Preview only show first 10 pages with watermark. For full document please download

Charger Installation And Start-up Checklist

   EMBED


Share

Transcript

CHARGER INSTALLATION AND START-UP CHECKLIST Model Number: Job Name: Serial Number: Address: Start-up Date: Retrofit New Project How many units are installed at this location? City: State: Zip: Boiler(s): Water Heater(s): Inspect gas pipe, regulator and meter sizing. Is it sized correctly for the Btu/Hr requirement? Yes or No: If no, list the discrepancies: Gas Supply Is there an inlet gas lockup regulator on the supply? If Yes, is it ten feet upstream from the appliance? Measure and record values below (inches of water column): Incoming Incoming Static Dynamic Pressure: Pressure: Yes or No: Gas Line Diameter (inches): Yes or No: venting If Yes, is the masonry chimney lined as required by code? Yes or No: Combustion and Ventilation Openings: Two openings to the outside Total area of combustion and ventilation air openings (sq. in.): One Opening to the outside % Free area: Two ducts from the outside Vent draft - taken 18-24” above flue adapter (in. of water column): Two ducts from an interior space Is the vent pipe connected to a masonry chimney? Yes or No: List any corrections required for vent or air inlet piping: clearances - Measure and record (inches) the service clearances from the nearest obstruction (min. 24” required for service): Front: Rear: L Side: R Side: Top: List any corrections required for service clearances: Final Settings Tank Set Point (oF): Start-up performed by: Company: Start-up approved by: Company: Name: Name: Phone: Phone: Send completed form to: Internal Use: Email: [email protected] S/O #: Fax: (615)882-2963 Routed: Mail: Service Dept/Lochinvar 300 Maddox Simpson Pkwy. Lebanon, TN 37090 Tech: App: Denied: Save then Submit Form CHARGER-STARTUP REV A