Clarification for publication EuropeAid 137-159/DH/SUP/GE Clarification for publication EuropeAid 137-159/DH/SUP/GE Please be aware that questions containing any indications on the brand names or other information restricted by legislation are denied. 1. In total 116 (29+29+58) portable radio antennas of different frequency ranges are requested for only 36 radio sets. The same time radio set itself already contains a single antenna of customer choice. Thus we need to know what types and quantities of portable antennas should be supplied with each radio set and what types and quantities of portable antennas should be supplied in addition? Answer: Final beneficiary is authorized to decide the purpose and usage of the product and carry out its management according to the relevant Georgian legislation. Therefore tenderer must follow to the technical and quantity specifications clarified in the tender.
2. LINE CORD option for vehicular radio is not required. Thus please cancel this option requirement; Answer: Tenderer must follow the technical and quantity specifications clarified in the tender.
3. Repeater NAI license for voice and data service are requested 11 per each service. The same time we should quote only 7 repeaters. 4 sets of stationary radios do not require such licenses. Thus either that is just a mistake and quantities should be corrected from 11 to 7 or there are extra 4 repeaters available and that is why we still need to quote 11 voice and 11 data NIA licenses keys. Please check and advise what is the correct solution for the case? Answer: Tenderer must follow to the technical and quantity specifications clarified in the tender. Final beneficiary is authorized to decide the purpose and usage of the product and carry out its management according to the relevant Georgian legislation. 4. In connection with the information mentioned in p.12 Taxes and other charges, "Instructions to tenderers" is it possible to provide the offer on DAP conditions? Answer: According to theFramework Agreement between the Government of Georgia and the Commission of the European Communities” signed by the Commission of the European Communities and the Government of Georgia on 18 June, 2007 and ratified by the Georgian Parliament on 29 November 2007 by Resolution No 5506: Imports including equipment made under contracts financed by the Community shall not be subject to value added tax or customs duties. Delegation of the European Union to Georgia will issue all necessary actions for smooth customs formalities. 5. Is there need to submit installation and commissioning works? or the project involves only physical delivery? Answer: According to the tender dossier installation and commissioning works is requested just for lot #6 and #7 6. Document "Technical Specifications (Annex II) Technical Offer (Annex III).doc", LOT 5: 1
Clarification for publication EuropeAid 137-159/DH/SUP/GE CPU: The CPU requirement is stated as "Xeon E5645, Six Core 2.4 GHz Processors". Do we correctly understand that each server must have ONE Xeon E5645 CPU? Answer: According to the tender dossier 6 core processor is requested; (Please, take into consideration technology of CPU, and calculate number of processor (CPU) for each server by tender requirements). 7. Document "Technical Specifications (Annex II) Technical Offer (Annex III).doc", LOT 5: CPU: Is it acceptable if we offer you servers with the newest Intel Xeon E5-2600 v3 series CPUs with equal or higher performance as per SPECInt Rate benchmark (https://www.spec.org/cpu2006/results/rint2006.html)?
Answer: Please follow the tender requirements 8. RAM: It is stated that at least 8GB of RAM is required. What is preferred amount? Answer: If two or several companies offer the same, the lowest price, the preference will be made based on the amount of RAM and other technical specifications.
9.
Is there any maximum RAM support requirement for servers (for future expansion)?
Answer: Maximum RAM support is not limited 10.
It is stated that at least 8x 1TB disks are required. What is preferred amount?
Answer: Maximum hard drive is not limited 11. Is there any requirement of maximum amount of disks that server can support (for future expansion)? Answer: Please follow the tender requirements 12. MISC: Should we provide OS licenses for servers in proposal? Answer: Please follow the tender requirements 13. If yes, could you please tell us which OS are you going to use on each server? Answer: Please follow the tender requirements 14. Do we correctly understand that 14-i. you need 12x servers of equal configuration and ONE rack-mount KVM console Answer: Requested is 12 sets of server and monitor with all needed cabling and mounting kit, Regarding the KVM console – please follow the tender requirements,
2
Clarification for publication EuropeAid 137-159/DH/SUP/GE 14-ii.
servers will be installed at same location (in one server room)
Answer: According to the tender requirements, final beneficiary is authorized to install as well as decide future usage of delivered goods. 14-iii.
all servers will be connected to one KVM console
Answer: According to the tender requirements, final beneficiary is authorized to install as well as decide future usage of delivered goods.
15. If this is correct, then you will need KVM switch. Should we also include it in proposal? Answer: see above.
16. we would appreciate it if we could receive more information on the following products from LOT 7 Cartridge for handheld label maker x 100 units Metal Grinding Wheel x 50 units Hot glue sticks x 50 units Corrugated silicon flexible cable channel x 550 m Anchor x 50 units Anchor x 50 units Rope x 4 units Silicone x 20 units Polyurethane foam (big) x 10 units Glue with two components (epoxy) x 10 units Metal glue "dry welding" x 10 units Fiting x 50 units Fiting x 50 units Metal clamp x 50 units Metal clamp x 150 units Metal clamp maker roll 25 heads x 4 units Plumber x 300 units Polyethylene clamp x 1000 units Polyethylene clamp x 2000 units Insulating tape x 100 units Dual sided scotch tape x 100 units Tin, rosin for solding x 2 units
appropriatie with Griner 30-32mm 5mm 10mm 1 unit=100m. durability 300kg. Antibacterial metal, polyethylene 32mm 21mm 100mm 200mm 25m Diameter 32mm 16-20cm 30-36cm
250gr
Answer: Annex II (page: 44-46) contains information regarding all details, including number and size of products. The requested products comply with the accepted standards of the products available on the market. 17. Below questions regarding the Electric Tools from Lot 7. Auger bit of electric drill to drill beton x 2 set
10mm to 22mm
[Please advise length of drills required]
Answer: there is only one standard size of drill
3
Clarification for publication EuropeAid 137-159/DH/SUP/GE Alligator pliers and clippers x 2 units Fiting x 50 units Fiting x 50 units Metal clamp x 50 units Metal clamp x 150 units Metal clamp maker roll 25 heads x 4 units Plumber x 300 units Polyethylene clamp x 1000 units Polyethylene clamp x 2000 units
4 peace set 32mm 21mm 100mm 200mm 25m Diameter 32mm 16-20cm 30-36cm
[Please provide with more details] [Please provide with more details] [Please provide with more details] [Please provide with more details] [Please provide with more details] [Please provide with more details] [Please provide with more details] [Please provide with more details] [Please provide with more details]
Answer: Please follow the tender requirements – Annex II (page: 44-46). The requested products comply with the accepted standards of the products available on the market. 18. We have following questions regarding LOT 7 – Outdoor Racks. What kind of ventilation is required ? most cabinets have standard ventilation slits underneath the roof edges. To determine the correct ventilation it is also important to know what in the cabinets will be installed and in which outside temperatures the cabinets will be placed. Please advise.
Answer: Only one kind of ventilation is required: “Ventilated side panels for increased airflow - 2 (two) units; diameter up to 150mm for each”. The information is indicated in the technical requirements, annex II (page: 47-48) All technical details regarding the outdoor Racks you can find in the annex II (page 47-48). 19. Will stainless steel cabinets with powder coating also be acceptable?
Answer: Yes, it could be 20. What is the desired RAL color?
Answer: White (pages 47-48) 21. The cabinets should be supplied with a base; should this base be supplied loose or mounted in the cabinet. Furthermore, regarding the Special Clothes: Could you please provide us with more specifications the required uniforms, shoes, raincoat etc. For example what kind of material is required, the height of shoes, the length of the rain coat etc. Answer: We do not have specific requirements regarding the shoes, uniforms and raincoat. All choices will be discussed and decision will be made based on the prices.
22. Thermal Sensor Horizontal angle of view 25° - Is it possible to offer another camera with estimated size of the lens? For example: 24° or 18° or 32° will be ok? Or it have to be more than 25? Answer: Based on existing terrain and vegetation, 25° and 45° angle of view are required. Exact points of installations selected by the final beneficiary is based on detailed study of terrain. Detailed information could be found in Annex II (pages: 4-6) 23. Integrated Microphone- Voice recording, 2 way voice communication and alarm triggers on noise. If it would not be integrated and we will install it separate, which will do same functions Voice recording, 2 way voice communication and alarm triggers on noise, possible to offer such solution? What is purpose? This
4
Clarification for publication EuropeAid 137-159/DH/SUP/GE perimeter security system, will work continuously by birdsong. In practice it senselessly. Such functions included MOBOTIX cameras. This cameras for home and office uses. Answer: Final beneficiary is authorized to provide installation as well as to decide the purpose of integrated microphone functionality and operational usage of the voice-recording. Separate installation of different components of the requested product is not acceptable. Detailed information could be found in Annex II (pages: 4-6)
24. Integrated Sensors. Passive Infrared Motion detector, detection distance 10m. If it would not be integrated and we will install it separate, which will do same functions possible to offer such solution ? Built-in video analytics is running across whole field of view of thermal imager. Additional protection IR detector can be connected to the alarm input of the thermal imager. Answer: Final beneficiary is authorized to provide installation as well as to decide the purpose of operational usage of the product. Separate installation of different components of the requested product is not acceptable. Detailed information could be found in Annex II (pages: 4-6)
25. Micro USB port Yes (for local storage on Flash USB stick or External HDD). Is it strict requirement? In practice this is useless function, is their possibility to offer without this function? Such functions used for home systems, for high security objects this is useless function. Why on the camera has open the external connector? That gives access to the camera unintended persons. Answer: Final beneficiary is authorized to decide the purpose of operational usage of the product. Offered suggestions and opinions do not match the technical and technological requirements of the project.
26. Daylight and thermal visual cameras must be combined within one protective (outdoor) package (jacket/housing) .Is there possibility, to offer thermal camera and daylight camera with separate houses? we think it would be better solution because, in one house this design solution is not optimal. thermal camera and cctv camera have different requirements for the operating temperature. Heating matrix of thermal camera from the heater of cctv camera and its electronics is harmful. temperature increase of thermal matrix have a negative impact on the thermal image contrast. Heat cctv camera by the thermal camera degrades the image quality of the thermal imager. Answer: Final beneficiary is authorized to decide the purpose of operational usage of the product. Offered suggestions and opinions do not match the technical and technological requirements of the project. 27. At the same time connecting to the Ethernet of both cameras shall be made on one communication point (port). Is there possibility, that thermal camera and dailaight camera had separate ports? This requirement has not practical sense, because in any case, the cable will be connected to the network switch. number of ports which is still at least 4. any problems with the cable will cause disconnection of two systems-cctv camera and thermal camera. Answer: Final beneficiary is authorized to provide installations without any additional unnecessary equipment, because they are not included in the tender. Offered suggestions and opinions do not match the technical and technological requirements of the project.