General This document is to be used to gather necessary information regarding the equipment and operation of a facility so that the Quest Controls TELSEC™ can be successfully installed and programmed. Attached any drawings and/or pictures that would be helpful in developing the control and monitoring for this site. Type of RT: CEV ___ HUT ____ CEC_____ WIC____ Cabinet ____ Other___ Survey Date:
Site Name: Location: Surveyed by:
Contact Number:
Environmental Controls: The Environmental Control section of this survey should be filed out by the mechanical contractor or building technician responsible for this facility. Mechanical
Electronic (DDC)
Other
Describe control panel, manufacturer, condition etc.:
Is there a Vent Fan in this facility? Y/N Is the vent fan separate from the air conditioning and heating units? Y/N Control Voltage
Control Vent Fan By:
Is There A Motorized Outside Air Damper For Ventilation? Y/N Is There An End Switch On The Damper To Prove It Is Open? Y/N Control Voltage
Control Damper By:
Air Conditioning Stages:
Control Voltage
Control AC 1 By:
Control AC 2 By:
Additional information: Heating Stages:
Control Voltage
Control Heat 1 By:
Control Heat 2 By:
Additional information: Dehumidifier? Y/N
Control Voltage
Page 1 of 1
Control Dehumidifier By:
Quest Controls Inc. Audible Alarm? Y/N
941-729-4799 www.questcontrols.com Installation Worksheet Control Voltage
Control Audible Alarm By:
Control Voltage
Red/Green Warning Lights? Y/N Control Green Light By:
Control Red Light By:
Is the green light in series with hatch switch? Can both lights be controlled with one output? Describe Current Operating Sequence: Sump Pump? Y/N
Control Voltage
Control Pump By
Is Voltage Present On Floats? Y/N Can floats be separated to provide dry contact closures? Y/N Interior Lights: Describe Current Control sequence: Control Voltage Emergency Lights? Y/N
Control Lights By: Control Voltage
Additional Comments For Environmental Control:
Page 2 of 2
Control Lights By
Quest Controls Inc.
941-729-4799 www.questcontrols.com Installation Worksheet
Environmental Alarms The TELSEC™ replaces existing monitoring and alarm transport systems. Identify all environmental alarm points that are in the facility. Terminal location Alarm Name
Tip
Ring
Normally Open (NO) Normally Closed(NC)
Voltage normal* Tip
Ring
Voltage Alarm* Tip
Commercial Power Smoke Fire Detector Fail Vent Fan Fail Intrusion Explosive Gas Toxic Gas High Water
*Provide voltage if contact will be a wet contact when connected to the TELSEC otherwise write DRY.
Page 3 of 3
Ring
Quest Controls Inc.
941-729-4799 www.questcontrols.com Installation Worksheet
Telephony Alarms: Identify all alarms to be monitored such as Muxes, Kentrox, DDM1000, DDM2000, Litespan, Fuse Alarms, Circuit Breakers, Rectifiers etc. Terminal location Alarm Name
Tip
Ring
Normally Open (NO) Normally Closed(NC)
Voltage normal* Tip
Ring
Voltage Alarm* Tip
Ring
*Provide voltage if contact will be a wet contact when connected to the TELSEC otherwise write DRY.
Additional Comments:
Page 4 of 4
Quest Controls Inc.
941-729-4799 www.questcontrols.com Installation Worksheet
Battery Monitoring This section is for sites that will require additional battery monitoring than what is provided by monitoring the float voltage. Note the TELSEC™ will monitor bulk power and provide time remaining/capacity information from the incoming power connection to the panel. Typical Float Voltage: Bulk or Distributed Power?
If Distributed, # of Bays
Will Jars Be Monitored For Voltage? Y/N Number of Jars Per String:
Number of Battery Strings:
Will Batteries Be Monitored For Thermal Protection? Y/N Number of Strings For Temperature Monitoring? Additional Comments:
Access Control: Card Access:
Will Site Use: Keypad/Card Access: Describe Door and Locking Mechanism:
Page 5 of 5
None:
Quest Controls Inc.
941-729-4799 www.questcontrols.com Installation Worksheet
Generator Monitoring:
Y/N ____
Identify all alarms to be monitored on the generators such as generator fail, enable/disable, transfer switch, running, fuel tank levels, fuel tank leakage, etc.. Alarm Name
Terminal location
Digital or Analog
Input Signal Range (or NO/NC for digital)
Remote Generator Start? Y/N ___ If Yes, what is tie in point? _______________ Remote Transfer Switch? Y/N ___ If Yes, what is tie in point? ________________ Provide any additional pertinent information on generator:
Page 6 of 6
Quest Controls Inc.
Tower Light Monitoring:
941-729-4799 www.questcontrols.com Installation Worksheet Y/N ____
Identify all tower light points to be alarmed. Alarm Name
Input Signal (NO/NC)
Terminal location
Strobe Beacon Side
Additional information:
Cable Pressure & Air Flow Monitoring: Y/N _____ How many pressure sensors/transducers? _____________________________ How many flow sensors/transducers? _____________________________ What type of sensors/what outputs? 4-20mA
Resistance
Other
Subscriber or Dedicated pairs? _____________________________ Additional information:
Page 7 of 7
Quest Controls Inc.
941-729-4799 www.questcontrols.com TELSEC™ Installation Worksheet Schedule of Inputs and Outputs
Site Name:
Revision Date:
Digital Outputs # 1 2 3 4 5 6 7 8
Output Name
Connect To:
# 9 10 11 12 13 14 15 16
Output Name
Connect To:
Input Name
Sensor Type
UNIVERSAL INPUTS # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Input Name CEV TEMPERATURE CEV HUMIDITY DC POWER PLANT VOLTAGE
Sensor Type TEMP ºF %RH VDC power to unit
# 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32