Preview only show first 10 pages with watermark. For full document please download

Ftof – Cable Runs

   EMBED


Share

Transcript

FTOF  –  CABLE  RUNS   Joe  Guerra   Terms/Defini=on   FTOF  –  Forward  Time  of  Flight     PCAL  –  Pre-­‐shower  Calorimeter   PMT  –  Photo  Mul=plier  tube   Panel  1A  –  Exis=ng  panel  to  be  carried  over  from   CLAS6.         •  Panel  1B  –  New  Panel  comprised  of  62  scin=llators  and   124  PMT’s.  Sits  +Z,  directly  in  front  of  panel  1A.   •  Panel  2  –  New  panel  consis=ng  of  reused  scin=llators   and  PMT’s  from  the  current  panel  2  in  CLAS6.    Is   comprised  of  5  scin=llators  and  10  PMT’s.     •  •  •  •  Purpose   •  This  is  to  serve  as  a  design  document  on  the   FTOF  cable  rou=ng.   •  In  this  document,  thought  process,  idea’s,  and   cri=cism’s  can  be  detailed  on  the  rou=ng  of   the  FTOF  cabling.   Design  Considera=ons   •  How  to  bundle  and  strain-­‐relief  the  signal  and  HV   cables  along  the  sector  frames  for  panel  -­‐1a  and   panel-­‐1b?   •  Will  all  cables  be  the  same  length?   •  How  to  strain  relief  the  panel-­‐1A  cables  and  the  PMT   so  that  they  do  not  put  torques  on  the  dividers?   •  How  to  strain-­‐relief  the  panel-­‐1b  cables  at  the  PMT  so   that  the  connectors  on  the  pig-­‐tails  are  not  stressed?   •  How  to  strain-­‐relief  the  cables  at  HV  patch  panels  so   that  we  have  access  for  disconnects  and  so  there  are   no  stresses  on  the  cables  or  connectors?   Design  Considera=ons   •  Will  the  cable  runs  go  behind  the  frame  beams  or   on  the  sides  of  the  frames?   •  Do  we  need  to  add  addi=onal  places  for  strain-­‐ relief  on  either  the  panel-­‐1a  or  panel-­‐1b  frames?   How  do  we  keep  the  cable  bundles  in  posi=on?   •  We  will  need  to  make  sure  that  we  can  get  to  the   disconnect  points  of  the  panel-­‐1b  pigtails  for   servicing.   •  We  need  to  be  able  to  read  the  cable  labels  at  the   PMT  end  and  the  patch  panel  end.   Design  Criteria   •  There  are  62  PMT’s  per  each  side  of  panel  1B.   •  There  are  23  PMT’s  per  each  side  of  Panel  1A.   •  There  are  two  signal  and  one  HV  cables  per   PMT.   •  HV  Cables  –  6mm  diameter  each   •  Signal  Cables  –  5mm  diameter  each   POINT  OF  VIEW   AVAILABLE  AREA’S   Area’s  Available   •  Between  LTCC  and  Panel  1B   – 4.480in²*   •  Between  Panel  1B  and  1A   – 6.448in²   •  Between  Adjoining  Panel  1B’s   – 4.308in²   •  Between  Panel  1A  and  PCAL   – 13.785in²   *NOTE:  LTCC  measurement  not  confirmed.   SPACE  REQUIRED:   •  PANEL  1A  –     Signal:  23  PMT’s  *  2cables/PMT’s  *  5mm  *  5mm  =  1150mm²  =  1.783in²***   HV:  23  PMT’s  *  1cable/PMT  *6mm*6mm  =  828mm²  =  1.283  in²***   •  PANEL  1B  –         Signal:  62  PMT’s  *  2cables/PMT’s  *  5mm  *  5mm  =  3100mm²  =  4.805in²***   HV:  62  PMT’s  *1cable/PMT’s  *6mm  *6mm  =  2232mm²  =  3.460in²***   Panel  1B  –  HV  Cables   Available:4.480in²   Used:  3.460in²   NOT   USED   Panel  1B  –  Signal  Cables   Available:6.448in²   Used:  4.805in²   Panel  1A  –  Cables   Available:13.785in²   Used:3.066in²   AVAILABLE  AREA’S   1B  Running  Scheme   •  Run  HV  and  Signal  Wires  Together   •  Fill  Boiom  Brackets,  then  switch  to  upper   brackets   TO  APEX   Cable  Aiachments/Relief   Panel  1B-­‐  Top  Bracket   *NOTE-­‐  Design  subject  to  change   Cable  Aiachments/Relief   Panel  1B-­‐  Top  (HV  CABLES)   Fabricated  Bracket   McMaster  Carr  PN:  7572K13   **NOTE:  Brackets  may  be  installed  opposite  of  each  other  on  opposite  side  of   panel.  This  will  be  done  for  adjoining  sector  clearance.   Cable  Aiachments/Relief   Panel  1B  –  Boiom  Bracket   *NOTE-­‐  Design  subject  to  change   Cable  Aiachments/Relief   Panel  1B  –  Boiom  (SIGNAL  CABLES)   NOTE:  DYNODE  TRANSFORMER  TO  BE  INSTALLED  ON  ELECTRONICS  RACK   Cable  Rou=ng   -­‐Panel  1A  -­‐   •  Follows  current  rou=ng  plan   HV  and  Signal  Patch  Panels   FOR  STRAIN  RELIEF   Cable  Runs   Cable  Runs  (Sector2)  (Cont)   Cable  Runs  (Cont)   Panel  2  Cables   Cable  Runs  (Cont)   Patch  Panel  Access   PCAL  Clearance    (Top  View  of  Sector  4)   Aug.  9,  2012   FTOF  Panel-­‐1a/2  HV  Cable  Connec=ons   Cable  RG-­‐59   PMT    SHV  F   HV  Patch   SHV  M   SHV  M                                                                                                                      SHV  F   FTOF  Panel-­‐1a/2  Signal  Cable  Connec=ons   Cable  RG-­‐58   frame-­‐mounted   PMT    BNC  M   Anode  &   BNC  F                                BNC  M   Dynode   Cable  RG-­‐58   patch  cable   BNC  F                                    BNC  F   bulkhead  type                                    bulkhead  type   Cable  RG-­‐174   electronics   BNC  M                                    Lemo  M   Aug.  9,  2012   FTOF  Panel-­‐1b  HV  Cable  Connec=ons   Cable  RG-­‐59   PMT    SHV  F   HV  Patch   SHV  M   SHV  M                                                                                                                      SHV  F   FTOF  Panel-­‐1b  Signal  Cable  Connec=ons   Cable  RG-­‐58   Cable  RG-­‐58   PMT    BNC  M   BNC  F                              BNC  M   Anode   Cable  RG-­‐58   frame-­‐mounted   PMT    BNC  M   BNC  F                      BNC  M   Dynode   Cable  RG-­‐174   patch  cable   frame-­‐mounted   electronics   BNC  F                                    BNC  F   bulkhead  type                                          bulkhead  type   Cable  RG-­‐58   patch  cable   BNC  F                      BNC  M   bulkhead  type                                                             460  IT   BNC  M                          Lemo  M   Cable  RG-­‐174   electronics   BNC  M                  Lemo  M   BNC  F                            BNC  F   bulkhead  type                                                             Answering  Ques=ons:   •  Q:  How  to  bundle  and  strain-­‐relief  the  signal  and  HV   cables  along  the  sector  frames  for  panel  -­‐1a  and   panel-­‐1b?   •  A:By  using  brackets,  they  cables  will  be  routed  either   above  and  or  below  the  prospec=ve  panel.       •  Q:Will  all  cables  be  the  same  length?   •  A:  No.  This  would  leave  large  lengths  of  cables  of   cables  that  would  need  to  be  handled/stored.       Answering  Ques=ons:  (cont.)   •  Q:How  to  strain  relief  the  panel-­‐1A  cables  and  the   PMT  so  that  they  do  not  put  torques  on  the  dividers?   •  A:  By  running  the  cables  in  the  same  fashion  that   they  are  currently.    Also,  by  securing  them  via  zip  =es   to  the  panel  1A  scin=llator  brackets.   •  Q:  How  to  strain-­‐relief  the  panel-­‐1b  cables  at  the   PMT  so  that  the  connectors  on  the  pig-­‐tails  are  not   stressed?   •  A:  By  using  wire  reliefs  secured  to  the  panel  1B   backing  structures.   Answering  Ques=ons:  (cont.)   •  Q:How  to  strain-­‐relief  the  cables  at  HV  patch   panels  so  that  we  have  access  for  disconnects   and  so  there  are  no  stresses  on  the  cables  or   connectors?   •  A:  Aiach  the  cables  to  the  perforated  tube  steel   that  aiaches  to  the  Panel  2  Support  frame   •  Q:  Will  the  cable  runs  go  behind  the  frame  beams   or  on  the  sides  of  the  frames?   •  A:  Behind  and  in  front  of.       Answering  Ques=ons:  (cont.)   •  Q:  Do  we  need  to  add  addi=onal  places  for  strain-­‐relief  on   either  the  panel-­‐1a  or  panel-­‐1b  frames?  How  do  we  keep   the  cable  bundles  in  posi=on?   •  A:  Yes,  we  will  add  the  holes  onto  1B  that  are  required  for   the  boiom  strain  relief.  We  will  use  simple  drilled  holes   and  self  tapping  screws  for  aiachment.    The  bundles  will   be  held  in  posi=on  by  fric=on  due  to  the  pressure  from   securing.   •  Q:  We  will  need  to  make  sure  that  we  can  get  to  the   disconnect  points  of  the  panel-­‐1b  pigtails  for  servicing.   •  A:  The  pig  tails  will  remain  in  front  of  the  panel.  Aqer  they   are  strain  relieved  and  secured  to  the  cable,  they  will  then   travel  on  the  underside   Answering  Ques=ons:  (cont.)   •  Q:  We  need  to  be  able  to  read  the  cable  labels   at  the  PMT  end  and  the  patch  panel  end.   •  A:  This  will  be  done  prior  to  installa=on  via  a   s=cker  marking  system.