Preview only show first 10 pages with watermark. For full document please download

Mfs5000si Qsg Back

   EMBED


Share

Transcript

Side 2 8 9 Second Processor Air Baffle Modification Install Processor Air Duct Front Panel Connectors and Indicators To Configure Processor Air Baffle for Two Processors: Note: This step only applies if your system has two processors. If only one processor is installed, leave the air baffle in place and proceed to Step 9. I Second Processor Air Baffle ... remove only if system has two processors. CAUTION: For a one-processor configuration, the air baffle must remain in place to ensure proper cooling. A H Install processor air duct as shown. A A. USB Ports B. Video Port C. I/O 1 and I/O 2 Activity LEDs A Remove air baffle by rocking back and forth until it breaks off. 1 I/O B C D E F G D. NIC1 and NIC2 Activity LEDs E. Disk Activity LED F. ID LED G. Power Button H. Fault LED I. Power LED 2 1 2 ID Component Layout Install Mezzanine Card Midplane Power Connector Hold mezzanine card by its edges and remove from packaging. Remove protective connector cover from mezzanine card. C With a 1/4-inch nut driver, install the four standoffs that shipped with the mezzanine card in the same holes that were just vacated by the screws. BIOS Bank Select 3 2 Default BOOT FROM EMERGENCY BIOS IMAGE With a Phillips* screwdriver, remove the four screws on the server board. Mezzanine Card Connector J3A3 SAS Controller PASSWORD CLR I/O DIMM D2 DIMM D1 DIMM C1 J4A1 1 DIMM C2 CLEAR PASSWORD 3 DIMM B1 Default 2 DIMM B2 B B C DIMM A1 A Midplane Signal Connector DIMM A2 10 2 1 2 11 I/O I/O 22 ID 11 22 BMC Force Update IDID 2 3 Enabled Default Disabled D E Position mezzanine card above mezzanine card socket and align the four holes with standoffs. Carefully press mezzanine card into place until it is fully seated in the socket and resting on the standoff supports. Intel® 6321ESB I/O Controller Hub J7A1 Secure mezzanine card to standoffs with the four screws previously removed. Intel® 5000P Memory Controller Hub (MCH) CMOS CLR E 3 2 D Battery CLEAR Default CMOS J1F2 1 1 I/O 2 I/O CPU 1 Socket CPU 2 Socket 2 1 2 1 2 ID ID CPU Voltage Regulator USB1 11 Install Top Cover Align top cover over corresponding notches in module chassis. Slide top cover forward to close. See your Intel® Compute Module MFS5000SI User Guide for expanded component and connection information. Diagnostic LED Information LED Name Power LED Fault LED 1 I/O 2 1 2 Function Color Identifies power state of system Green Off = Power off On = Power on Slow blink = Standby or sleep mode Amber Off = No fault On = Critical error or non-recoverable Slow blink = Non-critical Fast blink = Locate Double blink = Degraded state Identifies fault warning ID LED Identifies server compute module Indicator Blue Use Intel® Modular Server Control UI to turn ID LED on or off Drive Activity LED Indicates drive activity Green Off = No drive activity Blink = Drive activity NIC1-NIC2 Activity LEDs Indicates network activity and link Green Off = No link On = Link established Blink = Activity I/O 1 and I/O 2 Activity LEDs Indicates network activity and link of NICs on mezzanine card Green Off = No link On = Link established Blink = Activity ID Optional Accessories and Order Codes Dual Gigabit Ethernet I/O Expansion Mezzanine Card AXXGBIOMEZ A complete list of accessories and spares can be found at: www.intel.com/go/serverbuilder USB2 Video Drive ID I/O 1 NIC1 Activity LED LED LED Power I/O 2 NIC2 LED Button LED LED Power/Fault LEDs