Preview only show first 10 pages with watermark. For full document please download

Instructions - Environmental Air Space Housing

   EMBED


Share

Transcript

Assembly/Installation Instructions Phantom Projector Lift Plenum Housing by Draper 8 10 6 7 1 11 5 12 9 13 Plenum Knock-out for cable entry Item Back 3 12 9 4 Installing Optional Plenum Housing The Plenum Housing is shipped in pieces, and must be assembled by the installer. It is recommended that an access panel be installed in the ceiling to allow future access. ➀ Attach Plenum panels to projector lift (see above drawing). ➁ Attach assembly to overhead structure. Allow clearance between plenum top and structure for ease of future access. ➂ Knock-outs are provided on the front and back plenum panels to allow cables in and out of plenum housing. Copyright ©2006 Draper Inc. Form PhantomPlenum_Inst06 1 2 3 5 4 Plenum 5 Knock-out 6 for cable entry 7 8 9 10 11 12 13 Item Quantity Description 1 2 3 4 5 6 7 8 9 10 11 12 13 1 1 1 1 2 4 16 16 2 1 24 12 16 Phantom Phantom plenum (individual pieces below) Lower Front Plenum Panel Lower Rear Plenum Panel End Plenum Panel 5/16"-18 Zinc Threaded Rod Zinc Flat Washer 5/16"-18 Zinc Hex Nut Side Plenum Panel Top Plenum Panel #8-32 x.375 Zinc Hex Head Screw/Washer #10-32 x.375 Zinc Hex Head Screw/Washer #8-32 Zinc Keps Nut Printed in U.S.A. If you encounter any difficulties installing your Phantom Plenum Housing, call your dealer or Draper, Inc. in Spiceland, Indiana, 765987-7999, fax 765-987-7142, or E-mail [email protected].