Transcript
Installation Instructions
COMMERCIAL SHOWER SYSTEM KITS: 1.5gpm & 2.5gpm
1662SG.214 1662SG.224
16 6 2 S G . 2 14 ( 1. 5 g p m ) 16 6 2 S G . 2 2 4 ( 2 . 5 g p m )
Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years. To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin. Certified to comply with ANSI A112.18.1
Installation must conform to all local building codes. Recommended Tools & Materials
M965669 (3/15)
Sealing Tape 10'
Pencil
Phillips Screwdriver
Torch
Hammer
Tape Measure
6mm (15/64") Drill Bit Electric Drill
Adjustable Wrench
Pipe Wrench
Tubing Cutter
ROUGHING-IN DIMENSIONS 1-5/8" TO 3-1/4"
1/2" NPT
FINISHED WALL
1660766.002 (1.5 gpm)
8-1/8"
2-5/16"
1660767.002 (2.5 gpm)
4" REF. OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 65" TO 78"
OPTIONAL 3-1/8" DIA.
1/2" NPSM
8"
7" REF. 1/2" NPT
FINISHED WALL
74" FOR HEAD CLEARANCE
1/2"
1-1/4"
12" OPTIONAL 3-1/8" DIA.
1/2" NPT
2-3/4" DIA.
36"
45˚
3-1/8" DIA.
5-3/4"
12" OPTIONAL 6" DIA.
1-5/8"
37-1/2" 18" OPTIONAL PLUG TUB OUTLET
1/2" COPPER
OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 60" 36" TO 48"
1" MIN.
5-1/8" REF. 1/2" SUPPLIES VALVE BODY HAS 1/2" SWEAT INLETS AND OUTLETS
TOP OF TUB RIM BOTTOM OF TUB
4"
1
INSTALL THE R120SS VALVE BODY R120SS
NOTE
REFER TO INSTALLATION INSTRUCTIONS (M968387) SUPPLIED WITH VALVE BODY FOR COMPLETE INSTALLATION AND REPAIR PART INFORMATION. IMPORTANT
When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering, flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread sealant or Teflon tape on threaded connections. See Roughing-in diagram before starting. Connections are: 1/2" copper sweat for sweat inlets 1/2" copper sweat for sweat tub and shower outlets
2
1/2" SWEAT PLUG
INSTALL THE R430 THREE-WAY DIVERTER
THREE-WAY DIVERTER
NOTE
REFER TO INSTALLATION INSTRUCTIONS (50321) SUPPLIED WITH DIVERTER FOR COMPLETE INSTALLATION AND REPAIR PART INFORMATION. IMPORTANT
The reverse side of the body is marked with arrows. CAUTION: Do not solder near the VALVE. Damage to the SEAL may occur. Do not seal any outlets. The DIVERTER cannot be used as a stop valve. Use thread sealant or sealing tape on threaded connections.
1/2" NPT SHOWER
See Roughing-in diagram before starting. The port with the BATH TUB picture is the high flow.
The DIVERTER can be installed with the inlet rotated in any position. 1/2" NPT HAND SHOWER
All connections are 1/2" NPT.
1/2" NPT TUB
For proper positioning the finished wall must be within the side of PLASTER GUARD. Connect the R430 THREE-WAY DIVERTER to the R120SS VALVE BODY. 1/2" NPT INLET
3
MAKE ALL CONCEALED PIPING CONNECTIONS See Roughing-in diagram before starting.
Make Hot and Cold supply connections to the VALVE BODY. Inlet and outlet connections to the valve body are 1/2" copper sweat. Make Tub Filler connection from DIVERTER. (Use the port with the BATH TUB picture). DIVERTER IS 1/2" NPT. TUB SPOUT connection is 1/2" copper for SLIP-ON SPOUT. Make the connections for the SHOWER and HAND SHOWER. The SHOWER and HAND SHOWER connections are 1/2" NPT. For support, use PIPE BRACES secured to wooden braces. Cap off SHOWER, HAND SHOWER and TUB SPOUT FILLER PIPE. With the R120SS VALVE turned off, turn on water supplies. Check for leaks. Finish all wall construction.
4
INSTALL VALVE TRIM
FLOWISE SHOWER HEAD
NOTE
REFER TO INSTALLATION INSTRUCTIONS (M968763) SUPPLIED WITH VALVE TRIM KIT FOR COMPLETE INSTALLATION AND REPAIR PART INFORMATION.
PLUG
When finished tiling the wall, remove PLASTER GUARD. Remove cap from tub supply and plug from shower pipe.
PLASTER GUARD
CAP
M965669 (3/15)
5
INSTALL DIVERTER TRIM AND HANDLE When finished tiling the wall, remove PLASTER GUARD. Place ESCUTCHEON (1) onto ESCUTCHEON HOLDER (2). Thread ESCUTCHEON HOLDER (2) onto DIVERTER VALVE (3). Tighten until ESCUTCHEON (1) is snug against finished wall. 2
Install HANDLE SKIRT (4) onto VALVE STEM (5). Push DECORATIVE RING (6) onto LEVER HANDLE (7). Align LEVER HANDLE (7) and push onto HANDLE SKIRT (4). Install HANDLE SCREW (8) and tighten.
4 3
6
Push INDEX CAP (9) into LEVER HANDLE (7). 9
1
MAX
5
8
PLASTER GUARD
7
6
INSTALL WALL SUPPLY Supply to WALL SUPPLY is 1/2" NPT. See rough-in above for detailed information. 1/2" NPT APPLY SEALANT OR SEALING TAPE
Apply sealant or sealing tape to threads of 1/2" NPT supply nipple.
7
INSTALL HOSE AND HAND SHOWER TEST SHOWER SYSTEM Install SEAL (1) into COUPLING NUT (2). Connect COUPLING NUT (2) to WALL SUPPLY NIPPLE (3) and tighten. INSTALL second SEAL (4) into SPRAY HOSE END (5) and connect HAND SHOWER (6) to SPRAY HOSE END (5). Hand tighten.
6
Turn on water supplies and check all fuctions of of the SHOWER SYSTEM KIT. Check for any leaks.
4 5 3 1 2
M965669 (3/15)
8
INSTALLATION INSTRUCTIONS The GRAB BAR (1) works best when secured to the wall studs or cross brace using WOOD SCREWS. If mounting into the studs is not possible, use appropriate wall fasteners provided to secure the installation. Mark a vertical center line in the location you wish to install the SLIDE BAR (1). NOTE: The height from the finished floor is optional. See rough-in drawing for suggested dimensions. Determine desired height from the finished floor to the lower support and mark a horizontal center line. Slide the two WALL ESCUTCHEONS (5) away from the MOUNTING FLANGES (3). Position the GRAB BAR (1) as shown in Fig. A and mark the location of the six mounting holes to be drilled. Fig. A. Using a #10 masonry drill, drill six mounting holes 1-1/4" max. deep. Fig. B. Install the six ANCHORS (2) provided into the mounting holes. Use a hammer to lightly tap ANCHORS (2) into place. Make sure they are installed flush against the finished wall. Fig. B. Align and place the GRAB BAR MOUNTING FLANGES (3) over the installed ANCHORS (2). Secure the GRAB BAR (1) to the wall with the SCREWS (4) provided. Fig. B. Push WALL ESCUTCHEONS (5) against finished wall. Rotate WALL ESCUTCHEONS (5) clockwise to lock into position. Fig. C. Make sure larger diameter side of SPRAY HOLDER (6) is facing upward. If not rotate SPRAY HOLDER (6) 180 dergees. Rotate the LEVER HANDLE (7) to the unlocked position. Push the SPRAY HOLDER (6) side onto the GRAB BAR (1). Push the LEVER HANDLE SIDE (7) over the SPRAY HOLDER ARMS (8) until the two snap togerther. Check operation of SLIDE BAR (1) by rotating HOLDER LEVER (7) and moving HAND SHOWER HOLDER (9) up and down. Rotate LEVER HANDLE (7) back to lock HAND SHOWER HOLDER (6). Fig. B. Fig. A
Fig. B
C/L
4
2 3
Fig. C DRILLED MOUNTING HOLES ROTATE CLOCKWISE TO LOCK
VERTICAL CENTER LINE
914mm (36")
5
5
1 LARGE DIAMETER UP
1
1
6
UNLOCK
7 8 LEVEL LOCK
5
FINISHED FLOOR
OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 915mm TO 1525mm (36") (60")
CARE INSTRUCTIONS: DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH. DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A CLOTH WITH A COARSE SURFACE. M965668 (3/15)
COLONY SOFT SHOWER TRIM
PRESSURE BALANCE TEMPERATURE/VOLUME CONTROL VALVE
MODEL NUMBER
T675.501 023560-0020A SHOWER ARM AND FLANGE
MODEL NUMBER
R120SS 051122-0070A SCREWDRIVER STOPS 013205-0070A STOP VALVE O-RING
TUB SPOUT MODEL NUMBER
1660.710-002 FloWise™ SHOWER HEAD
8888.056 M953530-0020A SHOWER HEAD
M952100-0070A PRESSURE BALANCING UNI
M961856-0020A ESCUTCHEON AND SCREWS
023529-0070A CARTRIDG
078016-0020A ESCUTCHEON SCREWS
050145-0070A 1/2" SWEAT PLUG M907050-0020A ESCUTCHEON CAP SET M961854-0070A FIXATION RING WITH SCREWS
023603-0070A CARTRIDGE SCREWS
8888.056-0020A SPOUT (Slip-on)
M909606-0020A DECAL 030126-0070A HANDLE SCREW KIT
Appropriate finish code CHROME
002 M961636-0020A LEVER HANDLE KIT
060220-0070A DIVERTER REPAIR KIT
3-WAY DIVERTER VALVE
Appropriate finish code CHROME
002
MODEL NUMBER
R430
051310-0070A SPRING KIT 912737-0070A STEM O-RING
051309-0070A CAP PLASTER GUARD
THREE WAY BODY
060219-0070A STEM KIT
012157-0020A HANDLE SKIRT
012288-0020A ESCUTCHEON KIT
MAX
912647-0070A CAP SEAL 012189-0020A INDEX BUTTON 012673-0020A LEVER HANDLE
HERITAGE HANDLE DIVERTER TRIM MODEL NUMBER
954027-002OA ESCUTCHEON HOLDER
T342.430
HOT LINE FOR HELP For toll-free information and answers to your questions, call: 1-800-442-1902 Weekdays 8:00 a.m. to 6:00 p.m. EST IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093) Weekdays 8:00 a.m. to 7:00 p.m. EST IN MEXICO 01-800-839-1200 Product names listed herein are trademarks of American Standard Inc. © AS America, Inc. 2015
012205-0070A COLOR RING KIT
918572-0070A HANDLE SCREW
M965669 (3/15)
3-FUNCTION HAND SHOWER
1660766.002 (1.5 gpm)
1660767.002
36" SLIDE BAR
1660.236.002
(2.5 gpm)
WALL SUPPLY
M9641800020A SPRAY HOLDER ASSEMBLY
8888.037.002
M964179-0070A MOUNTING KIT
8888037.002 WALL SUPPLY
M962520-0020A CHECK VALVE
METAL HOSE
030782-0020A HOSE KIT
8888.035.002
Appropriate finish code CHROME
002
HOT LINE FOR HELP For toll-free information and answers to your questions, call: 1-800-442-1902 Weekdays 8:00 a.m. to 6:00 p.m. EST IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093) Weekdays 8:00 a.m. to 7:00 p.m. EST IN MEXICO 01-800-839-1200 Product names listed herein are trademarks of American Standard Inc. © AS America, Inc. 2015
M965669 (3/15)