Transcript
Clean and Maintenance 1、Keep the tub clean and remove impurities such as hairs to make the drainage unclogged.If there is any dirt on the bub surface ,pls clean it with a piece of soft cloth which applied some toothpaste.
K022 INSTALLATION MANUAL
2、 General neutral liquid detergent and soft cloth can be used for the daily cleaning of the infrared&steam room. Do not use the detergent containing the acetone or ammonia spirit. 3、Never wipe the gilded or chrome-plated pieces with any rough tool with a rough surface but fluey cloth . 4、If there is any sticky dirt on the board and column caused by sealing, wipe it off gently with a piece of soft cloth soaked with some detergent. Never hit or scrape the tub surface with a blunt object or a cutting tool. 5、Use 1200# waterproof abrasive paper dipped in water to grind the scratch on the room surface, then with 2000# , polish it after that with a piece of soft cloth applied some toothpaste. 6、Pls open the door of this cabine for airiness that can avoid steam or water stay in it over a long period of time which will cause mildew or peculiar smell.
Troubleshooting Problem
No supply
Reasons
1.Poor connection of power wire 1. Check and make the connection well 2.Power failure 2.switch on power of leakage switch 3.Renew fuse ware 3. Fuse ware off 1. Damage of the heater of the
No steam
steam generator 2 No water supply. 3.Damage thermal protection switch or temperature detector
Tub seeper
Pipe leaks
No top light No infrared light
Remedy
Block the drainer 1.Sealed loop is not good 2.Poor connection of water pipe 3.Damage the water pipe
1.Check and replace heater 2.Check the intake solenoid valve, cold/ hot water valve and water supply pipeline 3.Check and replace
Clean up the drainer
1.Replace sealed loop 2.Connect the pipe well 3Replace water pipe
1.Not connect well the top lamp 2 . Damage the lamp pipe
1.Connect the lamp well 2 . Replace lamp pipe
Damage of infrared heater
Replace infrared heater
INFRARED & STEAM CABIN SERIES
Appearance drawings
Function Instruction 1.Function (1).Infrared Function (3).Ventilation Fan (5).Multi-color lamp
9 (2).Steam Function (4).Time and temperature adjust (6).Radio/MP3
10
1 2
11
2.Operate manual
12 3
(1).Power on/Power off Power on:Press any key of the control panel under the power condition Power off:Press about 2 seconds
4
13
Below operation must be under power on condition: (2).Infrared function: Press to turn on infrared function.Press again to turn off it.When the temperature inside the cabin reach to the setted temperature,the system will automatismed turn off.
14
(3).Steam function: Press to turn on steam function.Press again to turn off it.When the temperature inside the cabin reach to the setted temperature,the system will automatismed turn off. when the temperature insied cabin 3℃ lower than the setted temperature,the system will automatismed turn on it. Remark:the steam and infrared can not turn on at the same time. (4). Ventilation fan: Press to turn on the fan.Press
5 15
6 16
again to turn off it.
(5). Time/Temperature setting: Press key one time,then the key of will be twinkling,then press or adjust the time,the scale is between 10~99 minutes.Press again,the key of twinkling,press or to adjust the temperature,the scale is between 35~60℃.
to
17
will be
(6).FM/CD/MP3 function: 6.1 FM/CD/MP3 play: Press on turn,the function is FM play,CD play,MP3 play.When play CD or Mp3, press can switch between play and pause.
7
18 6.2 FM frequency/CD,MP3 select/volume: FM frequency:when play radio,the system will automatism enter into the frequency last time you listened.Press then the key of will be twinkling,then press or ,the frequency will increase or reduce 0.1MHz each time.Press or about 2 seconds,the system will search the frequency automatismed.The scale of frequency is between87.5--108MHz. CD/MP3 select:When play CD or MP3,press then the key of will be twinkling,then press or to play the previous song or next song. Volume adjust:when play FM/CD/MP3,press till the key of twinkling then press or to increase or reduce the volume.The setted volume is 12dB,the biggest volume is 16dB. When you adjust the volume,then the dB will be shown on the screen.Turn on the radio, then Mhz will be shown.Turn on Mp3 or CD,the? or? will be shown. (7).Multi-color lamp Press on turn , the color will be switch from red / green / blue / white / turn off。 (8)Ozone sterilization(option): After shutdown the system, it will open the ozone function automatically for 15minutesf working. (9 ). The system has the self - check function , if there ' s problem , it will be showed : E1: means the temperature explorer is with problem E2: means there ' s no water in the steam generator
12 22
8
NO
Material
Q t y NO
Material
Qty
1
Fan
1
10
Top shower
1
2
Top cover
1
11
Handle shower
1
3
Back column
2
12
Shower head holder
1
4
Shelf
1 12
13
Control panel
1
5
Front column
2
14
Valve
1
6
Handle
2
15
Small massage jets
8
7
Steam nozzle
1
16
Shower holder
1
8
Tray
1
17
Shower hose
1
9
Speaker
1
18
Seat
1
22
1
Electronic drawing
Installation drawing Step2
2
Power supply Leakage Power Switch
2-4
1
2-3 3
13.5
Contro lling
Steam line
Heat 2
1800W
Data control line 1
Fan DC12V/3.6W
Steam Generator AC230V/3000W
Color Light DC12V/10W
Dat a cont r ol l i ne 2
Ground
4
Heat 4
Power Box
2 -2
Heat 1
AC230V/50Hz 3040W/1840W 13.6 A IPX4 I KY0210CA
Heat 3
Input Vo ltage: Rated Power: rated Cur rent : Water Proof Grade: Safety Grade: Model:
2- 1 5
6
Temperature probe head
CD Note:
Speaker 8Ω/10W
(1) Plastic seal ( material②) and glass should be installed by the center while both terminals between glass margin is about 13.5mm . (2) Plastic seal (material③) LR 001-3.4 for fixing side glasses, LR001-2.3 for fixing these back board glasses. (3).When installing plastic seal LR001 - 3 . 4 /2.3( Material3 ) ,please insert it (about 5 0 0 - 1 000MM) in the upper part` s glass gas to fix this glass, then place the whole piece plastic seal in the glass gas when adjusting moveable door well
USB Control Box
Antenna
No 1 2
Material
Fixed glass Plastic sealBF005-06
3 Plastic sealLR 001-3.4/ LR001-2.3
10 3 22
Material
No. 4
Screw ST4*18
5
Column
6
LCZ-0 01column cushion 3
water and power Installation
Installation drawings Step4
Power switch
Cold water switch Hot water switch
46 - 1
4-2
4-3
4- 4
Power connection box 32A
13.5
2150
CD Socket
1 2
1
3 4
6
5
6-5 4 1
A Hot water
180
A B
C
1200 800
B Cold water
20
0
72
900
D
Steam room position
5 7
6-6 4 1
Drainage area (shadow circle area)
8
4-7
1450 � �
Ichnography �
Tridimensional
A. Hot water: G1/2 galvanization pipe, height 800mm B. Cold water: G1/2 galvanization pipe, height 800mm C. Power: 230V/50Hz, Single-phase three-wire system, Load capacity not less than32A,height1200mm. D. Drainage:the drain hole should be placed by the center of the tray ,with radii100~200mm in the shadow area of the circle.( Φ60 drain hole) NOTE: ( 1)When turned on steam, please make sure there is enough cold water, otherwise it will damage the steam generater. (2)Power and water source should be controlled by independent switches which should be in a place with esay installed and operated. (3)Please turn off water and electricity supplies after using.
8 22
No.
Material
No. 5
2
Crosse screwST4*18 Fixed shelf
3
Back glass
7
4
Plastic sealBF005-06
8
1
6
Material Back barrier Plastic sealLR001-3.4 Heater barrier Handle
5
Water and electricity parameters
Installation drawings Step5
5-1
Technic parameters
4-6
4-5
5
5-2
Model
Rate voltage
Rate Frequency
Power(Steam /Infrared)
Dimension
K022
230V
50H Z /6 0H Z
3KW/1 .8KW
1 45 0 *900 *21 50
Le n fro ft
3
n um
2
ol tc
6
1
Small massage jets
4
R ht ig fro
4-3
nt Le k ac
n um
b ft
l co
4-3
l co n um
Top shower
R ig ht ck ba l co
1
n um
1
7
Small massage jets
Cold water
Hot water
Hand shower
1 Left cooling pipe
2
Water direction
8
9
10
Small massage jets
Water inlet
Steam generator
4-8
Right cooling pipe
3
Water outlet
No
Material
No.
Material
1 Hinge2#
6
Shower hose
2 Crossed screwM4*18
7
Elevating lever
3 Shelf1#
8
Seat
4 Part of shelf1#
9 Crossed screwST4*3 5
5
6
Activity shower1#
Steam outlet
Note:Head joints of pipes are all with plastic seals.
Connect drainage
10 Stainless steel frame of seat
7
Instruction
Installation drawings 3-2 3-6
1
1. Switch valve operate manual
Step3 2
A.Hot/cool water valve:
3
Lift the handle of the valve: Circumrotate it deasic,switch on hot water Circumrotate it anticlockwise,switch on cool water Control the angle of the handle,you can adjust the
Function va l v e
temperature of water
3-1
Hot/ Cool w a t e r va l v e
2 - 54 3 4
S w i t c h va l v e
3-4 5 Tridimensional shower
Top shower
6
3-3
Hand shower
7 8
Massage jets
F u n c t i o n va l v e
2. How to use steam outlet: Open the cover of outlet,put the spice or herbal medicine,then close the cover,and then turn on steam function.After steam shower, you should dropt the water inside the outlet.
Steam outlet Note: When installing 3-2 and 3-5, pls adjust distance pbetweenlastic seals and activity glass doors or column and top cover to meet the best sealed state for these doors.
3.How to use hand shower: Circumrotate the handle,two kind of water outlet you can choice.
No. 1
Material Plastic seal BF 002-06- 12
No. 5
Material Activity glass door
2 Crossed screwST4*18
6
Plastic seal BF010-06-18.8
3
Column
7
4
Magnetic sealBC001-06
8
Crossed screwST4*18 Rotated axes Holder
4
S ty l e o f w a t e r o u t l e t
9
Instruction
Installation drawings 1 -6
Step 1 1
2
1 -5
G
A 3
B H
13.5
C I
1-4 4
D
J
E
K
F
L
1-3
5
1-2
1
4
2
3
4
5
6
Key 6
5~10mm
1-1
Note:
( 1).In step1-1, pls adjust the foot to meet the heigh 5-10mm between the tray and floor.Adjust the tray to a level state. (2).Plastic seal(materiel 1)and glass should be installed in the center with about 13.5mm to both ends of the glass (3).When installing plastic seal LR001 - 3 . 4 /2.3( Material3 ) ,please insert it ( about 5 00-1 0 0 0 MM) in the upper part` s glass gas to fix this glass, then place the whole piece plastic seal in the glass gas when adjusting moveable door well
NO
Material
NO
Material
1
Plastic seal BF005-06
4 Crossed and stainless steel screwST4 * 1 8
2
Plastic seal LR 001-3.4 Back board glass
5 Cushion LCP-001
3
2
6
7
8
9
10
Screen
1
Infrared key
A
Temperature
2
Steam on/off
B
FM frequency
Top cover
C
MP3
3 4
Fan
5
Works ,temperature and frequency
D
Mp3 musics
E
MP3 t ime for music
+Key
F
Time setting
6
-key
G
Volume and time show
7
MP3/CD/FM
8
Menu/ setting
H
Volume
I
Time
and current music
J
FM frequency and MP3 setting
FMadjust and MP3setting
9
MP3play/ pause
K
10
Power on/off
L
+ Key
Fixed shelf
11
Important preventive measures
Content Dear users, Thanks for purchasing our sanitary ware. In order to use these products safety and effectively, please read this Installation and operation manual carefully before use. This manual is for
1、
Dangerous:Means high voltage
2、
Alarm:Means there's the most important operation instruction.
【Warning】 1.In order to avoid fire or electricity shock,pls don't make the controller into water or in a wet place.There are high voltage parts inside which is dangerous that
reference only. We reserve the right to modify and change the
don't open its`cover .And the person who repair it must be professional and skillful.
relevant parameters,increase or decrease the sizes, models and configurations of these products. In case of any problem, please
2.Temperature is high in the steam generator while these metals are wet that pls don`t touch the controller until turn off the power and heater at least for 30 minutes. 3.If changing the controller without any permission of manufacture or dealer, it will bring you much inconvenience. 4.Please don't touch the heater protective shelf until turn off at least 10 minutes otherwise would be scald. 5.Please don't turn on the shower or wet these heaters by lots of water when infrared is
call the dealer.
Appearance drawings
1
Installation drawings
2-6
Technical parameters and drawings
7
Water and electricity installation drawings
8
Electricity drawings
9
Instruction
10-12
Important preventive measures
13
Maintenance/troubleshooting
14
working. 6.Pls don`t use the infrared sauna If you feel sickness or uncomfortable,especially people who suffering from heart disease or hypertension and so on . 7. Any child or person with mental disability must use this product with the company of a normal adult. 8.Please don't put any things which are easy cause fire (eg.towel ) near heaters.
【Notice】 1.Please put off the power plug from the socket if not use it for a long time. 2.Please make sure wires and socket are all connected well before turning on the power. 3. These products are with environmentally friendly natural paint.At the begaining use, there may be some mell of the paint which is normal .After using a period of time, it will eliminate the smell.( about 20 days). And we suggest to open activity doors so as to maintain ventilation.10 1.In order to extend the life of the product,it must be at least 30 seconds between turn on or off. 2.Please turn off the power after use. 3.Please take attention to rated voltage,if not match that can`t be used,even burn out the controllers . 4.When installing,please take attention to load parameters,if not match that can`t be used even burn out the controllers . 5.Accidental shut down,please re-start it that will be ok 6.Pls put baby to the suitable seat to avoid infrared`s shining at its` head. 7.Set the temperature as you like and don`t touch the heater once it works when enjoying infrared sauna. 8.If any uncomfortable, pls shut off the power.
【Note】 1.External FM frequency should be not too strong,otherwise the speaker maybe burn out. 2.Users must add an air switch or leakage switch at least 32A or accord ing to the national standars. 3.The power socket switch must be groundedreliably and so does the steam generator
22
.