Preview only show first 10 pages with watermark. For full document please download

Ceiling Mount Motorized Installation Guide

   EMBED


Share

Transcript

Motorized Ceiling mount INSTALLATION GUIDE Item No.:PETR105 TV Size Range:26 " ~ 42 " Max load capacity : 40Kg/88lbs Thank you for choosing our products Max VESA:500X400 Supply voltage: DC/12V Flip down and swivel for optimum viewing Bulit in leveler system Pyle Audio 1600 63rd st , Brooklyn, NY, 11204 (718)236-8000 www . pyleaudio . com MADE IN CHINA -12- Important: If don't understand about right install ways, please consult to normal installing specialist. Parts: 8 ID 1 2 Qty 1 1 Description Ceiling plate Extension column 3 4 5 6 1 1 2 2 2 Electromotor Unit Plate Bracket M8×50mm bolt M8 washer 1 1 1 1 1 4 4 Remote Control Power cable Remote IR sensor Velcro tab Wrench M4 ×12 mm bolt M4×16mm bolt G H 4 4 4 4 4 4 M5×16mm bolt M6×16mm bolt M8×16mm bolt M 5 ×36mm bolt M6×36mm bolt M8×36mm bolt I J K L M 4 4 4 4 4 Square washer Long bolt Wall anchor Long bolt washer Spacer 7 8 3 9 10 11 12 A B C D E F -2- -11- Step 2: mount to ceiling First, remove cover from ceiling plate. D Follow the installation instructions in below to install Ceiling plate to different kinds of ceiling -wood joist finished, exposed wood joist, wood beam and concrete. Wood Joist Finished Ceilings, Exposed Wood Joist Ceilings , or Wood Beam Ceilings: Make sure that mounting screws are anchored into the Concrete Ceilings: -4- -9- Step 3: Attach bracket to TV Check your TV manual to confirm the diameter of bolt to be used or choose an appropriate bolt according to size, height and position of the holes on your TV. See pages 5-6 of these instructions for examples. For correct installing, make sure that hook of every bracket must facing foown(.)-948.3U. s. e -8- -5- 2. Some displays have cur ved backs with recessed mounting lands(Fig.a). It will require the use of spacer. For this display, install a spacer(M) between display and the bracket. As shown in Fig 3b. -6- Fig a -7-