Preview only show first 10 pages with watermark. For full document please download

Installation And Setup Instructions

   EMBED


Share

Transcript

1 1 2 4 3 5 Installation and Setup Instructions AltaVault System Power on disk shelf You must power on all the disk shelves before powering on the controller. Powering on the controller before the disk shelf prevents AltaVault OS from operating normally. 1 Power on disk shelf; move the power switch to the ON (|) position. BOTH power supplies MUST be powered on. • Verify that the power supplies are working correctly: PSU OK LED ( ) is lit green in each power supply. • View the disk shelf LEDs (on shelf front) to verify the disk shelf powered on correctly: Power LED ( Fault LED ( 2 ) is lit green. ) is not lit. Power switch Set the disk shelf ID Visually verify that the ID for each disk shelf is unique, and if not, set the disk shelf ID. NOTE: A valid shelf ID for a AltaVault system could be one of 00, 01, 10, 11. 00 is the default shelf ID. Shelf fault LED 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 18 2 1 4 3 5 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 480 GB 1 In the box: You provide: Configuration worksheet Power on controller 17 Prepare for installation digital display (two digits) 2 16 DS2246 480 GB a. Using one hand, hold the left ear cover between your thumb and index finger. Pull either the top or the bottom of the cover until one end is released. Pull off the left ear cover. b. Press and hold the shelf ID button until the first digit on the digital display blinks. c. Press the button until the desired number (between 0 and 9) is displayed. This number continues to blink. d. Repeat steps b and c for the second digit. e. Press and hold the button until the second number stops blinking. Both numbers on the digital display should blink and the shelf fault LED illuminates in about five seconds. Left ear cover The fault LED stays lit until you power-cycle the shelf. f. Power-cycle the disk shelf to make the new disk shelf ID takes effect. g. Replace the left ear cover. Shelf ID SAS cables: Power cables: Rack space - 10U mini SAS HD-QSFP cable (controller-shelf) QSFP-QSFP cable (shelf-shelf) 2 per controller chassis 2 per disk shelf AltaVault system chassis: 6U AVA10S disk shelf: 4U X3 1 4 9 A X2 0 6 7 3 Power switch L N K a LNK ACT 4 b 5 INT LNK c 1 LNK Power on controller; move the power switch to the ON (|) position. BOTH power supplies MUST be powered on. 6 e0a e0b e0c e0d e0e 0a e0f 0b LINK LINK LINK LINK 0d LINK 14 9 15 10 16 A 13 8 B 7 C ) is lit green in each power supply. 0c LINK LINK LINK D • Verify that the power supplies are working correctly: PSU OK LED ( ACT d 0 You provide: • View the system LEDs (on controller front) to verify the controller powered on correctly: Power LED ( ) is lit green. System attention LED ( The System attention LED turns off when AltaVault OS is finished booting up. 2 2 Install bezel • Hold the bezel parallel to the front of the controller. • Install the bezel on the controller front as shown in the illustration. • The bezel will snap into place. 3 Additional network cables Computer with Internet Screwdriver and screws For connecting your storage system to Ethernet switches Initial configuration is done via serial console For securing hardware into racks ) blinks for a few minutes while AltaVault OS is booting up. Install AltaVault controller Finish AltaVault Setup over Serial Console RAID Card with mini SAS HD ports Controller attention LED 3 4 5 RAID Card with mini SAS HD ports X3 1 4 9 A X2 0 6 7 Power supplies See the NetApp AltaVault Cloud Integrated Storage Installation and Service Guide at the NetApp Support site. 2 1 FRONT VIEW OF CONTROLLER 1 3 2 4 Management port (wrench icon) LNK LNK LNK 0a 0b 0c LNK 0d LNK LNK e0a LNK e0b e0c LNK e0d LNK e0e|0e LNK LNK LNK | e0f|0f | | e0g|0g | e0h|0h e0i e0j e0k e0i 3 A HELPFUL LINKS Visit the NetApp web site for more information. To view AltaVault documentation see: http://mysupport.netapp.com NetApp support site 5 Complete AltaVault System Setup Power LED Bezel System attention LED A Controller activity LED REAR VIEW OF CONTROLLER 4 Console port (Setting: 9600 N-8-1) 210-06615+A0 2 Install AltaVault controller 1 1 2 Install controller in rack or cabinet 4 3 5 1 LIFTING HAZARD CAUTION 4 Connect cables 1 95 lbs. (43.1 kg) Install the mounting rails (provided in rail kit) following the instructions in rail kit. • Use chassis handles while lifting. 2 Mount the chassis in the rack. 3 Secure chassis to rack using appropriate screws (not provided). Connect the management port (wrench icon) on your controller to the Ethernet switch in your management network, using a network cable. 1 3 5 7 9 11 13 15 2 4 6 8 10 12 14 16 1 3 5 7 9 11 13 15 2 4 6 8 10 12 14 16 5 To management port (wrench icon) on controller 1000/100/10M LNK / 1000/100/10M LNK / To Ethernet switch • e0i e0k e0j e0i Network cable See your network administrator for help connecting to your switches. Alternatively, you can mid-mount the chassis using the mid-mount brackets provided in the rail kit. 4 3 Connect controller to networks • NOTE: Controller and disk shelves are shipped in separate boxes. 2 1 GigE ports 10GigE ports 3 Connect 10GigE ports or GigE ports for data connection. To host GigE or 10GigE cables To Ethernet switch 1 LNK LNK LNK LNK 4 1 3 5 7 9 11 13 15 2 4 6 8 10 12 14 16 1 3 5 7 9 11 13 15 2 4 6 8 10 12 14 16 1000/100/10M LNK / 1000/100/10M LNK / e0a e0c e0b e0d Optional 2-Post Mid-mount Brackets 2 Connect controller to a computer AltaVault system VLAN Serial console is needed to configure IP address for management port. Once this is done, further configuration can be done using a web browser and connecting to the management IP address. 3 Management port 3 4 Windows client Console port LNK 0h|0h e0i e 1 3 5 7 9 11 13 15 2 4 6 8 10 12 14 16 e0j e0i e0k Management subnet Install disk shelves 1 2 4 3 5 3 Connect controller to shelf Latch release To controller mini SAS HD port NOTE: For optimal system performance, it is required that you cable your storage system as described here. FRONT VIEW OF DISK SHELF 24 Disk drives CLICK SAS cabling instructions Disk activity and fault LEDs Shelf LEDs: power shelf fault activity To controller: Ensure that latch release is facing up. To disk shelf: Ensure that latch release is facing down. Latch release CLICK To disk shelf SAS port Insert this end of the SAS cable into the mini SAS HD port on the controller. - You hear a distinct click when the cable latches securely in the port. - Tug on the cable to make sure the cable is latched securely. - Re-attach the cable if you do not hear the click sound or if the cable is loose.* Shelf ID digital display (two digits) *Pull latch release to remove SAS cable. Right ear cover Left ear cover X3 1 4 9 A X2 0 6 7 REAR VIEW OF DISK SHELF Two I/O modules (IOM6) IOM fault LED 1 3 2 4 Configuration SAS ports SAS port link LEDs • • Power supply LEDs : PSU ok DC fault AC AC fault Fan fault 1 2 AltaVault controller: 1 Up to 3 AVA10S shelves LNK LNK LNK 0a 0b 0c LNK 0d LNK LNK e0a LNK e0b e0c LNK e0d LNK LNK e0e|0e e0f|0f LNK e0g|0g LNK e0h|0h e0i e0j e0k e0i 3 1 Meter mini SAS to QSFP+ 5 Meter mini SAS to QSFP+ 4 NOTE: For configuring more than one shelf, see the NetApp AltaVault Cloud Integrated Storage Installation and Service Guide. Two power supplies with integrated fans 4 Install shelf in rack or cabinet DO NOT remove HDDs from the disk shelf during installation. Excessive handling of the drives can lead to internal damage. NOTE: You can install the shelf above or below the controller. The distance between the shelf and controller is dependent on the length of the SAS cables you plan to use. 1 2 Install the mounting rails (provided in rail kit) following the instructions in rail kit. Be cautious while lifting. LIFTING HAZARD CAUTION Mount the disk shelf in the rack. 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB Secure shelf to rack using appropriate screws (not provided). Alternatively, you can mid-mount the shelf using the mid-mount brackets provided in the rail kit. Two power supplies MUST be installed in each disk shelf. Two power supplies MUST be installed in each controller chassis. - Ensure the power switch on each power supply is in the OFF position (O). - Cable both power supplies for each disk shelf. 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 3.0TB 80-100 lbs. (36-45 kg) - Ensure the power switch on each power supply is in the OFF position (O). - Cable both power supplies for each controller chassis. DO NOT power on the controller at this point. Power switch X3 1 4 9 A X2 0 6 7 1 3 2 3.0TB 3 • Disk shelf Connect power cords • Controller LNK LNK LNK 0a 0b 0c LNK 0d LNK LNK e0a LNK e0b e0c 4 LNK e0d LNK LNK e0e|0e e0f|0f LNK e0g|0g LNK e0h|0h e0i e0j e0k e0i 3 4 Use retaining clips Power switch