Preview only show first 10 pages with watermark. For full document please download

Laser Projection Keyboard Kit Quick Assembly Manual

   EMBED


Share

Transcript

Laser Projection Keyboard Kit Quick Assembly Manual RoboPeak Team 2013-4 Revision: 0 Your laser projection keyboard kit needs to be assembled before you can use it. This manual will provide you the instructions to assemble the RoboPeak laser project keyboard kit quickly and easily. 1 / 10 Parts List in the kit <需要图片:套件包装盒打开效果照> The following parts are included in the laser projection keyboard kit. Please pay attention to the Item No. in the list. The item No. will be used to identify which part will be used in the following assembly instructions. 1 Side Frame x2 2 Front Panel x1 Bottom Base 3 Camera Dock x2 4 x1 Pattern Projector 5 Linear Laser 6 Dock x1 Locker x1 Infrared Light 7 Nylon column x2 8 Camera x1 Keyboard Pattern 9 10 Projector x1 2 / 10 Linear Laser x1 Power & Sockets 11 Camera Signal 12 PCB x1 Cable x1 Self-tapping 13 Screw Cap x8 14 Screw x2 15 Screw pad x4 16 5mm Screw x4 17 10mm Screwx4 18 12mm Screw x7 19 16mm Screw x6 3 / 10 STEP#1 Base Frame Assembly 1 ,○ 2 ,○ 3 and the screws with No. ○ 19 Please prepare the base frame units with the item No. ○ 13 . Please assemble them based on the following figures. and the screw cap ○ 3 . Pay attention to the side of the camera dock ○ 1 1 3 13+19 13+19 2 4 / 10 1 x2 2 x1 3 x1 13 x6 19 x6 STEP#2 Bottom Base Installations 4 in the bottom of the assembled frame and use the screw ○ 16 to fix it. Place the bottom base ○ 4 x1 18 x4 4 18 18 18 4 18 5 / 10 STEP#3 Mounting the Keyboard Pattern Projector 9 to the dock ○ 5 and use the self-tapping screw ○ 14 to Mount the keyboard pattern projector ○ fix them. 14 5 x1 9 x1 14 x2 9 9 5 5 Place the assembled projector parts to the base frame as depicted in the following figure. Use 18 and the screw cap ○ 13 to fix them. Make the power cable of the projector go the screw ○ through the hole of the front panel. 18 18 13 6 / 10 13 13 x2 18 x2 STEP#4 Mounting the Infrared Light Camera 7 on the camera ○ 8 with the screws ○ 16 : Fix the Nylon column ○ 8 7 7 16 7 7 x2 8 x1 16 x2 7 8 17 : Mount the camera to the base frame using screw ○ 17 x2 17 17 7 / 10 STEP#5 Linear Laser Installations 17 to the bottom base as shown in the following figures. Place the locker Install the linear laser ○ 6 on the laser and use the screws ○ 6 to fix them. Insert the screw ○ 18 on the top of the locker ○ 6 , but do not tighten it currently. ○ 18 6 10 16 6 x1 10 x1 16 x2 18 x1 Check the linear laser in front of the front frame. Please make sure the wavy stripe in the linear 18 can be tightened. laser head is perpendicular to horizontal plane. After that, the screw ○ 8 / 10 STEP#6 PCB Installations and connecting the cables 15 on the screw holes of the bottom base: Place the screw pads ○ 15 15 x2 15 11 on the bottom base and use the screws ○ 18 to fix them. Connect all the cables. Place the PCB ○ 12 18 11 x1 12 x1 18 x2 18 11 8 to the PCB using the signal cable ○ 12 : Don’t forget to connect the camera ○ 9 / 10 Finished! Now your laser projector kit is ready to work. Before the first use, please follow the instructions of the calibration manual. 10 / 10