Important Service Bulletin: E

   EMBED


Share

Transcript

Important Service Bulletin: e-Brick Earthing SERVICE BULLETIN 1003 Issue 1 - Page 1 of 2 1. e-Brick Earthing – Systems with GEW Power Distribution Units. All new UV systems will now be supplied with a supplementary earth cable on each power distribution unit (PDU). The cable(s) must be connected directly (not ‘daisy chained’) to the main earth bar on the printing press. Its purpose is to common-earth circuits together. Each PDU will still require a direct mains earth connection. Supplementary earth cable(s) must be connected to press main earth bar. Each e-Brick must also have the auxiliary earth connection made to the earth connection block. e-Brick auxiliary earth connection. Earth connection block. 2. e-Brick Earthing – Systems without GEW Power Distribution Units. For those systems that do not have a GEW supplied power distribution unit an individual earth cable is supplied and fitted to each e-Brick. These earth cables should be connected directly (not ‘daisy chained’) to the printing press main earth bar. Connect to printing press main earth bar. Note: To maintain good earth continuity it is important to make sure that each printing press frame is adequately earthed to a common earth bar. A schematic diagram is shown overleaf. Keep all earth cables as short as possible. UK Office: GEW (EC) Limited Tel: +44 (0)1737 824500 Fax: +44 (0)1737 823822 GEW Vertriebsbüro Deutschland Tel: +49 (0)7022 3039769 Fax: +49 (0)7022 3039770 American Office: GEW, Inc. Tel: +1 440 237 4GEW (4439) Fax: +1 440 230 4GEW (4439) Indian Office: GEW Asia Pvt. Ltd. Tel: +91 22 2528 5442 Fax: +91 22 2528 5443 ●- [email protected] -●- www.gewuv.com -●- [email protected] -●- www.gewuv.com -●- [email protected] -● PSU2 PSU3 PSU5 EARTH CONNECTIONS TO PRESS (MIN 16MM²) PSU4 EARTH TO UV DISTRIBUTION (MIN 35MM²) PSU7 UV LAMPHEAD PSU6 PRINT STATION PSU8 PROJECT TITLE: OPTIONAL EARTH SPIKE RECOMMENDED WHEN DISTANCE TO MAIN DISTRIBUTION IS GREATER THAN 100M, AND IN AREAS PRONE TO LIGHTENING STRIKES. ENSURE THAT ALL SECTIONS OF THE PRESS ARE SUITABLY EARTHED. NOTES: YELLOW - CABLES WITH EARTH INCLUDED. GREEN - ADDITIONAL SUPPLEMENTARY EARTHING. EARTH LINK LAMPHEAD TO PRINT STATION (MIN 6MM²) EARTH BAR MIN. 20x3MM OPTIONAL EARTH SPIKE PSU1 SECONDARY EARTHS FROM EACH PSU TO UV DISTRIBUTION (MIN 6MM²) UV LAMPHEAD DRAWING TITLE: PRESS PRESS DISTRIBUTION AND ELECTRONICS UV LAMPHEAD PRINT STATION UV LAMPHEAD UV DISTRIBUTION PRINT STATION TO BUILDING MAINS DISTRIBUTION PRINT STATION TO BUILDING MAINS DISTRIBUTION PRINT STATION PROJECT NO SHT UV LAMPHEAD UV LAMPHEAD UV LAMPHEAD PRINT STATION UV LAMPHEAD PRINT STATION PRINT STATION THIS DRAWING MUST NOT BE REPRODUCED OR DISTRIBUTED WITHOUT THE WRITTEN PERMISSION OF GEW (EC) LIMITED. WWW.GEWUV.COM (0)1737 824 500 ....engineering UV GEW DRAWING NUMBER OPTIONAL EARTH SPIKE EARTH TO PRESS DISTRIBUTION (MIN 50MM²)