ME-AGS-WB* / ME-AGS-N wiring diagram – For EPS (EPS2277 Diesel Generators)
These 5 adjustments are not active when a ME-RC Remote Control with revision 1.5 or higher is used. They are set using displays under the AGS button on the remote control.
Input DC voltage jumper (set to battery bank voltage)
1 2 3 4
inside
12/24/48V
* ME-AGS-WB with revision 4.1
ON
inside
Dip-switch configuration (Portable Mode*)
86
87A
PUR
Remote Start Connector
5-amp fuse
5-amp fuse
Gen Run Signal (input to pin 2 must be 10 to 40 DC volts only while generator is running); can be the generator hour-meter or a 12vdc pilot/run light
87
Inside Generator
YEL
30
RED
85
ORG
START Relay*
Ground
AC 17
0123
Monitored Battery (12/24V)
30
Gen Hour Meter
50
Key Switch
30 AC 17 50
Gen Battery
Relay 2 (pins 6 & 7)
RUN TIME HOURS PREHEAT
Relay 3 (pins 1 & 8)
Delay Time PREHEAT Time START Time
OFF
ON
Delay
Relay 1 (pins 5 & 6)
Delay
*Relay used is a SPDT 30 Amp, VDC coil relays, shown in the non-energized (N.C.) position.
OFF ON PREHEAT START
2 seconds 10 seconds 5 seconds
START
Time between start attempts Total Start attempts
2 minutes 4
Relay timing for Portable Mode* * to enable Portable Mode, the ME-AGS-WB must be revision 4.1 or higher Magnum Energy, Inc. provides this diagram to assist in the installation of the Auto-Generator Start controller. Since the use of this diagram and the conditions or methods of installation, operation and use are beyond the control of Magnum Energy, Inc., we do not assume responsibility and expressly disclaim liability for loss, damage or expense arising out of the installation, operation and use of this unit.
7-14-2009