watermark. For full document please download

Ap Installation Guide

   EMBED


Share

Transcript

Document Number SYN20160304 Based on Template Created By AP Installation Guide Modification History Date Change log 2016/3/4 Initial release document Author 1 Revision 0.2.1 Directory Chapter 1 Basic equipment ....................................................................................................... 4 1.1 AP assembly framework illustration: ........................................................................... 4 1.2 Standard equipment illustration: .................................................................................. 5 Chapter 2 AP system assembly directions ................................................................................. 8 2.1.1 Install on post ........................................................................................................... 9 2.1.2 Installing on the wall .............................................................................................. 14 Chapter 3 Base Station Installation Reference ........................................................................ 21 3.1 Wall type installation: ................................................................................................ 22 3.2 Base type installation: ................................................................................................ 29 Drawing directory Figure 1 System framework illustration ................................................................. 4 Figure 2 Basic equipment illustration ......................................................................... 5 Figure 3 Actual basic equipment ................................................................................ 6 Figure 4 AP exterior of the front and back ................................................................. 8 Figure 5 Equipment installation procedure ................................................................. 9 Figure 6 Base installation 1....................................................................................... 11 Figure 7 Base installation 2....................................................................................... 12 Figure 8 Pole installation 1 ....................................................................................... 13 Figure 9 Pole installation 2 ....................................................................................... 13 Figure 10 The distance between the two wall holes ................................................. 14 Figure 11 Illustration of stainless steel external screw anchor ................................. 15 Figure 12 Install base rotary shaft............................................................................. 15 Figure 13 Install base ................................................................................................ 16 Figure 14 Connect grounding wire ........................................................................... 16 Figure 15 Installation complete ................................................................................ 17 Figure 16 Connect RF cable ..................................................................................... 18 Figure 17 Installation steps ....................................................................................... 19 Figure 18 Power over Ethernet installation description ............................................ 20 2 Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure 19 A complete wall installation ..................................................................... 22 20 Mount kit fixing on the wall surface -1 .................................................... 22 21 Mount kit fixing on the wall surface -2 .................................................... 23 22 Measure with level ................................................................................... 24 23 Customized metal piece -1 ....................................................................... 24 24 Customized metal piece -2 ....................................................................... 25 25 Customized metal piece -3 ....................................................................... 25 26 Customized metal piece -4 ....................................................................... 26 27 Customized metal piece -5 ....................................................................... 26 28 Lightning arrester equipment grounding -1 .............................................. 27 29 Lightning arrester equipment grounding -2 .............................................. 27 30 6/8" inch PVC soft pipe covering the network cable route ...................... 28 31 An example of a completed base station .................................................. 29 32 Base of the base station-1 ......................................................................... 30 33 Base of the base station-2 ......................................................................... 30 34 Base of the base station-3 ......................................................................... 31 Table Directory Table 1 System related specifications ............................................................................ 6 Table 2 AP installation description ................................................................................ 8 Table 3 Bracket parts list ............................................................................................... 9 Table 4 Descriptions for each part ............................................................................... 10 Table 5 Bracket parts list ............................................................................................. 14 Table 6 Connect RF cable ............................................................................................ 18 3 Chapter 1 Basic equipment 1.1 AP assembly framework illustration: l l l l l l l l AP Antenna 915MHz*2 Lightning arrester*2 Antenna 2.4G Hz*1 GPS Antenna*1 PoE WAN Power RF Cable Ethernet Power Distance at least 100 cm Antenna 915MHz Antenna 915MHz Lightning arrester Lightning arrester AP Antenna 2.4GHz GPS Antenna 1.5GHZ WA N Poe Input:100-240V ~0.8A 50-60Hz Output:56V 0.536A Figure 1 system framework illustration 4 Power 1.2 Standard equipment illustration: Figure 2 Basic equipment illustration 5 10 9 7 4 8 1 6 3 Figure 3 Actual basic equipment Table 1system related specifications Item specification list No. Name Quantity Note Access Point (AP)end 3. GPS Antenna(1.5GHz) with Mount kit with RF Cables 1 l Frequency Range :1575.42 ± 1.023 MHz. l Gain : 90° : 5.0 dBi Min. 20° : -2.0 dBi Min. Mounted on the 60mm*60mm ground plane. l Polarization : RHCP l Axial Ratio : 90° : Max 3.0dB Mounted on the 60mm*60mm ground plane. 4. Mount kit 1 6. Waterproof connector 1. RJ45 CABLE CONNECTOR ASS'Y (R) WAPA-216N29WW OUTDOOR ODS 7. RF cable 8. Antenna(2.4GHz) 1 3 Meter RF cable(Return loss < -20dB) DIPOLE ANT. W/O CABLE (R) TSKY A8-A003-00109 11b/g/n 1.38dBi WHITE OUTDOOR OMNI FIBERGLASS PIPE 110mm N-TYPE PLUG WAPS-232N 9. Power code 1 Configured according to the connectors of different countries 10. Power over Ethernet (PoE) 1 l Power over Ethernet Output: Pin Assignment and Polarity:4/5 (+), 7/8 (–) 6 Output Power Voltage: User Port Power: l 30Watts (Guaranteed) Input Power Requirements: AC Input Voltage: 100 to 240 Vac AC Input Current: 0.8A @100-240Vac AC Frequency: l 55Vdc 50 to 60 Hz Environmental Conditions Operating Ambient Temperature: -4º to 104ºF (-20 to 40ºC) @ 30W -4º to 131ºF (-20 to 55ºC) @ 22.5W Operating Humidity: Maximum 90%, Non-condensing Storage Temperature: -4º to 158ºF (-20º to 70ºC) Storage Humidity: Maximum 95%, Non-condensing l Regulatory Compliance IEEE 802.3at (PoE,) RoHS Compliant, WEEE Compliant, CE l Power cord: connect to PoE Input/Output:220V Ethernet Cable (provided by buyer) 2 one is connected PoE, one is connected WAN Antenna(915MHz) with Mount kit with RF Cables 2 l 6, 7.2 or 10 dBi Antenna for Lora Gain(dBi) 7.2 10 Length(cm) 130 155 170 VSWR <1.5 <1.5 l 6 <1.5 the distance between the two antennas must be 100 cm Lightning arresting equipment l 2 VSWR < 1.5 Node end 1. 2. Node Antenna((915MHz)) GPS node 902MHz~928MHz / ≥ 0 dBi/SMA plug (male pin) 1 1 7 Chapter 2 2.1 AP system assembly directions AP exterior : Figure 4 AP exterior of the front and back Table 2 AP installation description 1 3 2 4 915MHz 5 2.4GMHz 915MHz 1.5GMHz Connect to Enthenet N-typ female N-type female Connect to Ethernet 8 Access Point(AP) Size:230*200*68mm 1.Connect 915 MHz Antenna (N-typ female) 2.Connect 915 MHz Antenna (N-typ female) 3.Connect 2.4GHz Antenna (N-typ female) 4.Connect Ethernet to PoE (match with waterproof connector and lock to AP) 5.Connect GPS 1.5GHz Antenna (N-typ female) 2.2 Equipment installation Installation of the support rod for this equipment and wall surface installation, procedures are as follows Install to the mast Install to the wall support Start surface Start Fix grounding wire on equipment Fix grounding wire on equipment Install equipment on mast Install equipment on the wall Install outdoor antenna and lightning arrester Install outdoor antenna and lightning arrester Connect power and data cable Connect power and data cable Complete Complete Figure 5 Equipment installation procedure 2.1.1 Install on post Pre-installation preparatory work Before installation, please prepare the following tools: Allen wrench (M5 and M8) or adjustable wrench, Phillips screwdriver Before installation, please check whether all parts for the mounting bracket are there, total of: Table 3 Bracket parts list Items Name Quantity 1 Outdoor AP 1 2 Base 1 3 Base shaft 1 4 Shaft fixing plate x1 1 5 Screw pack (screws needed for the installation are inside ) 9 1 set For details, please see the following list Table 4 Descriptions for each part Mounting Kit, Descriptions for each part Item: 1 Quantity: 1 Base Item: 5 Quantity: 1 Base rotary Item: 2 Quantity: 4 Screws M5*20 mm Item: 6 Quantity:14 Screws M5*20 mm Item: 10 Quantity:5 Washer M8 Item: 7 Quantity:1 Item: 11 Quantity:6 Spring Washer M8 Item: 3 Quantity:5 Spring Washer M5 Item: 4 Quantity:4 Washer M5 Screws M5*35 mm Item: 8 Quantity:1 Washer M8 Item: 9 Quantity: 1 Rotary shaft fixing plate Item: 12 Quantity:3 Nut M8 Item: 13 Quantity: 2 Screws M8*100 mm The mounting kit required for mast installation and wall installation bracket, screws, external type screw anchors are not standard parts for this product. Purchase additionally if required 10 Step1 Fix the mount kit bracket base on the AP, as shown in the following figure Figure 6 Base installation 1 11 Step2 Stick the base rotary shaft into the base and screw in the fixing screws (adjust the screws) (please note, at this time the fixing screws and the adjustment screws do not need to be too tight, adjust slightly until tight ) Slightly adjust screw pad Slightly Fixing screw pad adjust Fixing screw Figure 7 Base installation 2 12 Step 3 Place AP on an appropriate place on the pole, screw on the rotary shaft fixing plate to fix AP, tighten the rotary shaft fixing screws and adjustment screws separately (AP recommend placing the Ethernet interface downward when installing) Figure 8 Pole installation 1 Step 4 Connect grounding cable, the grounding hole location is located in the AP corner, indication symbol. It is recommend that the ground wire resistance be less than 5 ohms. The underground cable cross section should be less than 6 mm2. Figure 9 Pole installation 2 13 2.1.2 Installing on the wall Pre-installation preparatory work Before installation, please prepare the following tools: Allen wrench (M5 and M8) or adjustable wrench, Phillips screw driver, impact drill or drill bit (drill diameter should be Φ 12.7 mm), tape measure that is longer than 120 mm, hammer Before installation, please check whether all parts for the mounting bracket are there, total of: Table 5 Bracket parts list Items Name Quantity 1 Outdoor AP() 1 2 Base 1 3 Base shaft 1 4 Screw pack(screws needed for the installation are inside ) 1 set 5 Stainless steel external screw anchor 1 set Step1: Wall hole position Select a suitable position on the wall, use a ruler to measure out the distance between the two wall holes, which should be 114 mm, the diameter of the drill bit should beΦ12.7 mm use an impact drill to drill a 38.1 mm deep hole. As shown in figure below Wall 墊墊 墊墊 Figure 10 The distance between the two wall holes Step2:Tap in the stainless steel external screw anchor After drilling holes in the wall with an impact drill, tap in stainless steel external 14 screw anchors into the holes. As shown in figure below Figure 11 Illustration of stainless steel external screw anchor Step 3: Install base rotary shaft Use Allen wrench to fix the base rotary shaft tightly on the wall, as shown in below figure Figure 12 Install base rotary shaft Step4: Installing the base and ground wire Install the mounting kit bracket base AP, and connect grounding wire, the grounding hole is in the AP corner, indicator symbol, use M5 x 8 mm screw to fix. 15 Figure 13 Install base Ground wire Figure 14 Connect grounding wire Step5: Fix screw, to complete installation Slip AP the connecting bracket base on the base rotary shaft, use M8 x 50 mm fixing screw and nut to thread through the center hole of the sleeve of the bracket base rotary shaft and tighten, AP adjust top and bottom until it is in the appropriate position, then use M5 x 35 mm adjustment screw to tighten and fix the device, as shown below 16 Fixing screw pad Adjustment screw 墊墊 Figure 15 Installation complete Step 6: Connect RF cable RF cable is used to connect the antenna to the equipment. Note: Please install the antenna lightning arrester between the antenna and the equipment. Empty load is prohibited for the antenna connector of high power equipment or else the equipment can be damaged. The warranty does not cover damage caused by empty load. 17 Figure 16 Connect RF cable Table 6 Connect RF cable 1 N type connector’s RF cable 3 Antenna lightning arrester 2 Antenna lightning arrester grounding wire. 4 Antenna connector Installation procedure: 1. Connect one end of the antenna lightning arrester to the antenna connector. 2. Connect the RF cable to the other end of the antenna lightning arrester. Step7: Connect power and data cables Note: This product does not include power and data cables. Purchase additionally if required. l For cables, please use 802.3at specification network cable l For power, please use 802.3at protocol specification POE + switch Installation and fixing of the data cable waterproof connector Outdoor AP uses special Ethernet waterproof connector. The equipment comes with a set of waterproof connectors (waterproof package), must pass through RJ-45 first before installing the Ethernet. Then compress the Ethernet cable connector; for the Ethernet cable, please use STP outdoor shielding. Please complete shielding and AP grounding. To install the waterproof head, please reference the following steps. When installing, please tighten the screw nut to prevent moisture from seeping into the AP. 18 ① Place metal ② Set the seal into the ③ Pass Ethernet screw nut into the waterproof connector clamp, and place it in the end of the main device cable through various parts of the waterproof connector RJ-45 cable pad Nut Seal Clamp ④ Compress the Sealing screw cap ⑤ Push the Ethernet ⑥ Pass the Ethernet cable connector Compress the Ethernet cable connector waterproof liner through the Ethernet connector and glue on well Ethernet cable connector cable connector into the main body of the device, then tighten the sealing screw nut Description of various parts Screw cap pad Clamp Seal Waterproof gasket Ethernet cable connector Metal nut Main body Waterproof gasket Side view Waterproof gasket Sealing screw cap Clamp Seal Metal nut Main body Ethernet cable connector Figure 17 Installation steps Note: Assembly of cable components must be conducted by a qualified electrician. 19 1. Equipment conforms to IP-67 waterproof level. 2. After installation is complete, recommend using waterproof tape to wrap the Ethernet opening and the antenna opening to improve waterproofing. 2.3 Power: Power is provided through the PoE to the AP power. Can verify whether PoE is working normally through light signals. l Power over Ethernet (PoE): Ø Output: connect AP Ø Ø Input: connect WAN Power Code: AC Input Voltage: 100 to 240 Vac AC Input Current: 0.8A @100-240Vac AC Frequency: 50 to 60 Hz Figure 18 Power over Ethernet installation description 2.4 WAN: AP needs the WAN to return data to the Serverend. For this purpose, the WAN is connected to the AP PoE In port position. 20 Chapter 3 Base Station Installation Reference Because of the installation location, station installation can be generally categorized as wall installation and base installation. Generally speaking, wall installation is the preferred choice. This is because compared with base installation, drilling holes in walls is less likely to create roof leaks (just pay attention to whether there are pipes behind the wall or if there is a water tower at the top) and has lower cost. However, actual installation method must be determine by the electrician and the owner. Additional notice 1. The network cable used cannot exceed 100 (m).The location of the base station will affect the length of cable used along the cable route. 2. The antenna height shall not exceed 45 degrees the height of the lightning arrester’s protective corners. 3. RF Cable length will produce a certain amount of attenuation. 4. Waterproofing must be conducted for the installation site. 5. Antenna should be installed in a location without obstructions. Make sure that the antenna is in a vertical position. 6. AP installation location should be convenient for personnel to make maintenances. 7. AP, lightning arrester, and other related equipment should be grounded. 21 3.1 Wall type installation: 915MHz antenna The two antennas must be placed 100 cm apart GPS antenna AP Figure 19 A complete wall installation Step 01. Avoid installing on walls that is on the same side as the water tower. Step 02. Mount kit fix onto holes drilled in the wall. Tap in screw anchor to fix in location. Install AP to the mounting kit. Figure 20 Mount kit fixing on the wall surface -1 22 Figure 21 Mount kit fixing on the wall surface -2 23 Step 03. The customized metal piece in the figure is used to fix the antenna and the GPS. 1. The antenna uses a provided mount kit or customized U shape piece for fixing on the customized metal piece. Note: Use a level to make certain that the antenna is vertical. Figure 22 Measure with level 2. Put GPS antenna into a 1inch PVC pipe first, then use 1inch 2U shape screw to fix on the angle iron horizontal rod. Figure 23 Customized metal piece -1 24 Figure 24 Customized metal piece -2 Figure 25 Customized metal piece -3 25 4.6mm 105mm 67 mm Figure 26 Customized metal piece -4 210mm 24mm 9∅ 61mm 46.5mm 61mm 67 mm 16∅ 25mm 110mm Figure 27 Customized metal piece -5 26 Step 04. Lightning arresting equipment grounding can be fixed on the customized metal piece or use the mount kit to connect to the screw cap on the wall, which can achieve the best grounding effect. Diameter of the grounding cable is 5.5 mm2 Figure 28 Lightning arrester equipment grounding -1 Figure 29 Lightning arrester equipment grounding -2 27 Step 05. Antenna and RF cable connector should be wrapped with electrical tape or even grease to achieve the best waterproofing effects. Step 06. Network cable connector should use waterproof connector. Network cable to the server room should be 6/8" inch PVC soft pipe for cover. Network cable and RF cable should be fixed to avoid being swayed by wind. Figure 30 6/8" inch PVC soft pipe covering the network cable route 28 3.2 Base type installation: 100cm Figure 31 An example of a completed base station Step 01. Determine if the roof will leak because of installation (have the electrician make the evaluation) Step 02. The thickness of the cement base (should be at least 6 cm or more.) Different cement content will have different curing time. Note, must have the required thickness. Step 03. Fix galvanized pipe base. The four-point fixing is as shown in the figure. 29 Figure 32 Base of the base station-1 1000mm 2000mm Figure 33 Base of the base station-2 30 70mm 16mm 120° 500mm 2’’ Figure 34 Base of the base station-3 Step 04. Install the angle iron horizontal rod (the thickness of the angle iron should be approximately 5 mm). Use Uring to fix the angle iron horizontal rod on the top of the galvanized pipe. Step 05. For AP, use mount kit to fix on the top of galvanized pipe. Step 06. Use the attached mount kit or customized U ring to fix the antenna on the angle iron horizontal rod. Ps.use level to make certain the antenna is vertical. Step 07. Place GPS antenna in a 1 inch PVC pipe, then use 1 inch 2U shape screw to fix on angle iron horizontal rod. Step 08. Antenna and RF cable connector should be wrapped with electrical tape or even grease to achieve waterproofing effect. Step 09. Network cable connector should use waterproof connector. Network cable to the server room should be 6/8" inch PVC soft pipe for cover. Network cable and RF cable should be fixed to avoid being swayed by wind. Step 10. The diameter of the ground wire from the lightning arrester to the AP should be 5.5 mm2. 31