VALH 360° Dual Mount PIR installation and operating instructions
WALK TESTING 1
2
!
3
warm up 20-50 SEC
Only suitably qualified personnel should install this equipment •To prevent electrocution, do not work on any appliance live. Turn off mains before commencing work, lock-out tag-out must be followed. •The current editions of the IEE Wiring Regulations (BS7671) and Buildings Regulations must be followed for installation. •Ensure all terminal screws are fully tightened and product is securely fixed to its mounting box prior to turning on the mains supply.
PACK CONTENTS
Around 10 second MIN. SUN.
x1
MANUAL OVERRIDE OPERATION Activate Manual Override Operation
5 SEC
5
DAWN
OFF
4mm
Hrs
SEC
Lamp turn on when reach Lux setting level.
ON
ON
OFF
ON
Auto Mode
dusk to dawn
ON
x1
x1
x1
x1
x1
Lamp turn off when dusk to dawn.
1
2
3 230V
0FF
4
Max 120W
Max 500W
Max 110W
OR
TECHNICAL SPECIFICATIONS
Time On Adjustment: Dusk Level Adjustment: Operating temperature: Environment Protection:
50.8mm or 60mm
6
CAUTION:
50.8mm
Max 75W
Max 400W
5
φ 5mm
Max 1440W
60mm
7
Detection Angle: Power Supply: Maximum Switchable Load:
x1
Surface Mount
SWITCHABLE LOAD
Up to 6 metres diameter (3m Radius) at mounting height of 2.5m 360° 220 ~ 240 VAC / 50 Hz Max load current 6A Incandescent / Halogen Max 1440W Flourescent lamp (magnetic) Max 500W Flourescent lamp (electronic ballast) Max 400W Low energy (CFL) Max 120W LED lamp Max 110W Fan Max 75W 5 seconds - 15 minutes Day & night or night only operation 0 to 40°C For ceiling mount - IP44 For flush mount - IP44 (at sensor portion only) - IP20 (ceiling board onwards)
x2
Hole saw size: Ф75mm - 80mm
Auto Mode
Detection Range:
x2
MOUNTING/ INSTALLATION STEPS
OR
2 Auto deactivation when
x4
x2
x2
3mm
Ф5mm
1 time within 1 second 2 times within 2 seconds
x1
No 2 Phillips
1 SEC
DUSK
x1
M3 x 15mm (For cable clamps installation)
REQUIRED (Warning: Use only VDE Certified Tools)
Deactivate Manual Override Operation 1 Manual deactivation before dawn
2 SEC
ON
x1
M3 x 20mm (For ceiling mout installation)
M4 x 14mm (For Euro conduit box installation)
Cable entry capability at terminal block 1 x 2.5mm² 2 x 1.0mm² 2 x 1.5mm²
8
N
L
R R
Option1 (live out)
Option2 (volt-free)
L N
Brown Live Blue Neutral Earth Green / Yellow Brown R Switched Live Load N L R
GUARANTEE
L N R R
Brown Live Blue Neutral Earth Green / Yellow Volt-Free Brown Relay contact N L R
R
R µ
µ
The company undertake to replace or repair, at its discretion should it become defective within a period of 1 year after delivery, solely as a result of faulty materials and/or workmanship. Understandably, if the product has not been installed, maintained or used appropriately, or if an attempt has been made to rectify, dismantle or alter the product in any way, the guarantee will be invalidated.This guarantee states the company's entire liability. It does not extend to cover consequential loss or damage or installation cost arising from the defective product.This guarantee does not restrict or infringe the normal statuary rights of the customer.
* Remark: R terminals are Volt-Free output (when link is removed)
N L
N L
Note: Remove the external link
R R
COMPLIANCE WITH E.U. DIRECTIVES
Apart from meeting the appropriate British standards, products are manufactured in accordance with BS EN ISO 9002 and comply with the LV (72/23/EEC) Directive.
At the end of their useful life the packaging and product should be disposed of via a suitable recycling centre. Do not dispose of with normal household waste. Do not burn.
9
FURTHER INFORMATION CONTACT TECHNICAL SUPPORT Telephone: 0161 331 5700 E-mail:
[email protected] http://www.whitecroftlighting.com
‘CLICK’
OR
‘CLICK’
‘CLICK’
Cut out here
The device needs 20-50 seconds to warm up.
MOTION SENSOR DETECTION
MOUNTING/ INSTALLATION STEPS Flush Mount 2
When mounting at 2.5m height
3
3 METRE
1
230V
0FF
5
N
L
R R
Option1 (live out)
Option2 (volt-free) Brown Live Blue Neutral Earth Green / Yellow Volt-Free Brown Relay contact
R R
Load N L R
N L R
R
RE
Power wire
L N
ET
Ceiling board thickness 5mm-20mm
M
Brown Live Blue Neutral Earth Green / Yellow Brown R Switched Live
.6
L N
ia
Opening hole 75mm~80mm diameter
D
R
TOP VIEW
µ
µ
Cable entry capability at terminal block 1 x 2.5mm² 2 x 1.0mm² 2 x 1.5mm²
* Remark: R terminals are Volt-Free output (when link is removed)
N L
N L
Note: Remove the external link
6
7
°C
°C
40 30 20 10
40
R R
PERSPECTIVE VIEW
8
40 30 20 10
40
2.5 M
4
3 METRE
3 METRE
3 METRE
°C 40 30 20 10
‘CLICK’
3 METRE
3 METRE
1M
40
SIDE VIEW 9
LENS MASK
Ceiling board
The device need 20-50 seconds to warm up.
Restrict short detection
REMOVING
Restrict detection directly under sensor
Surface Mount
Lens mask sticker
Restrict long detection
TESTING & OPERATION Adjustment -Can be adjusted by flat head screwdriver.
REMOVING LUX
Flush Mount
ON-TIME
‘CLICK’
15 MIN