Preview only show first 10 pages with watermark. For full document please download

Horizontal Laminar Flow Cabinets Bbs13hgs Manual

   EMBED


Share

Transcript

Horizontal Laminar Flow Cabinets BBS13HGS Manual PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION 3, Hagavish st. Israel 58817 Tel: 972 3 5595252, Fax: 972 3 5594529 MRC.VER.01-1.14 [email protected] MRC LTD TEL:972-3-5595252 FAX:972-3-5594529 CONTENT 1.Introduction...………………………………………………………2 2.Functions and Use...………………………………………………..2 3.Features……..…...………………………………………………….2 4.Main technique parameter. .……………………………………3 5.Installation.…………….……………………………………………4 6.Operation .…………………………..………………………………5 7.Equipment maintenance. …………….…………………………….6 8.Check Malfunction………………………………………………9 9.Attention………………………………………………………….. …9 10.Storage and conveyance…………………….……………………..10 11. Packing………………………………………..……………………10 12.Circuit Chart…………………………………..……………………11 1 MRC LTD TEL:972-3-5595252 FAX:972-3-5594529 1.Introduction With the development of science research and industrial production, the technology of air cleanlness has widely applied to many industries, such as electron ,chemical industry, metallurgy, medicine, food, precise instrument ,and meter. Meanwhile, it also becomes one of the important measures to increase the quality of products. 2.Functions and Use: Clean Bench is equipment that makes a partial clean air environment. There are two types of air current: horizontal and vertical. It has applied to semiconductor industry, optics apparatus, chemical industry, metallurgy and some other industries. It is useful to increase the quality, precision, stability and reliability of products. 3.Features: 1). Use of the technology of cold rolling steel duster to increase the intensity of frame; the amplitude will reduce while operating. 2). The whole appearance pretty , generous and corrosion –resistant. 3). Use of the technology of high efficient and low resistant to make the function more stable. 4). The main engine of the equipment adopts the elasticity connection, small vibration and low noise. 2 MRC LTD TEL:972-3-5595252 FAX:972-3-5594529 5). Use of new type UV lights without ozone ultraviolet ray,high intensity, long life . 6). Use of ECVT adjust voltage and velocity to make use of more convenient, 7). Use of the special air-blower, low noise, low power and it can be used for a long time without maintenance. 8). With Spring glass door, more flexible and convenient in orientation. 9). The general design and reasonable construction distribution make the usage and maintenance more convenient. 4.Main technique parameter: Overall Dim (mm):1300*8250*2000 mm (Length*Width*Height) Working zone (mm):1200*500*570 mm (Length*Width*Height) Dust(for ≥0.5um): ≤3.5 Granule/L Clean rate(for ≥0.5um): >99.95% Air Velocity: 0.3-0.5m/s Noise: <60 dB (A) Vibration: XYZ direct <5um Light: 28Wⅹ1 UV Lamp: 30Wⅹ1 Power supply: 220V 50HZ Consumption: 400W 3 MRC LTD TEL:972-3-5595252 FAX:972-3-5594529 5. Installation 1).Because the condition of installation directly influences usage result and life span, the device must be installed in the cleaning room or the cleanness room that has the plastics ground (or the water mill stone ground) and varnish wall. 2). The device should steady emplacement to reduce the vibration and the noise when it works. 3). Airflow affects greatly the clean result. So worker takes strict precautions against outside various high-speed current of air to interference of operation area, such as door, window, fan, draught of sending air, compressed air etc. 4). Power supply has special switch. After power supply carries on with requisition, please check the wind velocity of the operation experiments that should over 0.3 m/s. Otherwise check again. 5). After installation, please sweep the place with vacuum or long fiber textile that is immerse in cymene. 6. Operation 4 MRC LTD TEL:972-3-5595252 FAX:972-3-5594529 Control Pannel 1、Switch on the power(220V±10%,60Hz) ,turn on the black electrical power on the operation panel. 2、Press the “LIGHT” button,the indicator light on, fluorescent lamp on; press the “LIGHT” button again, the indicator light off, fluorescent lamp off. 3、Press the “UV” button,the indicator light on, UV lamp on; press the UV button again, the indicator light off, UV lamp off. 4、Press the “FANS” button, the indicator light on, the fan starts and goes into operation, press “ ”, the air velocity increases, press “ ”, the air velocity decreases. When the device started, the fan is on the lowest level, one could press “ ” when necessary in order to increase the air velocity. Press the “FANS” again, the indicator light off, the fan stops operating. Usually, when users use the new equipment, because the resistance of the new filter is very small, just the low level could meet the requirements. But as time goes on, the resistance increases, then the users could move to higher level to meet the requirements. 5 MRC LTD TEL:972-3-5595252 FAX:972-3-5594529 5. One could uses the “△、▽” buttons to control the moving of the front glass door. Press and hold “△”, the front glass door moves up, release the button, the front glass door stops; press and hold “▽”, the front glass door moves down, release the button, the front glass door stops. Note: When the front glass door fully closed, the fluorescent lamp and UV lamp could turn on while the fan could not. When the front glass door opened, the fluorescent lamp and fan could turn on while the UV lamp could not. Remark:We can only open the lamp and UV and don't start the fan machine when the glass door was closed .We can only open the lamp and start the fan machine but don't open the UV. 7. Equipment maintenance 1). The key part of proper maintenance ,management and ensuring the cleanness of working zone is building the strict regulation, and strictly control tool, material of the usage and visitor . 2). Ensuring the cleanness of working zone, Advance 10~20 minutes before using, and notice the following: A. Worker must wear the clean smock, hat that is made of long fiber to wash easily. 6 MRC LTD TEL:972-3-5595252 FAX:972-3-5594529 B. Use the ball-point pen and tracing paper to write, which don’t easily suction dust. C. Forbid to do significant action that deliver dust, such as: scratch the head, take a step quickly etc. D. Worker of microorganism and medicine industry must wear the mouth-muffle, forbidding to using the steam to disinfect. E. Don’t put thing on the bench. If the article should be placed to both ends as far as possible. F. During operation head and hands should put in the produce leeway side. With the special demands worker should wear the rubber gloves or the nail sets. J. Zero parts, materials, tool etc should be packed into the clean container. 3). Deposit appropriately the product, tool, material etc after the work, and then stop the bench 4). Periodically carry on the function examination, such as the air velocity and cleanliness in operation area. If discover problem, please check immediately. 7 MRC LTD TEL:972-3-5595252 FAX:972-3-5594529 5). If the filter isn’t satisfied with the usage of request, please take out it, wash away dirt, and pack into again the frame body usage after dried in the air. If it adheres to flush greasy dirt or damages, please replace. 6). After flushing or replacing the filter, please consider to replace efficiently filter, if air flow doesn’t increase. 7). New filter should carefully check whether exterior hurts or not. If it has hurt, please measure whether function uses or not. 8). In bar of air without HEPA filter toward the operation area, please stick latex sponge of the breadth 15 mms, thick 6~8 mms, and the length which is the same as filter in the exhaust of HEPA filter. 9). Open the safeguard-coated, and take out the filter. Then install the new filter. At the same time, please notice as follows: A, Check whether the specification model number fits or not, and notice to installation of direction; B, Compress tightly with the tight firmware, and check sealing state of the frame. C, pack the safeguard-coated and check: 8 MRC LTD TEL:972-3-5595252 FAX:972-3-5594529 (1) Check leak air, spark the stick that produces smoke in the intake-air door, open the breeze machine, account with the muddy degree or particle counter to scan. If it leaks air, please adjust again and again efficiently the filter compresses tightly. If it still reveals, please use Nanda701 gums to stop. (2) Check air speed with technique of request. 10). the disinfection of UV light that of the service life more than 1200 hours, when it is over time, please replace in time. 8.Check Malfunction NO Faults 1 Check points Measure to carry out starter Turn starter or replace Lamp tube Turn starter or replace starter Turn starter or replace Lamp tube replace Lamp tube 2 Lamp is red or waver 3 Ensure power supply connect properly Indicator light and butto Ensure the button control button doesn't work working well Ensure the connecting line well 9 MRC LTD TEL:972-3-5595252 4 FAX:972-3-5594529 Power supply Fans not work Power supply connect properly fans Replace broken fans Speed change Replace board the not change board work 9. Attention 1). When the equipments move, maintain, maintain, please cut off the power source. 2). Check whether the power source fits for the request or not before installation. 3). The power source connects a reliable ground of line necessarily. Grounding marks are on the side of clean bench. 10. Storage and conveyance: 1). Clean work packed should store in the room which is opposite temperature under 80 degrees, no causticity air and good-ventilation. 2). Forbid clean work upends or not put in a pile. 10 speed MRC LTD TEL:972-3-5595252 FAX:972-3-5594529 3). In transport process please put it with care, Forbid heavy pressure or rain pouring. 11. Packing: 1). Over-wrap of the work set has marks as follow: Manufactory, Address, Model number, Name, Gross weight, Physical volume, Date of factory, Handle with care, Heading up etc. 2). Please pack with the plastics bag and put in the box with facilities of defending tide. Circuit chart 11