Transcript
Butterfly Analysis Engine
SOURCE Environment DC1
12* LTO2 14* LTO3
Backup Server
Remote Locations CommVault Simpana 8 Win2003
IBM 3584 Physical Library
Data Protector 6 HP-UX B.11.23 (U)
HP MSL6000 Series LTO-2 MSL6000 Series LTO-2 COMPAQ MSL5026 SDLT-1 DELL PV-132T LTO-2 LTO2HP 1x8 autoloader DELL PV-132T LTO-2 HP MSL6000 LTO2 HP MSL5000 SDLT320 MSL6000 Series LTO-2 COMPAQ MSL5000 (SDLT320) DELL PV-132T * * * RETIRED * * * HP MSL6000 Series LTO-2 StndAln LTO2 HP MSL6000 Series LTO-2
12* LTO4
Disk backup
Source Hardware Architectu
236TB
re
TSM 5.5.2 AIX 5.3
ADIC i2000 (LibB) Physical Library
2TB
TS3500 IBM Physical Library
12TB
COMPAQ MSL5000 DELL PV-122T DELL PV-124T DELL PV-128T HP 1x8 autoloader HP 1x8 G2 AUTOLDR HP MSL G3 Series HP MSL6000 Series HP UHDL IBM 03584L32 IBM 3573-TL QUANTUM PX500 QUANTUM UHDL StndAln Library
Source Client Environment
CommVault Simpana 8 Win2003
Disk backup 122TB
2
3
1200
DC3
Data Volume TB
Data Protector 6 HP-UX B.11.23 (U)
CommVault Simpana 8 Win2003
14 days
DC4 30 days
90 days 180 days
1 year
3 years
7 years
Over 7 years
DC5
Backup Server
INACTIVE
TSM 5.3.3 Windows 2003 SP2
CommVault Simpana 8 Win2003
Disk backup
4*LTO2 OVERLAND REO
CommVault Simpana 8 Win2003
Green Bay WI Removed Wichita KS
50
Geneva
NA MIX MIX MIX N/R
TB
Tuesday Wednesday Thursday
Friday
Saturday
Sunday
8
MASTER SERVER MEDIA SERVER
6
VTL/DISK TBs
COST
13155
591980
7
WAN2
WAN3
371412 2575187
18
301250
0
0
716
DC3
2606392
$
10* LTO5
13.2
$
$
TOTAL SAVINGS
TOTAL MEDIA COUNT 36
8TB Atlanta
Commercial, Technical & Operational benefits of a single, unified strategic B&R Virtual Tape library provid platform ing massive performance improvements in backup TSM progressive incremental and restore and source de-duplication reducin g data volumes to be manag Improved backup and recove ed ry time and throughput Clear, efficient backup succes s reporting Data centre space saving s across environment Reduction of intersite bandwi dth with source de-duplication during the backup operation Increased efficiency of backup due to resource availability and reliability
0
1
2
3
4
IBM 3584L32 TAPE STORAGE
2
1 0
1
2
3
34
2
1
3
ESD
System x3850 M2
ESD
System x3850 M2
IBM TS7650G ProtecTIER De-duplication gateway cluster
Architectural Changes
Tivoli FastBack
Standardises on a high perform ance virtual tape platform with site consolidation Consolidated virtual tape library for de-duplication Avoids ad-hoc unplanned spend Environment scaled to 36 months usage Increased use of tiering for backup data and associated de-duplication benefits Virtual tape library providing improved direct to tape mount capability TSM disk caching for backup of more systems within the backup window
Centre
Remote Site Mid Size
Remote Site Small Size
Client SOURCE deduplication Tivoli FastBack
2*LTO3
Centre
Client Environment
Client SOURCE deduplication
10
Client Environment
9*LTO2
5000
128.1
10.2 6.0 10.2 29.8
0 249125
30
374191
6
106956
0
0
280
3587039
$
Unstructured
FileSystem data content
TARGET Hardware Infras
Buy
5,059,261
7.9
4,318,898
4000
DB2
Windows SAP SOURCE
TARGE T y Legac
1000
Physical tape drives offline due to excessive errors High volume of write failure s to physical tape media Repeated failures of SAP archive logs within HP DataPr otector Disk agent backup failures Flat file backup attempts on structured data types SAP license failures Database archive errors Mount point backup mis-con figuration Disaster recovery capability and data integrity Media state with long term data retention
37.0
3,500,000
4,071
3,000,000
3,365
2,500,000
2,781
2,500
2,000,000 2,000 1,500,000
1,678 1,255,530 1,463
1,043,703 1,268
909,7721,106
11
Butterfly Migration EngineTM
Planning
1,000,000
614
500,000
-
-
36,840 Legacy Benefit 12 months
-1000
Year1
Source Occupancy Capacity
(TB)
Year 2
Target Occupancy Capacity
Backup Capacity and Total
4,500
-
Year 3
(TB)
Source OpEx
Target OpEx
Costs Forecast (Cumulativ e)
-2000
14,000,000
Target
Management Summary
15000
SOURCE PRIMARY VAULT SLOTS
10000
TARGET PRIMARY TARGET COPY
5000
0 Year2
Operational Issues
2,567,582
3,000
1,000
Source
20000
Time
15 1.9 16.5 1.5 2.1 37.0
3,250,657 2,876,666
3,500
KVA
Forecast
4,000
HPUX 2000
Backup Capacity and OpEx
4,500
6 48 232 3 30
4,000
MONTHS
Year1
QTY
TOTAL TOTAL
Linux
Up to 36 Months
Year 0
MODEL MASTER TS7650 TS3500 LTO
Oracle
3,015,000
37%
VENDOR TIER IBM Enterprise IBM Enterprise IBM Enterprise IBM Entry IBM Entry
MS Exchange
500
$
tructure
INFRASTRUCTURE Master Server Disk VTL (TB) Library Drive
36 Month physical capacity
4,377,987
34%
d
Distributed infrastructure and management comple xities Varied drive and media genera tions Major instability in physica l tape layer Microcode and firmware manag ement on tape infrastructure Multiple product recovery and operational complexity Tape movements and manag ement in remote sites IO errors and hard write errors on tape media Duplication jobs and replicat ion failures meaning DR unreco verable Library capacity and disk capacit y for backup occupancy CommVault costs around disk storage High volume of expensive primary disk storage for backup data Multiple vendor technology in data centers Virtual tape infrastructure deploye d against standards
Unstructured
0
2,274,637
Operational Issues Resolve
Infrastructure Issues
60675
0 3
25000
Tape Volume Count
78 TB
8TB
Library manager Server
COST
Cumulative Media Count
30000
Document Name: Butterfly Analysis Engine Backup Manufacturing Sector – TSM -CV-DP to TSM Author: Butterfly Analysis Engine v1r (release 5.9) *Data Collection comple
Transformation Benefits
Management Servers
3000
1127 37
$
RESOURCE REQUIREMENTS Man Years after 36 months
Butterfly AER Details
TSM Electronic vaulting
Capacity
1.3 17 45 26.2 38.6
56.2 184.3
1348
6,652,624
4071 184
INFRASTRUCTURE SAVING S
Name Removed
Site consolidation into 3 key data centre hub locations Consolidated server and site infrastructure with the use of IBM FastBack in locations LAN based backup for unstruc tured data Unstructured content migrate d to single Virtual tape library for maximum de-duplication Consolidation & Centralisation of occupant backup data IBM TS7650G ProtecTIER Virtual tape solution Removal of manual vaultin g and media handling
De-duplication gateway cluster
1,500
OCCUPANCY (TB) POWER (KVA)
Name Removed
ted 10122010
206403
16
TOTAL Atlanta GA Corpus Christi Name Removed Green Bay WIPine Bend MN WAN1 TX
Occupancy by managed server
32 10 15 262 386 6 3 102 298
UNITS
364
0
Daily data volume by site
TOTAL
4 2
System x3850 M2 System x3850 M2
IBM TS7650G ProtecTIER
Tivoli Storage Manager 6.2.1
KVA
TARGET
UNITS
TAPE DRIVES
10
10
QTY
TOTAL TOTAL
27417
LIBRARY
** CommVault
12
Monday
ESD
IP 36 MONTHS
VAULT SLOTS
Site backup volume by day
30
MIX MIX MIDRANGEMASTER MIX LTO/SLDT Enterprise N/A
SOURCE
TAPE VOLUMES
20
MODEL
Enterprise NA MIX MIX MIDRANGEMASTER MIX LTO/SLDT Enterprise N/A
MIX MIX MIX N/R
INFRASTRUCTURE
40
3
s Case
TIER
TOTAL COST OF OWNERSH
Atlanta GA Name
IBM Tivoli Storage Manag er backup management server DISK Storage For backup server IBM ProtecTIER TS7650G Gateway LTO Ultrium-5 tape techno logy
IBM 3584L32 TAPE STORAGE
Butterfly Differential Busines
TB
TB
70
2 4
ESD
OVERLAND REO
tructure
VENDOR
Library Master Server Drive Disk
Name Removed
60
2
34
FileSystem data content
Existing INFRASTRUCTUR E VTL (TB) Library Master Server Drive Disk Growth
6
1 3
2 1 3
2
1
Library manager Server
OVERLAND NEO
SOURCE Hardware Infras
Site backup volume by day
re
0
1 0
Tivoli Storage Manager 6.2.1
3584 IBM Physical Library
Backup Server
8
* Not including CommVau lt
Target Hardware Architectu 78 TB
8TB
DC6
3*LTO3
Backup Server
9TB
0
8TB
10*LTO3
OVERLAND NEO
Capacity Metrics
80
Management Servers
4 3 1 2 3 8 2 6 3 2 8 2 1 10
5TB
7 days
TSM Electronic vaulting
10* LTO5
Disk backup
0
5
Centre
DC2
6*LTO2
3584 IBM Physical Library
ADIC i2000 (LibC) Physical Library
TSM v6.2.1 to be used as the standard management server platform TSM Consolidation and databa se performance improvements TSM Client de-duplication and incremental process to allow system and site consolidation Consolidation of backup and recovery operations to allow efficien t data management TSM to manage tiering and migration between disk, virtual and physical tape Management of consolidated environment via in built TSM management tools Client data encryption to be used for sensitive records Advanced database backup and recovery operations Improvement in database backup and recovery performance IBM Tivoli FastBack to consol idate the protection of data in remote sites
Tivoli FastBack
13*DLT/2*DAT
8*LTO2
800
400
IBM 3584L32 TAPE STORAGE System x3850 M2
De-duplication gateway cluster
Library manager Server
11*LTO4
5*LTO3
600
200
4
6* LTO2
Backup Server
1000
2 4
3
13*LTO3
3584 IBM Physical Library
Data occupancy by expiry
2 4
IBM TS7650G ProtecTIER
Tivoli Storage Manager 6.2.1
4*LTO1 9*LTO2
11* LTO3 A 1* LTO3 B
TSM 5.5.2 AIX 6.1 LIB MGR
1 3
2 1 3
2
3
15*DLT Remote Locations
TSM 5.5.2 AIX 6.1
0
1 0
1
ESD
1*LTO3 10*C7438A
Disk backup
Backup Server
TSM 5.2.7 TSM 5.2.7 AIX 5.2 Windows 2003 SP2
78 TB
8TB
28*LTO2
DC2
Client operating system platform s include Windows, HP-UX , Linux, AIX, Solaris, SCO Client environment backup UNIX volumes reported as 73% Unstruc tured data 27% Structured Structured data types are MS-Ex data change, Oracle, DB2, SAP, DOMINO, MS-SQL, ShareP Total client backup data occupa oint ncy on disk is approx 400TB Total data occupancy is 3.4 PB Restore frequency: MEDIU M Average Daily backup volume approx 60TB
8TB
Environment
IBM Tivoli Storage Manag er Extended Edition v6.2.1 IBM Tivoli Storage manag er for Databases IBM Tivoli Storage Manag er for Mail IBM Tivoli Storage Manag er for Enterprise Resource Planning IBM Tivoli Storage manag er for Storage Area Netwo rks IBM Tivoli Storage Manag er FastBack (optional)
Management Servers
44*LTO1
CommVault Simpana 8 Win2003
11*LTO3
Disk backup
`
Indicative Target Architectu re Target Software Architectu re
System x3850 M2
5*LTO2
CommVault Simpana 8 Win2003
TARGET TSM Consolidated 10* LTO5
ESD
TS3500 IBM Physical Library
6* LTO2
9DC1 Green Bay
2 2 2 2 1 2 2 2 2 4 2 4 1 2
Annual Run Rate $
Backup management platform based on X86, IBM P and HP RX platforms Backups are conducted over the TCPIP network and via MEDIA Servers Physical tape libraries are IBM 3584L32, IBM TS3500, ADIC i2000, Overland NEO Virtual tape libraries in use are Overland REO Number of physical libraries are 10 in data centre and 85 in remote locations Media in environment based on DLT, LTO1, LTO2, LTO3, LTO4, DAT, Physical tape drives in use in data centre locations 112, remote locations 150 Total physical volumes in librarie s 1574 Total physical volumes not in libraries are 15476 Total allocated disk storage 386TB used for primary backup TSM and CommVault primar y disk used for backup data Hardware compression in use Tape multiplexing in use 17050 Physical media items in use
Sector
Year3
TOTAL Capacity reduced by Long Term capacity reduce d by Tape volume saving KVA Saving Daily Backup volume is reduce d by Network load reduced by FTE Reduction by Growth rate applied
2608 TB 1064 TB 11359 147 KVA 58.20 TB 55% 37% 21.0%
Name Removed
11,711,885 4,071
12,000,00 0
3,500 3,365
3,000 2,781
2,500
10,000,000
7,455,568
8,000,000 7,563,157
2,000
1,500
6,000,000
1,678 3,573,242
1,000
500
-
4,868,523
1,106
Legacy Benefit 12 months
Year 1 (TB)
4,000,000
2,000,000
Year 2
Target Occupanc y Capacity
(TB)
Legacy Data Migration Plann
ing
2,385,716
614 1,475,944 -
Source Occupanc y Capacity
1,463
1,268
Cumulative Cost $
re
Source software environment based on DataProtector A.06.00 , Tivoli Storage Manager v5.2.5, and v5.5.2, CommVault Simpa na 8.0.0 (BUILD68) v5.3.3 Environment in production since July 2008 Fifteen backup management instances in six data centre locations (and remote locatio FULL, DIFF, INCR backup ns) methodology and policy enforce d throughout the environment 15 active backup management servers addressing a total of 2866 physical clients Replication of backup data: HIGH Active data retention policy vary from 90 days to Over 7 years Software agents available are MS-Exchange, Filesystem, VSS, DOMINO, SAP, Oracle SharePoint Server, DB2, Lotus , MS-SQL, Domino
Backup Capacity (TB)
Source Software Architectu
Report for Manufacturing
TM
Backup Capacity (TB)
1
Year 3 SourceTotal Cost
-
Target Total Cost
Butterfly Migration Engine automatic migration of long term data in the current environ Fully automated, secure migrati ment on of existing backup occupa ncy with retention over 90 days. Data migrated into Tivoli Storag e Manager control Data Volume in scope: 2650TB Migration products required: 1650TB Foundation Migrati on Engine, 1000TB Media Migrato Upgrade r for TSM
**Subject to detailed Migration
Project Analysis