Transcript
Category 7, 4-pair plug termination instructions
1
2
4-pr, 26 AWG, stranded or 4-pr, 22 AWG, Solid F/STP
3X
360˚ 50mm (±6mm) 2” (± .25”)
8-12mm (0.32”-0.47”)
1X !
!
m -14m 11.5 -0.55”) ” (0.45
3
4
5
6
7
8
9
10
!
≤ 1mm (0.04”)
11
12
≤ 7.6mm (0.3”)
1.
13
✖ > 7.6mm (0.3”)
14
2.
To assist safe installations, comply with the following: A. Use caution when installing or modifying telecommunications circuits. B. Never touch uninsulated wire terminals unless the circuit has been disconnected.
15
C. Never install this device in a wet location. D. Never install wiring during a lightning storm.
Rev. A 03/05 100.13732
✓
≤ 7.6mm (0.3”)
Category 7, 2-pair plug cable preparation and termination instructions
1
PiMF
2
Cu
3X 50-80mm
(2”-3”) 1X 8-14mm (5/16” - 9/16”)
!
!
11.5mm-14mm (1/2”)
3
4
5
6
7
8
9
10
!
0-1mm (0 - 1/16”)
0-1mm (0 -1/16”)
11
12
13
15
16
17
14
To assist safe installations, comply with the following: A. Use caution when installing or modifying telecommunications circuits. B. Never touch uninsulated wire terminals unless the circuit has been disconnected.
D. Never install wiring during a lightning storm.
Rev. A 6/00 100.10071
C. Never install this device in a wet location.
1-Pair ScTP Plug Instructions
S/FTP Qualified Cable only
38mm ±6mm (~1.5 in.)
1
2
3
4
5
6
7
8
1-Pair ScTP Plug Instructions 1X
1X
< 2mm (.08 in.)
9
10
11
12
13
14
15
16
14
15
13
To assist safe installations, comply with the following: A. Use caution when installing or modifying telecommunications circuits. B. Never touch uninsulated wire terminals unless the circuit has been disconnected. C. Never install this device in a wet location. D. Never install wiring during a lightning storm. Rev. x April 2005 100.13735
< 1mm (.04 in.)
1-Pair UTP Plug Instructions
A
A Strain Relief Boot B Crimp Ring
D
B
C Connector Housing D Termination Cap C
Required Tools: • Jacket Stripper • Diagonal Cutters • Small Flathead Screwdriver • Parallel Jaw Pliers
1
Install boot, narrow end first.
Using the CPT cable preparation tool or equivalent, strip off approximately 1-2 inches (2551mm) of cable jacket.
2
Untwist and flatten the conductors in preparation for insertion.
3
Insert crimp ring into the housing with the rounded side forward (contact side).
4
CRITICAL STEP
Lace the conductors through the housing and the crimp ring and into the termination cap. Orient the conductors in accordance with color-coded dot on cap.
5
Note: Cable jacket should be inserted through the crimp ring and up against termination cap.
While maintaining inward pressure on cable, use the diagonal cutters or equivalent to trim excess conductors flush with termination cap.
6
Maintain inward pressure on cable and use parallel jaw pliers to terminate conductors. Squeeze cap flush with connector housing.
7
Note: Cable jacket should be up against termination cap.
Using a small flathead screwdriver or equivalent, press and crimp the metal ring securely onto the cable jacket.
8
Incorrect: Jacket is not under crimp ring.
1-Pair UTP Plug Instructions
10
Slide the strain relief boot into place.
11
Inspect finished connector.
To assist safe installations, comply with the following: A. Use caution when installing or modifying telecommunications circuits. B. Never touch uninsulated wire terminals unless the circuit has been disconnected. C. Never install this device in a wet location. D. Never install wiring during a lightning storm.
57S5
Rev. C 5/02 100.10418
Swing close and latch the cover nto the connector housing.
9