Preview only show first 10 pages with watermark. For full document please download

Installation Instructions 1662sg.214 1662sg.224

   EMBED


Share

Transcript

Installation Instructions COMMERCIAL SHOWER SYSTEM KITS: 1.5gpm & 2.5gpm 1662SG.214 1662SG.224 16 6 2 S G . 2 14 ( 1. 5 g p m ) 16 6 2 S G . 2 2 4 ( 2 . 5 g p m ) Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years. To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin. Certified to comply with ANSI A112.18.1 Installation must conform to all local building codes. Recommended Tools & Materials M965669 (3/15) Sealing Tape 10' Pencil Phillips Screwdriver Torch Hammer Tape Measure 6mm (15/64") Drill Bit Electric Drill Adjustable Wrench Pipe Wrench Tubing Cutter ROUGHING-IN DIMENSIONS 1-5/8" TO 3-1/4" 1/2" NPT FINISHED WALL 1660766.002 (1.5 gpm) 8-1/8" 2-5/16" 1660767.002 (2.5 gpm) 4" REF. OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 65" TO 78" OPTIONAL 3-1/8" DIA. 1/2" NPSM 8" 7" REF. 1/2" NPT FINISHED WALL 74" FOR HEAD CLEARANCE 1/2" 1-1/4" 12" OPTIONAL 3-1/8" DIA. 1/2" NPT 2-3/4" DIA. 36" 45˚ 3-1/8" DIA. 5-3/4" 12" OPTIONAL 6" DIA. 1-5/8" 37-1/2" 18" OPTIONAL PLUG TUB OUTLET 1/2" COPPER OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 60" 36" TO 48" 1" MIN. 5-1/8" REF. 1/2" SUPPLIES VALVE BODY HAS 1/2" SWEAT INLETS AND OUTLETS TOP OF TUB RIM BOTTOM OF TUB 4" 1 INSTALL THE R120SS VALVE BODY R120SS NOTE REFER TO INSTALLATION INSTRUCTIONS (M968387) SUPPLIED WITH VALVE BODY FOR COMPLETE INSTALLATION AND REPAIR PART INFORMATION. IMPORTANT When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering, flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread sealant or Teflon tape on threaded connections. See Roughing-in diagram before starting. Connections are: 1/2" copper sweat for sweat inlets 1/2" copper sweat for sweat tub and shower outlets 2 1/2" SWEAT PLUG INSTALL THE R430 THREE-WAY DIVERTER THREE-WAY DIVERTER NOTE REFER TO INSTALLATION INSTRUCTIONS (50321) SUPPLIED WITH DIVERTER FOR COMPLETE INSTALLATION AND REPAIR PART INFORMATION. IMPORTANT The reverse side of the body is marked with arrows. CAUTION: Do not solder near the VALVE. Damage to the SEAL may occur. Do not seal any outlets. The DIVERTER cannot be used as a stop valve. Use thread sealant or sealing tape on threaded connections. 1/2" NPT SHOWER See Roughing-in diagram before starting. The port with the BATH TUB picture is the high flow. The DIVERTER can be installed with the inlet rotated in any position. 1/2" NPT HAND SHOWER All connections are 1/2" NPT. 1/2" NPT TUB For proper positioning the finished wall must be within the side of PLASTER GUARD. Connect the R430 THREE-WAY DIVERTER to the R120SS VALVE BODY. 1/2" NPT INLET 3 MAKE ALL CONCEALED PIPING CONNECTIONS See Roughing-in diagram before starting. Make Hot and Cold supply connections to the VALVE BODY. Inlet and outlet connections to the valve body are 1/2" copper sweat. Make Tub Filler connection from DIVERTER. (Use the port with the BATH TUB picture). DIVERTER IS 1/2" NPT. TUB SPOUT connection is 1/2" copper for SLIP-ON SPOUT. Make the connections for the SHOWER and HAND SHOWER. The SHOWER and HAND SHOWER connections are 1/2" NPT. For support, use PIPE BRACES secured to wooden braces. Cap off SHOWER, HAND SHOWER and TUB SPOUT FILLER PIPE. With the R120SS VALVE turned off, turn on water supplies. Check for leaks. Finish all wall construction. 4 INSTALL VALVE TRIM FLOWISE SHOWER HEAD NOTE REFER TO INSTALLATION INSTRUCTIONS (M968763) SUPPLIED WITH VALVE TRIM KIT FOR COMPLETE INSTALLATION AND REPAIR PART INFORMATION. PLUG When finished tiling the wall, remove PLASTER GUARD. Remove cap from tub supply and plug from shower pipe. PLASTER GUARD CAP M965669 (3/15) 5 INSTALL DIVERTER TRIM AND HANDLE When finished tiling the wall, remove PLASTER GUARD. Place ESCUTCHEON (1) onto ESCUTCHEON HOLDER (2). Thread ESCUTCHEON HOLDER (2) onto DIVERTER VALVE (3). Tighten until ESCUTCHEON (1) is snug against finished wall. 2 Install HANDLE SKIRT (4) onto VALVE STEM (5). Push DECORATIVE RING (6) onto LEVER HANDLE (7). Align LEVER HANDLE (7) and push onto HANDLE SKIRT (4). Install HANDLE SCREW (8) and tighten. 4 3 6 Push INDEX CAP (9) into LEVER HANDLE (7). 9 1 MAX 5 8 PLASTER GUARD 7 6 INSTALL WALL SUPPLY Supply to WALL SUPPLY is 1/2" NPT. See rough-in above for detailed information. 1/2" NPT APPLY SEALANT OR SEALING TAPE Apply sealant or sealing tape to threads of 1/2" NPT supply nipple. 7 INSTALL HOSE AND HAND SHOWER TEST SHOWER SYSTEM Install SEAL (1) into COUPLING NUT (2). Connect COUPLING NUT (2) to WALL SUPPLY NIPPLE (3) and tighten. INSTALL second SEAL (4) into SPRAY HOSE END (5) and connect HAND SHOWER (6) to SPRAY HOSE END (5). Hand tighten. 6 Turn on water supplies and check all fuctions of of the SHOWER SYSTEM KIT. Check for any leaks. 4 5 3 1 2 M965669 (3/15) 8 INSTALLATION INSTRUCTIONS The GRAB BAR (1) works best when secured to the wall studs or cross brace using WOOD SCREWS. If mounting into the studs is not possible, use appropriate wall fasteners provided to secure the installation. Mark a vertical center line in the location you wish to install the SLIDE BAR (1). NOTE: The height from the finished floor is optional. See rough-in drawing for suggested dimensions. Determine desired height from the finished floor to the lower support and mark a horizontal center line. Slide the two WALL ESCUTCHEONS (5) away from the MOUNTING FLANGES (3). Position the GRAB BAR (1) as shown in Fig. A and mark the location of the six mounting holes to be drilled. Fig. A. Using a #10 masonry drill, drill six mounting holes 1-1/4" max. deep. Fig. B. Install the six ANCHORS (2) provided into the mounting holes. Use a hammer to lightly tap ANCHORS (2) into place. Make sure they are installed flush against the finished wall. Fig. B. Align and place the GRAB BAR MOUNTING FLANGES (3) over the installed ANCHORS (2). Secure the GRAB BAR (1) to the wall with the SCREWS (4) provided. Fig. B. Push WALL ESCUTCHEONS (5) against finished wall. Rotate WALL ESCUTCHEONS (5) clockwise to lock into position. Fig. C. Make sure larger diameter side of SPRAY HOLDER (6) is facing upward. If not rotate SPRAY HOLDER (6) 180 dergees. Rotate the LEVER HANDLE (7) to the unlocked position. Push the SPRAY HOLDER (6) side onto the GRAB BAR (1). Push the LEVER HANDLE SIDE (7) over the SPRAY HOLDER ARMS (8) until the two snap togerther. Check operation of SLIDE BAR (1) by rotating HOLDER LEVER (7) and moving HAND SHOWER HOLDER (9) up and down. Rotate LEVER HANDLE (7) back to lock HAND SHOWER HOLDER (6). Fig. B. Fig. A Fig. B C/L 4 2 3 Fig. C DRILLED MOUNTING HOLES ROTATE CLOCKWISE TO LOCK VERTICAL CENTER LINE 914mm (36") 5 5 1 LARGE DIAMETER UP 1 1 6 UNLOCK 7 8 LEVEL LOCK 5 FINISHED FLOOR OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 915mm TO 1525mm (36") (60") CARE INSTRUCTIONS: DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH. DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A CLOTH WITH A COARSE SURFACE. M965668 (3/15) COLONY SOFT SHOWER TRIM PRESSURE BALANCE TEMPERATURE/VOLUME CONTROL VALVE MODEL NUMBER T675.501 023560-0020A SHOWER ARM AND FLANGE MODEL NUMBER R120SS 051122-0070A SCREWDRIVER STOPS 013205-0070A STOP VALVE O-RING TUB SPOUT MODEL NUMBER 1660.710-002 FloWise™ SHOWER HEAD 8888.056 M953530-0020A SHOWER HEAD M952100-0070A PRESSURE BALANCING UNI M961856-0020A ESCUTCHEON AND SCREWS 023529-0070A CARTRIDG 078016-0020A ESCUTCHEON SCREWS 050145-0070A 1/2" SWEAT PLUG M907050-0020A ESCUTCHEON CAP SET M961854-0070A FIXATION RING WITH SCREWS 023603-0070A CARTRIDGE SCREWS 8888.056-0020A SPOUT (Slip-on) M909606-0020A DECAL 030126-0070A HANDLE SCREW KIT Appropriate finish code CHROME 002 M961636-0020A LEVER HANDLE KIT 060220-0070A DIVERTER REPAIR KIT 3-WAY DIVERTER VALVE Appropriate finish code CHROME 002 MODEL NUMBER R430 051310-0070A SPRING KIT 912737-0070A STEM O-RING 051309-0070A CAP PLASTER GUARD THREE WAY BODY 060219-0070A STEM KIT 012157-0020A HANDLE SKIRT 012288-0020A ESCUTCHEON KIT MAX 912647-0070A CAP SEAL 012189-0020A INDEX BUTTON 012673-0020A LEVER HANDLE HERITAGE HANDLE DIVERTER TRIM MODEL NUMBER 954027-002OA ESCUTCHEON HOLDER T342.430 HOT LINE FOR HELP For toll-free information and answers to your questions, call: 1-800-442-1902 Weekdays 8:00 a.m. to 6:00 p.m. EST IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093) Weekdays 8:00 a.m. to 7:00 p.m. EST IN MEXICO 01-800-839-1200 Product names listed herein are trademarks of American Standard Inc. © AS America, Inc. 2015 012205-0070A COLOR RING KIT 918572-0070A HANDLE SCREW M965669 (3/15) 3-FUNCTION HAND SHOWER 1660766.002 (1.5 gpm) 1660767.002 36" SLIDE BAR 1660.236.002 (2.5 gpm) WALL SUPPLY M9641800020A SPRAY HOLDER ASSEMBLY 8888.037.002 M964179-0070A MOUNTING KIT 8888037.002 WALL SUPPLY M962520-0020A CHECK VALVE METAL HOSE 030782-0020A HOSE KIT 8888.035.002 Appropriate finish code CHROME 002 HOT LINE FOR HELP For toll-free information and answers to your questions, call: 1-800-442-1902 Weekdays 8:00 a.m. to 6:00 p.m. EST IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093) Weekdays 8:00 a.m. to 7:00 p.m. EST IN MEXICO 01-800-839-1200 Product names listed herein are trademarks of American Standard Inc. © AS America, Inc. 2015 M965669 (3/15)