Preview only show first 10 pages with watermark. For full document please download

Bridge Kit Kn-4530 - Toshiba Fyi Portal

   EMBED


Share

Transcript

II. UNPACKING AND SETUP II-6. FINISHER BRIDGE KIT KN-4530 PRECAUTIONS UNPACKING ACCESSORIES SETUP The Finisher Bridge Kit KN-4530 is required when the MJ-1031, MJ-1101 or MJ-1106 Finisher is installed in the e-STUDIO. Note that the unpacking instructions for this kit are included with those of the Finishers. MJ-1031 MJ-1031 MJ-1106 Menu © TOSHIBA TEC CORPORATION 2011 All Rights Reserved. Main Menu 1 II. UNPACKING AND SETUP II-6. FINISHER BRIDGE KIT KN-4530 OFF Sub Menu Be sure to shut down the equipment and unplug the power cable before any option is installed. The procedure for the shutdown is as follows: - Press the [ON/OFF] button until you hear a sound. - Confirm that the ON/OFF lamp is out. - Turn the power OFF with the main power switch. Be sure to install the equipment near an electric outlet so that it is easily accessible. * For Japan, remove the ground wire after the power cable is unplugged. When the option is installed, be sure to install the ground wire first and then plug in the power cable. © TOSHIBA TEC CORPORATION 2011 All Rights Reserved. 2 II. UNPACKING AND SETUP II-6. FINISHER BRIDGE KIT KN-4530 UNPACKING Sub Menu Open the packing carton. Take out the accessories. Take out the bridge unit. Remove the packing material and peel off the adhesive tape. © TOSHIBA TEC CORPORATION 2011 All Rights Reserved. 3 II. UNPACKING AND SETUP II-6. FINISHER BRIDGE KIT KN-4530 UNPACKING Sub Menu Remove the packing material and peel off the adhesive tape from the paper exit section. Gently turn the bridge unit upside down. Peel off the adhesive tape. © TOSHIBA TEC CORPORATION 2011 All Rights Reserved. 4 II. UNPACKING AND SETUP II-6. FINISHER BRIDGE KIT KN-4530 BRIDGE UNIT FIXING SCREW CORE ACCESSORIES BRIDGE UNIT FRONT COVER & SCREW Sub Menu BLIND COVER & SCREW 2 FIXING SCREWS FOR BRIDGE UNIT BRACKET © TOSHIBA TEC CORPORATION 2011 All Rights Reserved. 5 II. UNPACKING AND SETUP II-6. FINISHER BRIDGE KIT KN-4530 SETUP Sub Menu Remove the screw, and then remove the scanner damper cover. Cut out the 3 blind sections from the cover before the bridge unit is installed. © TOSHIBA TEC CORPORATION 2011 All Rights Reserved. 6 II. UNPACKING AND SETUP II-6. FINISHER BRIDGE KIT KN-4530 SETUP Sub Menu Place the bridge unit in the inner tray section, and then connect the connector. Place the bridge unit so that its positioning pin fits into the e-STUDIO, and then hook the bracket. Secure the bracket with the screw. © TOSHIBA TEC CORPORATION 2011 All Rights Reserved. 7 II. UNPACKING AND SETUP II-6. FINISHER BRIDGE KIT KN-4530 SETUP Sub Menu Open the transport cover of the bridge unit. Secure the front cover of the bridge unit to the unit with the screw. Close the transport cover. © TOSHIBA TEC CORPORATION 2011 All Rights Reserved. 8 II. UNPACKING AND SETUP II-6. FINISHER BRIDGE KIT KN-4530 SETUP Secure the blind cover with the 1 screw. *This procedure is unnecessary when MJ-1031 is installed. The unused 2 screws and core will be used when the Finisher is installed in the e-STUDIO. The unpacking and setup of the Finisher Bridge Kit KN-4530 are completed. Continue the unpacking and setup of the Finisher. © TOSHIBA TEC CORPORATION 2011 All Rights Reserved. 9 II. UNPACKING AND SETUP II-6. FINISHER BRIDGE KIT KN-4530 Sub Menu Main Menu Next Chapter Menu © TOSHIBA TEC CORPORATION 2011 All Rights Reserved. 10