Preview only show first 10 pages with watermark. For full document please download

Assembly Instructions

   EMBED


Share

Transcript

a s s e m b ly instructions Phase bdiusa.com 5130 Component List A1 - Front Support x1 A2 - Front Support x1 B1 - Back Support x1 B2 - Back Support x1 C - Wood Shelf x 5 [email protected] Carefully follow this procedure to prevent any damage. Placement and Maintenance Phase shelf is designed for indoor use on level floors. Clean steel parts and wood veneer with a moist cloth. Many wood surfaces are subject to fading under direct sunlight. BDI’s unique Graphite finish has properties that make it more sensitive than others. Please avoid placing BDI’s Graphite finish in direct sunlight. Step 1 Unpack and Identify Unpack and identify the components at left. The assembly E - 4mm Hex Wrench workspace should be a non-marring surface such as carpet. For x1 missing hardware pieces, please contact BDI Customer Service at [email protected]. For all other concerns, please F - M6 x 20mm Screw contact your BDI Retailer. x 20 TWO PERSON ASSEMBLY D - Attachment Rod x 20 G - Leveler x 4 Step 2 Attach Rods to Front Supports With the holes facing up, place Front Supports (A1, A2) on soft surface in order to prevent damage. Hand tighten D Attachment Rods (D) to Front Supports (A1, A2). A2 D D A2 A1 Designed by Matthew Weatherly. These distinctive product configurations are protected by US and international patents, trade dress, and/or copyright laws. BDI is trademark of Becker Designed, Inc. All rights reserved. ©2013, BDI Made in China. 5130REV01292014v3 1 Step 3 Space Front Supports Lay two Wood Shelves (C) on each end of the Front Frames (A1, A2) so that the ends of the Frames are laying within the indented spaces of the Wood Shelves (C). Front Supports spaced properly. A2 A1 C Step 4 Install Wood Shelves Position each Wood Shelf (C) over the respective Attachment Rods (D) and carefully lower into place so that Wood Shelf rests flush against Front Supports (A1, A2). Some shelves may be easier to install than others due to the multiple attachment points. *Gentle force may be required. C TWO PERSON ASSEMBLY C D C D Shelf resting flush to metal. A1 C phase 5130 2 assembly instructions bdiusa.com [email protected] Step 5 Align Back Supports Lay the Back Supports (B1, B2), with the countersunk holes to the outside, onto the Wood Shelves (C). Countersunk side facing up. C B2 B1 C Step 6 Attach Back Supports & Turn Shelf Upright Screw Back Support (B1, B2) to assembly using the Hex Wrench (E) and Screws (F). Do not overtighten. At this time insert Levelers (G) into the bottom of all the Frames. Lift assembled Phase upright. F B2 B1 F Gx4 C phase 5130 3 assembly instructions bdiusa.com [email protected] Step 7 Align Wood Shelves with Metal Make sure all Wood Shelves (C) are aligned and flush with the Metal Supports (A1, A2, B1, B2). If anything is misaligned or unevenly spaced, tap the Shelf (C) and Supports (A1, A2, B1, B2) to its appropriate position. Once everything is flush and properly spaced completely tighten the Screws (F) with Hex Wrench (E). Correctly Aligned Incorrectly Aligned Step 8 Retighten Wood Shelves Retighten Screws (F) with Hex Wrench (E) on all Wood Shelves (C) after a few weeks of use, as Wood Shelves (C) may contract and fasteners may loosen due to varying humidity levels. Step 9 Install Tipping Restraint Kit. There is no pre-drilled hole on the rear side of the top shelf for installing the HH510 Furniture Tipping Restraint Kit (included). 5/8" Screw M To r irro Approx. 2" This tip restraint must be attached to a wall stud using the 2" screw enclosed. phase 5130 4 2" Wall Screw *Note HH-510 Furniture Tipping Restraint Kit is supplied by Walter of Wabash. For further information, visit www.walterofwabash.com 1. Determine where shelf is to be placed and mark the location of a wall stud on the back edge of the top shelf. Drill the provided 5/8” screw into the back edge of the top shelf at the stud mark, attaching through the smaller hole in the bracket. 2. Line the shelf back up to the determined wall stud and mark the location on the wall for the wall bracket hole, approximately 1” below the mounting bracket secured to the back of the shelf. Attach to the wall stud, using 2” screw provided, through the smaller hole of the bracket. 3. Place the shelf into position so both mounting brackets are vertically in line. 4. Lace the end of the restraint strap through the larger hole in each bracket. Bring both ends together and slide the flat end through the locking end and draw it through until all slack is removed. 5. Confirm the strap is securely laced and locked. Restraint Strap ll Wa To assembly instructions bdiusa.com [email protected]