Transcript
Free-Standing Bathtub
Installation Instructions
Contents: Product drawing ....................................1
Jacuzzi installation instructions................2 Cleaning and maintenance tips...............3 Caution...................................................4
1.Product Drawing
Water fall faucet
The place for drainer Hand shower Air switch Air conditioning switch
2.Jacuzzi installation instructions (1)The need to prepare material 1. Source: Stainless steel tube each a root, from the ground level 300 mm, the wall with globe valve
2. Power: AC120V/frequency 60Hz, single phase three wire, BV = 3, from the ground level 400 mm, with 10 A waterproof socket
3. From ground level in 130 mm or so, the product with the power control switch.
4. Drainage: buccal should be a drain on here as the center, the radius of the 200 mm range (don't in the center), and hose connection
(2) The installation process This product components adopt standard part, when installation, please refer to the product technical parameters, according to the following steps to installation:
1. Determine product installation position: please refer to the water and electricity parameter table and hydropower installation figure decorate water pipe, power outlets, pipes, etc. And to ensure enough position connection. Then will bath crock as for installation place, adjust the bottom to keep balance nut cylinder level. In order to the next step of convenient installation, the first move out of a bath crock, to install complete to move back to install a.
2. Connections sewer: drain in bath crock bottom, is 1 throat section plastic pipe, can be arbitrary Angle bending, connection will be fixed in the sewers please end, then use adhesive tape or glass seal. Note can't discount, so as not to affect the drainage
3. Connect feed line: feed line for heat resistant to high temperature high pressure pipe net silk, please click joints connected cold 'hot water mark joint, do not take the, in order to maintain convenient, the proposal within the cold and hot water to install a valve
4. Connect the power: this product is suitable for 120 v ac power, please according to the installation drawing with electricity and water leakage switch and socket position, note waterproof. Insert the plug into the power supply socket, press the reset button leakage protection plugs, the indicator light can. Pay attention to ensure good bath crock grounding.
5. Check the cleaning: the above steps after completion, check the pipe joints is sealed, make sure clear after the cylinder is sundry, open the drainage device, water to clean bath crock (be sure to clean in order to avoid damage the pump).
6. Adding water test: confirmation without sundries in cylinder closed after drainage, then water storage, electric test.
3. Cleaning and maintenance tips
1.The cleanness of massage (1)Daily cleaning massage
bath.
bath use
ent containing contain ketone
or
liquid detergent and soft cloth. Not clean with deterg chlorine water
composition; During disinfection,
disable use
disinfectant containing formic acid and formaldehyde. (2)Suggest use
granular detergent can be mixed with water
avoid to use
for
(3)Do not leave do not use
the containers of
(4)Please do not let the
liquid detergent on bathtub surface
thickening agent or
acetone, p
or other solvent get to Acrylic surface.
2.The maintenance
of the
massage
into the
pay attention to clean circulatory
bath surface
system.
bath
the bath surface has scratches, burnish with 2000 waterproofabrasive paper, apply wit
toothpaste ,
with a soft cloth polishingcan make it bright and clean
(2)The surface of
the bath
with Scale
s lemon juice, vinegar with
40 degrees celsius hot water, for about 5 minutes, stop
can use
soft cloth to wipe
(3)Cleaning the Hydraulic friction
device
such a
after slight fever.
when the
bath filled with
per liter add 2 grams cleaner, the pump drainage,
(4)Use wet towel to wipe Cylinder
like new again.
detergent containing light acidic ,
the hydraulic massage for 3 minutes, stop the
e
a long time,
nail polish, nail polish remover, dry liquid detergent,
after each use, don't let the cleaner
h
for
other similar cleaning supplies.
(5)Corrosive cleaner will damage Acrylic’s surface,
(1)if
massage bath ,
ceramic tile or enamel surface cleanser.
the spray or
aint remover
to clean the
start the
hydraulic massage
and then fill it with
cold water, start
pump drainage and clean bath.
block surface dirt, this process can
be repeated
thre
times, make it bright and clean like new.
(5)Do not use rough surface cleaning equipment, cal
solvent or
particles clean
don’t use detergents containing chemi
bath surface.
(6)Do not use hard objects,
blade struck
ette
70 degree centigrade
or Pyrogen higher than
(7)After
using, should be
no water
score
bathtub surface,
and power off.
also should not let cigar
get in the bath surface.
(8)Backwater and the nozzle blocked by hair or (9)Gold Plating, chrome plating,
do not need
other
sundry ,
to wipe
often.
unscrewed
and clean.
4.Caution 1.No matter whether to use massage equipment, in order to ensure the normal operation of equipment the wat er inlet of the massage bath should no cover or blockage.
2.Because the massage bath massage can lead to accelerated blood flow to the human body, people has the hea rt cerebrovascular disease such as heart disease and blood clots should be careful to use, and the water tempera ture can not too high, the man with leg varicose veins should ask doctor's advice and opinion.
3.Best bath time is after 9 o 'clock in the evening, before going to bed so can let a person's mental and physical v ery flabby, it much better massage time not exceed 30 minutes each time, the water temperature does not exce ed 38 ° C, don't start up after bath, to avoid dizziness accidents.