Preview only show first 10 pages with watermark. For full document please download

Our Lady Of Perpetual Help Fellowship Hall Addition

   EMBED


Share

Transcript

AMERICAN W/DISABILITIES ACT APPROXIMATE ARCHITECT, ARCHITECTURAL AVERAGE BRAKE HORSEPOWER BUILDING AUTOMATION SYSTEM BRITISH THERMAL UNIT BTU PER HOUR CUBIC FEET PER MINUTE CONTRACTOR FURNISHED OWNER INSTALL CARBON MONOXIDE CARBON DIOXIDE CUBIC FEET CUBIC INCHES DECIBEL DRY BULB (AIR) DIRECT DIGITAL CONTROL DEGREE DAMPER DOWN DIFFERENTIAL PRESSURE SENSOR DRAIN WASTE AND VENT EACH ENTERING AIR TEMPERATURE ENTERING GLYCOL TEMPERATURE ELECTRICAL EXTERNAL STATIC PRESSURE ENTERING WATER TEMPERATURE FAHRENHEIT FIRE DEPARTMENT CONNECTION FEET PER MINUTE FEET PER SECOND FIXTURE UNIT GALLON GALVANIZED GALLON PER HOUR GALLON PER MINUTE HIGH EFFICIENCY PARTICULATE ARREST (FILTER) HORSEPOWER (ELEC.) HERTZ (ELEC.) INDOOR AIR QUALITY INCH, WATER COLUMN KILOWATT KILOWATT HOUR LEAVING AIR TEMPERATURE POUND LEAVING GLYCOL TEMPERATURE LEAVING WATER TEMPERATURE MIXED AIR TEMPERATURE MAXIMUM 1,000 BTU PER HOUR MECHANICAL MINIMUM MISCELLANEOUS 1,000,000 BTU PER HOUR NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN NOT TO SCALE OUTSIDE AIR TEMPERATURE OWNER FURNISHED CONTRACTOR INSTALL OWNER FURNISHED OWNER INSTALL PRESSURE DROP PROPYLENE GLYCOL PHASE (ELEC) PRESSURE POUND PER SQUARE INCH PSI ABSOLUTE PSI GAUGE RELATIVE HUMIDITY REVOLUTION PER MINUTE SECOND STAINLESS STEEL TEMPERATURE TYPICAL UNLESS OTHERWISE NOTED VOLT (ELEC.) VELOCITY VARIABLE FREQUENCY DRIVE WITH WITHOUT WET BULB TYPICAL PIPING SYMBOL XXXX NOTE: "XXXX" DENOTES SYSTEM ACCORDING TO PIPING SYSTEM SYMBOL LIST. GRAPHIC LINE TYPE AND LINE WEIGHT MAY VARY. SINGLE-LINE SYMBOL SHOWN. WHERE DOUBLE-LINE PIPING IS DRAWN, CONSULT ADDITIONAL DRAWING NOTES FOR PIPING AND SYSTEM INFORMATION. BUILDING DOMESTIC WATER SYSTEM : CW CW(NP) HW HWC RL V W DOMESTIC COLD WATER COLD WATER (NON-POTABLE) DOMESTIC HOT WATER DOMESTIC HOT WATER CIRCULATION RAIN LEADER SANITARY VENT SANITARY WASTE FUEL GAS SYSTEMS G FOR FOS NATURAL GAS FUEL OIL RETURN FUEL OIL SUPPLY PIPE SIZE 1/2" CHR CHS HWR HWS GHR GHS TOTAL BUILDING SEWER SERVICE LOAD: BUILDING SEWER SERVICE ENTRANCE SIZE: PIPING COMPONENTS AND ASSEMBLIES FD RD ORD ABBREV. VTR DESCRIPTION PIPE UP PIPE DOWN PIPE TEE UP PIPE TEE DOWN FIXTURE CONNECTIONS/STOPS FLOOR DRAIN ROOF DRAIN OVERFLOW ROOF DRAIN CLEANOUT, PIPE END PLUG CLEANOUT, WALL, CONCEALED CLEANOUT, FLOOR CLEANOUT, YARD W/CONCRETE COLLAR WATER HAMMER ARRESTOR (# DENOTES FIXTURE UNIT LOAD) AUTOMATIC AIR VENT W/SHUT-OFF VALVE(NOT SHOWN) MANUAL AIR VENT W/SHUT-OFF VALVE(NOT SHOWN) VENT THROUGH ROOF TP TRAP PRIMER, AUTOMATIC FD RD ORD CO WCO FCO YCO (#) WHA AAV AAV MAV MAV VTR TP TP BLV FCV GATE VALVE BALL VALVE CHECK VALVE NON-SLAM CHECK VALVE STRAINER, IN-LINE W/HOSE-END DRAIN DRAIN VALVE W/HOSE END BALANCING VALVE FLOW CONTROL VALVE MOV CONTROL VALVE, 2-WAY 3MV CONTROL VALVE, 3-WAY MIXING 3DV CONTROL VALVE, 3-WAY DIVERTING NS ST - INTERNATIONAL CODE COUNCIL (ICC) SERIES MODEL CODES, 2009 ED., AS ADOPTED INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS (IAPMO), UNIFORM PLUMBING CODE (UPC), 2009 ED. STATE OF ALASKA CODE AMMENDMENTS. LOCAL AUTHORITY HAVING JURISDICTION (AHJ) REQUIREMENTS AS APPLICABLE. 63 FIXTURE UNITS 4 INCH THE SIZING OF THE BUILDING SANITARY DRAIN, WASTE, AND VENT PIPING SYSTEMS SHALL CONFORM TO UNIFORM PLUMBING CODE, 2009 ED., CHAPTER 7, PIPE SIZE FIXTURE UNIT LOAD DRAIN, VERTICAL/HORIZONTAL 2/1 16 / 8 32 / 14 48 / 35 256 / 216 VENT 8 24 48 84 256 FUEL GAS PIPING SYSTEM CHILLED WATER RETURN CHILLED WATER SUPPLY HEATING WATER RETURN HEATING WATER SUPPLY GLYCOL HEATING RETURN GLYCOL HEATING SUPPLY SYMBOL FIXTURE UNIT LOAD FIXTURE CONNECTION ONLY 9 20 38 80 217 APPLICABLE CODES AND STANDARDS: DRAIN, WASTE, AND VENT SYSTEMS FIRE PROTECTION PIPING FIRE DEPARTMENT CONNECTION HYDRONIC SYSTEMS 161.5 FIXTURE UNITS 30-45 PSI (MINIMUM) 2 INCH 200 FEET THE SIZING OF THE DOMESTIC WATER PIPING SYSTEM SHALL CONFORM TO UNIFORM PLUMING CODE, 2009 ED., SECTION 610.8, FIRE PROTECTION SYSTEMS SP FDC GENERAL MECHANICAL AND PLUMBING CODE COMPLIANCE INFORMATION TOTAL BUILDING WATER SERVICE LOAD: BUILDING WATER SERVICE PRESSURE: BUILDING WATER SERVICE ENTRANCE: DESIGN SYSTEM LENGTH (UPC, TABLE 6-6): PLUMBING SYSTEMS GENERAL MECHANICAL INFORMATION TOTAL BUILDING GAS LOAD: GAS TYPE: APPLIANCE GAS SERVICE PRESSURE: DESIGN SYSTEM PRESSURE DROP: DESIGN PIPE LENGTH: 1280 CUBIC FEET PER HOUR (THIS ADDITION) NATURAL GAS LESS THAN 2 PSI PER TABLE 402.4(1) 0.3 INCH W.C. PER TABLE 402.4(1) 173 FEET THE SIZING OF THE BUILDING FUEL GAS PIPING SHALL CONFORM TO INTERNATIONAL FUEL GAS CODE (IFGC), 2009 ED., CHAPTER 4, PIPE SIZE: 1" 3" GAS CAPACITY(CUBIC FEET PER HOUR): 58 109 224 336 648 1,030 1,860 HEATING GENERATION SYSTEMS DESIGN CONDITION (WINTER/SUMMER): WINTER DESIGN OUTDOOR AMBIENT: SUMMER DESIGN OUTDOOR AMBIENT: ASHRAE 99.6% / 1% -22.3 DEGREES F DRY BULB 66.3 DEGREES F DRY BULB / 55.9 DEGREES F WET BULB HYDRONIC PIPING SYSTEMS MAXIMUM FLUID VELOCITY: HYDRONIC FLUID: 5 FEET PER SECOND HOT WATER (EXISTING. CONTRACTOR TO FIELD VERIFY) VENTILATION SYSTEMS MECHANICAL VENTILATION SHALL CONFORM TO THE REQUIREMENTS OF INTERNATIONAL MECHANICAL CODE, 2009 ED., SECTION 403 AND THE CURRENT EDITION OF AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR-CONDITIONING ENGINEERS (ASHRAE) STANDARD 62.1, VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY. AIR-HANDLING SYSTEM ANALYSIS (EACH AIR-HANDLING UNIT): AIR-HANDLING UNIT HEATING CAPACITY: DESIGN UNIT SUPPLY AIR CAPACITY: MAXIMUM UNIT OUTSIDE AIR CAPACITY: MINIMAL MIXED AIR TEMPERATURE: PERCENT OUTSIDE AIR: MAXIMUM OCCUPANT LOAD: 150 / 120 MBH (UNIT INPUT / OUTPUT) 2400 CFM 927 CFM 32.2 DEG F (BASED ON 92.6 DEG F SAT) 38% 228 PEOPLE (FELLOWSHIP HALL) 3MV C NO NC Revisions: 3DV NC NO C UNION CONNECTION FLANGE CONNECTION FLEXIBLE JOINT PIPE ANCHOR PIPE ALIGNMENT GUIDE PIPING SEISMIC FLEXIBLE JOINT PIPE EXPANSION COMPENSATOR ADDITIONAL ABBREVIATIONS NOTED BY EQUIPMENT TAGS, SYSTEM SYMBOLS, AND ACRONYMS GENERALLY ACCEPTED BY THE INDUSTRY SHALL BE APPLICABLE. GRAPHIC REFERENCES AFF BOD BOP CL ELEV. FFL INV. TOD TOP OC ABOVE FINISHED FLOOR BOTTOM OF DUCT BOTTOM OF PIPE CENTER LINE ELEVATION FINISHED FLOOR LEVEL INVERT TOP OF DUCT TOP OF PIPE ON CENTER POINT OF CONNECTION POINT OF DISCONNECTION DUCTWORK AND ACCESSORIES E/A O/A R/A S/A T/A FD FSD BD BDD EXHAUST AIR OUTSIDE AIR RETURN AIR SUPPLY AIR TRANSFER AIR FIRE DAMPER FIRE-SMOKE DAMPER BALANCING DAMPER BACK DRAFT DAMPER Date: Drawn: Checked: Project: File Name: Sheet Title: Sheet: M1.0 of SOLDOTNA, ALASKA ADA APPROX. ARCH AVG. BHP BMS BTU BTUH CFM CFOI CO CO2 CU.FT. CU.IN. dB DB DDC DEG. DMPR DN DPS DWV EA. EAT EGT ELEC ESP EWT F FDC FPM FPS FU GAL GALV. GPH GPM HEPA HP Hz IAQ IN.W.C. KW KWH LAT LB LGT LWT MAT MAX MBH MECH MIN. MISC. MMBH NC NIC NO NTS OAT OFCI OFOI PD PG PH PRES PSI PSIA PSIG RH RPM SEC. SSTL TEMP. TYP. UON V VEL. VFD W/ W/O WB MECHANICAL DESIGN PARAMETERS PIPING SYSTEM REFERENCES ROMAN CATHOLIC CHURCH GENERAL ABBREVIATIONS FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP MECHANICAL LEGEND AND ABBREVIATIONS PLUMBING FIXTURE SCHEDULE RTU-1 RTU-2 AIR-HANDLING UNIT - PACKAGED OUTDOOR AIR-HANDLING UNIT (ROOF-TOP CONFIGURATION) WITH GAS-FIRED HEATING AND DX COOLING, ECONOMIZER CONTROL, AND DEMAND CONTROL VENTILATION CARBON DIOXIDE SENSOR, AND INTEGRAL POWERED EXHAUST MODULE. PERFORMANCE: 2400 CFM (NOMINAL, 1.0 INCH W.C. ESP), 150 MBH INPUT/120MBH OUTPUT, 5-TON AIR-CONDITIONING CAPACITY (NOMINAL), 2-HP SUPPLY FAN MOTOR, 1/3-HP POWER EXHAUST FAN MOTOR. ELECTRICAL: 46.0 AMP MCA, (70 AMP BREAKER) 230V/1PH/60HZ BASIS OF DESIGN: LENNOX ENERGENCE SERIES MODEL LGH060H4BH3P MAU-1 MAKE-UP AIR UNIT PACKAGED VERTICAL, DIRECT GAS-FIRED MAKE-UP AIR UNIT. CONFIGURATION: FAN SECTION, GAS HEATING SECTION, AND FILTER MODULE. BOTTOM INLET AND TOP/FRONT DISCHARGE. PROVIDE INTERLOCK WITH KITCHEN HOOD SYSTEM (HD-1/KEF-1). PROVIDE INSULATED OUTSIDE AIR PLENUM WITH STRUCTURAL FRAME FOR UNIT SUPPORT. FIXTURE ID: DESCRIPTION AIR INTAKE AND OUTLET SCHEDULE CONNECTIONS CW HW COMMENT / BASIS OF DESIGN W/SD SIDEWALL PLAN - PRICE 500 SERIES 1 SUPPLY CEILING 12"X12" 6" PLAN - - PRICE SPD SERIES 1 SA-3 SUPPLY CEILING 16"X8" 8" PLAN - - PRICE 500 SERIES 1 LAMBERTSON 1400 SERIES WITH DELTA FAUCET SA-4 SUPPLY PERFORATED 24"X24" 6" PLAN 0.025 PRICE PDN, 4-WAY THROW 1 - JUST SL3322-A-GR-3. DELTA 4380 DST FAUCET RA-1 RETURN EGG CRATE 24"X24" 24"X24' PLAN - PRICE 80 SERIES 1 - LAMBERTSON QL-3-1824 SINK WITH FAUCETS COMMENTS: 3" 2" - 2" 1-1/2" 1, 2 AMER. STD WASHBROOK URINAL/SENSOR FLUSH VALVE P-3A LAVATORY (ADA) 1/2" 1/2" 2' 1-1/2" 1 / COUNTER MOUNTED LAVATORY W/ METERING FAUCET P-4 MOP SINK 1/2" 1/2" 2" 1-1/2" FIAT MSB 2424 W/UTILITY FAUCET P-5 HAND WASH SINK 1/2" 1/2" 2" 1-1/2" P-6 FOOD PREP SINK 1/2" 1/2" - P-7 3-COMP. SINK 3/4" 3/4" P-8 PRE-RINSE SINK 1/2" 1/2" 2" 1-1/2" BUILT-IN SSTL COUNTER. PRE-RINSE HOSE ASSEMBLY. P-9 BAR SINK 1/2" 1/2" 2" 1-1/2" PER CONTRACTOR'S SUBMITTAL / SUBJECT TO APPROVAL FS-1 FLOOR SINK - - 2" 1-1/2" PER CONTRACTOR'S SUBMITTAL / SUBJECT TO APPROVAL FD-1 FLOOR DRAIN - - 2" 1-1/2" PER CONTRACTOR'S SUBMITTAL / SUBJECT TO APPROVAL TP-1 TRAP PRIMER 1/2" - - - 3 / PRECISION PLUMBING PRODUCTS PRIME-RITE OR EQ. HB-1 HOSE BIBB 3/4" - - - WOODFORD B65 WITH BOX WHA WATER HAMMER ARRES. - - - - 4 ADA COMPLIANT INSTALLATION. BASIS OF DESIGN: AMERICAN STANDARD AFWALL 1.6 FLUSH VALVE ELONGATED TOILET WITH OPEN FRONT SEAT TO MATCH. SLOAN 110 FLUSH VALVE. AUTOMATIC TRAP PRIMERS WITH DISTRIBUTION UNITS AS REQUIRED. MECHANICAL BELLOW/PISTON TYPE HAMMER ARRESTORS. SIZE AND LOCATE AT ALL FIXTURE SERVICES OR ON BRANCH MAINS LOCATE WHERE ACCESSIBLE FOR SERVICE. AIR CHAMBER NOT ALLOWED. KITCHEN HOOD, TYPE II - BASIS OF DESIGN: GREENHECK MODEL GD2 WH-1A WH-1B WATER HEATER TANKLESS CONDENSING WATER HEATER. ADJUST FOR 140 DEG F OUTLET TEMPERATURE FOR KITCHEN SCULLERY AND DISHWASHING SERVICES ONLY. PERFORMANCE: 199 MBH INPUT, 15.2 MBH - 199 MBH FIRING RANGE, 4.1 GPM CONTINUOUS DRAW AT 90 DEG F TEMPERATURE RISE. ELECTRICAL: 146W (MAX), 120V/1PH/60HZ BASIS OF DESIGN: RINNAI MODEL RU98i CT-1 CONDENSATE TREATMENT TANK FOR WH-1A/B SERVICE. BASIS OF DESIGN: AXIOM MODEL NT-1 ET-1 THERMAL EXPANSION TANK FOR WH-1A/B SERVICE. BASIS OF DESIGN: AMTROL ST-5 GI-1 GREASE INTERCEPTOR NC <20 - WITH INTEGRAL BALANCING DAMPER. FAN SCHEDULE FAN ID: SERVICE FAN DATA ELECTRICAL DATA ESP INCH W.C. 0.75 DRIVE TYPE BELT BASIS OF DESIGN COMMENT KEF-1 EXHAUST FLOW CFM 2137 972 1/2 HP 1725 115 1 60 SEE COMMENT 1 KEF-2 EXHAUST 300 0.25 DIRECT 1725 1/6 HP 1725 115 1 60 SEE COMMENT 2 EF-1 EXHAUST 150 0.25 DIRECT 871 42 W 871 115 1 60 SEE COMMENT 3 RPM HP/W/A RPM VOLT PHASE HZ COMMENTS: 2. 3. DOMESTIC COLD WATER PIPING: DOMESTIC HOT WATER/HOT WATER CIRCULATION PIPING: VENT PIPING IN CONDITIONED CEILING AND ATTIC: GAS PIPING: HYDRONIC PIPING: 1" INSULATION WITH VAPOR BARRIER. 1" FIBERGLASS INSULATION WITH ALL PURPOSE JACKET. 1" FIBERGLASS INSULATION WITH VAPOR BARRIER. NONE. 1" FIBERGLASS INSULATION WITH ALL PURPOSE JACKET. DUCTWORK SYSTEMS: - 3'-0"(L)X3'-0"(W)X2'-0"(H) HOOD DIMENSIONS. 300 CFM, 0.032" W.C. PRESSURE DROP. CONDENSATE BAFFLE. STAINLESS STEEL CONSTRUCTION. CFM BASIS OF DESIGN: GREENHECK MODEL USFG-160-5 WITH ACCESSORIES INCLUDING HINGED CAP/CURB, DRAIN TROUGH, GREASE CUP, CLEAN-OUT PORT, HEAT BAFFLE. UL 762 LISTED FOR RESTAURANT EXHAUST SERVICE. BASIS OF DESIGN: GREENHECK MODEL CUE-070-VG (VARIGREEN ECM MOTOR). BASIS OF DESIGN: PANASONIC FV-20VQ3. PIPING SYSTEMS: - BASIS OF DESIGN: GREENHECK MODEL GHEW HD-2 1. COMMENTS: INSULATION SCHEDULE 9'-6"(L)X4'-0"(W)X2'-0"(H) HOOD DIMENSIONS. APPLIANCE COVERAGE WITH 6" OVERHANG AND 3" BACKING SPACER. 2137 CFM, 0.454" W.C. PRESSURE DROP. GREASE BAFFLE, 3 EACH INTERIOR LIGHTS. UL 710 LISTED. COMMENT SUPPLY - 3/4" 1. PROVIDE UNIT WITH INTEGRATED FIRE SUPPRESSION SYSTEM. FACE SIZE INLET SIZE (INCH) (INCH) 16"X10" 16"X10" BASIS OF DESIGN SA-2 1/2" URINAL ELECTRICAL: 2 HP UNIT FAN, 240V/1PH/60HZ KITCHEN HOOD, TYPE I NOMINAL PERFORMANCE SA-1 WATER CLOSET/ (ADA) 1. 2. UNIT DATA SP IN.W.C. - P-2 3. 4. BASIS OF DESIGN: GREENHECK VSU-109-H20 SERVICE TYPE P-1 / P-1A PERFORMANCE: 2100 CFM (AT 0.75 INCH W.C. ESP), 234 MBH INPUT, 215 MBH OUTPUT (-22 DEG F EAT, 70 DEG F LAT). HD-1 ID: V SUPPLY AND RETURN AIR DUCTWORK: OUTSIDE AIR DUCTWORK: EXHAUST DUCTWORK WITHIN 5' OF EXTERIOR WALL: NONE EXCEPT WHERE NOTED. 2" INSULATION WITH VAPOR BARRIER. 2" INSULATION WITH VAPOR BARRIER. TERMINAL HEATING UNIT SCHEDULE EQ ID: SERVICE CAPACITY AIRFLOW EFT MBH CFM LFT FLOW DEG F DEG F GPM ELECTRICAL DATA KW RPM BASIS OF DESIGN COMMENT VOLT PHASE HZ EHU-1 HEATING - - - - - 1.50 - 120 1 60 SEE COMMENT 1 EHU-2 HEATING - - - - - 2.25 - 240 1 60 SEE COMMENT 2 COMMENTS: 1. 2. BASIS OF DESIGN: STIEBEL ELTRON MODEL CK 15E. ELECTRIC WALL HEATER WITH INTEGRAL THERMOSTAT. BASIS OF DESIGN: KING ELECTRIC MODEL PAW 2422 WITH INTEGRAL THERMOSTAT AND WALL MOUNTING CAN. - MOLDED THERMOPLASTIC GREASE INTERCEPTOR WITH FLOW CONTROL VALVE (25 GPM) AND VENT FITTING. UNIT RATED FOR 25 GPM FLOW RATE WITH 50 LB GREASE CAPACITY. Revisions: BASIS OF DESIGN: CANPLAS ENDURA GREASE INTERCEPTOR SIZE 25LO (LOW PROFILE) Date: Drawn: Checked: Project: File Name: Sheet Title: Sheet: M1.1 of SOLDOTNA, ALASKA COMMENTS ROMAN CATHOLIC CHURCH DESCRIPTION FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP EQUIPMENT SCHEDULE EQ. ID MECHANICAL AND PLUMBING SPECIFICATIONS A.G. DRAIN VALVES: DRAIN VALVES SHALL INCLUDE HOSE-END THREADS AT DISCHARGE. D2020 - SANITARY DRAINAGE AND VENT SYSTEMS Z1020 - ADMINISTRATIVE REQUIREMENTS 3. EXECUTION 1. GENERAL REQUIREMENTS 4. EQUIPMENT START-UP SERVICES: PROVIDE EQUIPMENT MANUFACTURER'S QUALIFIED PERSONNEL FOR THE FOLLOWING: START-UP SERVICES BY THE ROOFTOP UNITS KITCHEN VENTILATION SYSTEM MAKE-UP AIR AND EXHAUST SYSTEMS ABOVEGROUND PIPING SYSTEMS: ASTM A 888 OR CISPI 301. COUPLINGS: ASTM C 1277 ASSEMBLY OF METAL HOUSING, CORROSION-RESISTANT FASTENERS, AND ASTM C 564 RUBBER SLEEVE WITH INTEGRAL, CENTER PIPE STOP. A.B. UNDERGROUND PIPING SYSTEMS: HEAVY-DUTY, TYPE 304, STAINLESS-STEEL COUPLINGS: ASTM A 666, TYPE 304, STAINLESS-STEEL SHIELD; STAINLESS-STEEL BANDS; AND SLEEVE. NPS 1-1/2 TO NPS 4: 3-INCH (W) SHIELD WITH BANDS. A.C. NON-METALLIC PIPING SYSTEMS: PLASTIC (ABS) PIPING SYSTEM SHALL BE LIMITED TO NON-PRESSURIZED WASTE AND VENT PIPING ONLY. ABS SOCKET FITTINGS: ASTM D 2661, MADE TO ASTM D 3311 DRAIN, WASTE, AND VENT PATTERNS. B. DRAIN VALVES: PROVIDE DRAIN VALVES TO ALLOW TERMINAL EQUIPMENT SERVICE AND FOR DRAINING SECTIONS OF THE DISTRIBUTION PIPING. C. CLEANING AND FLUSHING OF HYDRONIC PIPING SYSTEMS: CLEAN AND FLUSH HYDRONIC PIPING SYSTEMS AS FOLLOWS, C.A. D. TESTING: TEST THE HYDRONIC SYSTEM AS FOLLOWS, ISOLATE EQUIPMENT DURING TESTING AS APPROPRIATE TO PREVENT DAMAGE. D.B. SUBJECT PIPING SYSTEM TO HYDROSTATIC TEST PRESSURE THAT IS NOT LESS THAN 1.5 TIMES THE SYSTEM'S WORKING PRESSURE. TEST PRESSURE SHALL NOT EXCEED MAXIMUM PRESSURE FOR ANY VESSEL, PUMP, VALVE, OR OTHER COMPONENT IN SYSTEM UNDER TEST. VERIFY THAT STRESS DUE TO PRESSURE AT BOTTOM OF VERTICAL RUNS DOES NOT EXCEED 90 PERCENT OF SPECIFIED MINIMUM YIELD STRENGTH OR 1.7 TIMES THE "SE" VALUE IN APPENDIX A IN ASME B31.9, "BUILDING SERVICES PIPING." D.C. AFTER HYDROSTATIC TEST PRESSURE HAS BEEN APPLIED FOR AT LEAST 10 MINUTES, EXAMINE PIPING, JOINTS, AND CONNECTIONS FOR LEAKAGE. ELIMINATE LEAKS BY TIGHTENING, REPAIRING, OR REPLACING COMPONENTS, AND REPEAT HYDROSTATIC TEST UNTIL N O FURTHER LEAK IS OBSERVED. TESTING: TEST SANITARY DRAINAGE AND VENT PIPING SYSTEMS AS FOLLOWS: A.A. GENERAL TEST PROCEDURE: CLOSE OPENINGS IN PIPING SYSTEM AND FILL WITH WATER TO POINT OF OVERFLOW, BUT NOT LESS THAN 10-FOOT HEAD OF WATER. FROM 15 MINUTES BEFORE INSPECTION STARTS TO COMPLETION OF INSPECTION, WATER LEVEL MUST NOT DROP. INSPECT JOINTS FOR LEAKS AND REPAIR ACCORDINGLY. D3000 - HEATING, VENTILATION, AND AIR-CONDITIONING SYSTEMS 2 (TWO) COPIES 1 (ONE) SESSION 2 (TWO) HOURS PER SESSION 1. GENERAL REQUIREMENTS A. HANGARS AND SUPPORTS: HANGARS AND SUPPORTS SHALL CONFORM TO THE REQUIREMENTS OF APPLICABLE CODES AND STANDARDS. B. SEISMIC AND VIBRATION CONTROLS: PROVIDE SEISMIC AND VIBRATION CONTROLS IN ACCORDANCE WITH THE REQUIREMENTS OF AMERICAN SOCIETY OF CIVIL ENGINEERS, STANDARD 7-10, CHAPTER 13. D2000 - PLUMBING SYSTEMS D3060 - DUCTWORK SYSTEMS 1. GENERAL REQUIREMENTS A. 1. GENERAL REQUIREMENTS A. HANGERS AND SUPPORTS: HANGERS AND SUPPORTS SHALL CONFORM TO THE REQUIREMENTS OF UNIFORM PLUMBING CODE, 2009 ED. SECTION 314. B. SEISMIC AND VIBRATION CONTROLS: PROVIDE SEISMIC AND VIBRATION CONTROLS IN ACCORDANCE WITH THE REQUIREMENTS OF AMERICAN SOCIETY OF CIVIL ENGINEERS, STANDARD 7-10, CHAPTER 13. C. INSULATION: UNLESS OTHERWISE NOTED IN THE INSULATION SCHEDULE, PROVIDE INSULATION ON PIPING SYSTEMS IN ACCORDANCE WITH THE REQUIREMENTS OF INTERNATIONAL ENERGY CONSERVATION CODE, 2009 ED. C. E. IDENTIFICATION: PROVIDE COMMERCIALLY AVAILABLE PIPING AND EQUIPMENT LABELING SYSTEMS. PAINT STENCILING NOT ALLOWED. FIRESTOP AND SEALANT SYSTEMS: PENETRATIONS OF PIPING THROUGH RATED ASSEMBLIES SHALL BE PROTECTED BY LISTED FIRESTOP AND SEALANT SYSTEMS. 2. SUBMITTAL REQUIREMENTS: PROVIDE PRODUCT SUBMITTALS FOR ALL EQUIPMENT IDENTIFIED IN THE DRAWING EQUIPMENT SCHEDULES AND PRODUCTS IDENTIFIED IN THESE SPECIFICATIONS. E. IDENTIFICATION: PROVIDE COMMERCIALLY AVAILABLE PIPING, DUCTWORK, AND EQUIPMENT LABELING SYSTEMS. PAINT STENCILING NOT ALLOWED. FIRESTOP AND SEALANT SYSTEMS: PENETRATIONS OF PIPING AND DUCTWORK THROUGH RATED ASSEMBLIES SHALL BE PROTECTED BY LISTED FIRESTOP AND SEALANT SYSTEMS. 2. SUBMITTAL REQUIREMENTS: PROVIDE PRODUCT SUBMITTALS FOR ALL EQUIPMENT IDENTIFIED IN THE DRAWING EQUIPMENT SCHEDULES AND PRODUCTS IDENTIFIED IN THESE SPECIFICATIONS. THIS SECTION INCLUDES THE DOMESTIC WATER SYSTEMS AND ACCESSORIES.. SHEETMETAL DUCT MATERIAL SHALL BE GALVANIZED SHEET STEEL, LOCK-FORMING QUALITY. COMPLYING WITH ASTM A 653/A 653M AND HAVING G90 COATING DESIGNATION. A.B. FLEXIBLE DUCTS SHALL BE THERMAFLEX SERIES GKM (R4.2) FLEXIBLE DUCT OR EQUAL. B. DUCTWORK SYSTEMS ACCESSORIES: DUCTWORK ACCESSORIES INCLUDING BALANCING DAMPERS, CONTROL DAMPERS, EQUIPMENT FLEXIBLE CONNECTORS, ETC. SHALL CONFORM TO APPLICABLE SMACNA DUCTWORK CONSTRUCTION STANDARDS. 1. GENERAL REQUIREMENTS 3. EXECUTION THIS SECTION INCLUDES THE FUEL GAS SYSTEMS AND ACCESSORIES. A.A. UNDERGROUND FUEL GAS PIPING INSIDE BUILDING NOT ALLOWED UNLESS OTHERWISE DIRECTED. A.B. FUEL GAS PIPING IN VENTILATION SYSTEM PLENUM SHALL BE WELDED THROUGHOUT. 1. GENERAL REQUIREMENTS SPECIAL REQUIREMENTS FOR COMPLIANCE WITH NSF 61: DOMESTIC WATER SYSTEM PIPING AND EQUIPMENT SHALL CONFORM TO THE REQUIREMENTS OF NSF 61 FOR POTABLE WATER SERVICE. DUCTWORK SYSTEMS: A.A. B.A. A. A. DUCTS SHALL CONFORM TO THE REQUIREMENTS OF SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE" FOR ACCEPTABLE MATERIALS, MATERIAL THICKNESS, AND DUCT CONSTRUCTION METHODS. 2. PRODUCTS D3010 - FUEL GAS SYSTEMS D2010 - DOMESTIC WATER SYSTEMS B. THIS SECTION INCLUDES THE DUCTWORK SYSTEMS AND ACCESSORIES. A.A. A. D. D. INSULATION: UNLESS OTHERWISE NOTED IN INSULATION SCHEDULE, PROVIDE INSULATION ON PIPING AND DUCTWORK SYSTEMS IN ACCORDANCE WITH THE REQUIREMENTS OF INTERNATIONAL ENERGY CONSERVATION CODE, 2009 ED. FILL SYSTEM WITH FRESH WATER AND ADD LIQUID ALKALINE COMPOUND WITH EMULSIFYING AGENTS AND DETERGENTS TO REMOVE GREASE AND PETROLEUM PRODUCTS FROM PIPING. CIRCULATE SOLUTION FOR A MINIMUM OF 24 HOURS, DRAIN, CLEAN STRAINER SCREENS, AND REFILL WITH SERVICE HYDRONIC FLUID. D.A. 3. EXECUTION 5. OPERATION AND MAINTENANCE DOCUMENT AND TRAINING: SUBMIT OPERATION AND MAINTENANCE MANUALS FOR THE MECHANICAL EQUIPMENT AND SYSTEMS. PROVIDE TRAINING OF OWNER IN OPERATION AND MAINTENANCE OF BUILDING SYSTEMS: NUMBER OF O&M MANUALS: NUMBER OF SESSION(S): TIME DURATION ANTICIPATED: PROVIDE AIR VENTS AT SYSTEM HIGH POINTS AND AT TERMINAL EQUIPMENT SANITARY WASTE AND VENT PIPING SYSTEMS A.A. A. - AIR VENTS: SERVICES. A. FLEXIBLE DUCT CONNECTORS TO AIR INTAKE AND OUTLET DIFFUSERS: DIFFUSER FLEXIBLE DUCT CONNECTORS LENGTH SHALL BE LIMITED TO MAXIMUM OF 5 FEET WITH NO MORE THAN 90 DEGREES COMBINED CHANGED OF DIRECTION. B. CLEANING: CLEAN DUCTWORK SYSTEMS THROUGHOUT IN PREPARATION FOR LEAKAGE TESTING AND TESTING, ADJUSTING, AND BALANCING. C. TESTING: LEAKAGE TESTS: COMPLY WITH SMACNA'S "HVAC AIR DUCT LEAKAGE TEST MANUAL". 2. PRODUCTS A. FUEL GAS PIPING SYSTEMS: D3090 - TESTING, ADJUSTING, AND BALANCING C. SPECIAL PROVISION FOR STEEL PIPING SYSTEMS: UNLESS OTHERWISE NOTED, STEEL PIPING SYSTEMS SHALL BE LIMITED TO BUILDING WATER SERVICE ENTRANCE D. SPECIAL PROVISION FOR NON-METALLIC PIPING SYSTEMS: UNLESS OTHERWISE NOTED, USE OF NON-METALLIC PIPING SYSTEMS SHALL BE SUBJECT TO APPROVAL BY THE OWNER. A.A. A.B. UNDERGROUND PIPING SYSTEMS (OUTDOOR, DOWNSTREAM OF GAS METER/REGULATOR): STEEL PIPE, ASTM A 53/A 53M, BLACK STEEL, SCHEDULE 40, TYPE E OR S, GRADE B, WROUGHT-STEEL FITTINGS AND WELDED JOINTS. COAT PIPE AND FITTINGS WITH PROTECTIVE COATING FOR STEEL PIPING. A.C. UNDERGROUND PIPING SYSTEMS (OUTDOOR, DOWNSTREAM OF GAS METER/ REGULATOR): ANNEALED OR DRAWN-TEMPER COPPER TUBE WITH WROUGHT-COPPER FITTINGS AND BRAZED JOINTS. COAT PIPE AND FITTINGS WITH PROTECTIVE COATING FOR COPPER TUBING. 2. PRODUCTS A. DOMESTIC WATER PIPING SYSTEMS A.A. ABOVEGROUND PIPING SYSTEMS: HARD COPPER TUBE: ASTM B 88, TYPE L, WATER TUBE, DRAWN TEMPER. COPPER PRESSURE FITTINGS: ASME B16.18, CAST-COPPER ALLOY OR ASME B16.22, WROUGHT-COPPER, SOLDER-JOINTS. A.B. UNDERGROUND PIPING SYSTEMS: SOFT COPPER TUBE: ASTM B 88, TYPE K, WATER TUBE, DRAWN TEMPER. COPPER PRESSURE FITTINGS: ASME B16.18, CAST-COPPER ALLOY OR ASME B16.22, WROUGHT-COPPER, SOLDER-JOINTS. NON-METALLIC PIPING SYSTEMS: POLYETHYLENE CROSS-LINK (PEX-A) PIPING: ASTM F 877, SDR 9 TUBING LISTED FOR POTABLE WATER SERVICES (IDENTIFIED WITH "-PW" MARK AND NSF-61). FITTINGS FOR PEX TUBE: ASTM F 1807, METAL-INSERT TYPE WITH COPPER OR STAINLESS-STEEL CRIMP RINGS AND MATCHING PEX TUBE DIMENSIONS. VALVES: VALVE PRESSURE AND TEMPERATURE RATINGS SHALL MEET THE REQUIRED SERVICE CONDITIONS. THIS SECTION INCLUDES TESTING, ADJUSTING, AND BALANCING OF THE MECHANICAL SYSTEMS. PROVIDE SERVICES OF AN AABC OR NEBB CERTIFIED TESTING, ADJUSTING, AND BALANCING AGENT TO PERFORM THE TESTING, ADJUSTING, AND BALANCING OF THE FOLLOWING SYSTEMS: - WATER HAMMER ARRESTORS: MECHANICAL BELLOW OR PISTON WATER HAMMER ARRESTORS ONLY. AIR CHAMBER NOT ALLOWED. Revisions: FUEL GAS SYSTEM VALVES AND SPECIALTIES: VALVES: VALVE PRESSURE AND TEMPERATURE RATINGS SHALL MEET THE REQUIRED SERVICE CONDITIONS. A. TESTING: TEST, INSPECT, AND PURGE NATURAL GAS ACCORDING TO THE INTERNATIONAL FUEL GAS CODE, SECTION 406, AND APPLICABLE REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION. SUBMIT PRELIMINARY TAB REPORT TO THE OWNER FOR REVIEW AS PART OF THE SUBSTANTIAL COMPLETION PROCESS. SUBMIT FINAL TAB REPORT AFTER THE CORRECTION OF ANY DEFICIENCIES DISCOVERED DURING THE PREPARATION OF THE PRELIMINARY TAB REPORT, IF ANY, AS PART OF THE OPERATION AND MAINTENANCE DOCUMENTATION. D8000 - CONTROLS AND INSTRUMENTATIONS 1. GENERAL REQUIREMENTS D3050 - HYDRONIC SYSTEMS A. B.B. VENTILATION SYSTEMS HYDRONIC SYSTEMS KITCHEN HOOD MAKE-UP AIR AND EXHAUST SYSTEMS 2. PRODUCTS 3. EXECUTION DOMESTIC WATER SYSTEM VALVES AND SPECIALTIES B.A. A. B. 3. EXECUTION A. B. 1. GENERAL REQUIREMENTS NOT USED B. B.A. A.C. ABOVEGROUND PIPING SYSTEMS: STEEL PIPE, ASTM A 53/A 53M, BLACK STEEL, SCHEDULE 40, TYPE E OR S, GRADE B. MALLEABLE-IRON THREADED FITTINGS: ASME B16.3, CLASS 150, STANDARD PATTERN WELDED FITTINGS: ASTM A 234/A 234M FOR BUTT WELDING AND SOCKET WELDING. THIS SECTION INCLUDES REQUIREMENTS FOR THE TESTING, ADJUSTING, AND BALANCING. 1. GENERAL REQUIREMENTS A.A. A. THIS SECTION INCLUDES THE HYDRONIC SYSTEMS AND ACCESSORIES. PROVIDE CONTROL EQUIPMENT AND COMPONENTS NECESSARY TO COMPLETE THE CONTROLS AND MONITORING SYSTEMS AS SHOWN IN THESE DRAWINGS. 3. EXECUTION 2. PRODUCTS A. B. WATER HAMMER ARRESTORS: PROVIDE MECHANICAL WATER HAMMER ARRESTORS WHERE SHOWN IN THE DRAWINGS OR AT INDIVIDUAL FIXTURE SERVICES. CLEANING, DISINFECTING, AND TESTING: CLEAN AND DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH EITHER AWWA C651 OR AWWA C652 OR FOLLOW PROCEDURES DESCRIBED BELOW: B.A. B.B. FLUSH PIPING SYSTEM WITH CLEAN, POTABLE WATER UNTIL DIRTY WATER DOES NOT APPEAR AT OUTLETS. FILL SYSTEM OR PART THEREOF WITH WATER/CHLORINE SOLUTION WITH AT LEAST 50 PPM OF CHLORINE, ISOLATE WITH VALVES AND ALLOW TO STAND FOR 24 HOURS, OR, FILL SYSTEM OR PART THEREOF WITH WATER/CHLORINE SOLUTION WITH AT LEAST 200 PPM OF CHLORINE, ISOLATE AND ALLOW TO STAND FOR THREE HOURS. B.C. FLUSH SYSTEM WITH CLEAN, POTABLE WATER UNTIL NO CHLORINE IS IN WATER COMING FROM SYSTEM AFTER THE STANDING TIME. B.D. REPEAT PROCEDURES IF BIOLOGICAL EXAMINATION SHOWS CONTAMINATION. B.E. SUBMIT WATER QUALITY TEST REPORT TO THE OWNER FOR DOCUMENTATION AND AUTHORITIES HAVING JURISDICTION. A. HYDRONIC PIPING SYSTEMS A.A. A.B. ABOVEGROUND PIPING SYSTEMS: HARD COPPER TUBE: ASTM B 88, TYPE L, WATER TUBE, DRAWN TEMPER. COPPER PRESSURE FITTINGS: ASME B16.18, CAST-COPPER ALLOY OR ASME B16.22, WROUGHT-COPPER, SOLDER/BRAZED-JOINTS. NOT USED 3. EXECUTION A. COORDINATE WITH ELECTRICAL TO PROVIDE ALL POWER AND CONTROL CIRCUITS AND CONDUITS TO COMPLETE THE SYSTEM. B. COORDINATE WITH ALL INTEGRAL EQUIPMENT CONTROLLERS FOR CONTROL INTERFACE REQUIREMENTS. HYDRONIC SYSTEM VALVES AND SPECIALTIES A.C. VALVES: VALVE PRESSURE AND TEMPERATURE RATINGS SHALL MEET THE REQUIRED SERVICE CONDITIONS. A.D. BALANCING VALVES: FIELD ADJUSTABLE CALIBRATED BALANCING VALVE FOR THE FLOW RATE INDICATED. BASIS OF DESIGN: BELL AND GOSSETT, WATTS, TACO, OR EQUAL. A.E. FLOW CONTROL VALVE: FACTORY PRESET CALIBRATED FLOW CONTROL VALVES FOR THE FLOW RATE INDICATED. BASIS OF DESIGN: GRISWOLD CONTROLS, FLOW DESIGN, INC., OR EQUAL. A.F. 2. PRODUCTS AIR VENTS: UNLESS OTHERWISE DIRECTED, TERMINAL AIR VENTS SHALL BE MANUAL TYPE. AUTOMATIC AIR VENTS SHALL BE LIMITED TO MECHANICAL EQUIPMENT SPACES WHERE DRAIN RECEPTOR IS NEARBY TO RECEIVE AIR VENT DISCHARGE. Date: Drawn: Checked: Project: File Name: Sheet Title: Sheet: M1.2 of SOLDOTNA, ALASKA 3. DRAWINGS: DRAWINGS ARE INTENDED TO BE DIAGRAMMATIC AND DO NOT NECESSARILY SHOW THE COMPLETE INSTALLATION. INFORMATION HEREIN MAY BE PARTIALLY BASED ON EXISTING BUILDING RECORDS, THE EXTENT OF WHICH MAY NOT REFLECT CURRENT BUILDING CONDITIONS. CONTRACTOR SHALL VERIFY ACTUAL CONDITIONS AND ADJUST AS APPROPRIATE TO COMPLETE THE PROJECT. 2. PRODUCTS A. A. THIS SECTION INCLUDES THE SANITARY DRAINAGE AND VENT SYSTEMS AND ACCESSORIES. ROMAN CATHOLIC CHURCH 2. BASIS OF DESIGN: "BASIS OF DESIGN EQUIPMENT IS IDENTIFIED FOR THE PURPOSE OF ESTABLISHING SIGNIFICANT QUALITY, PERFORMANCE, FUNCTION, DIMENSIONS, PHYSICAL PROPERTIES, APPEARANCE, AND OTHER RELEVANT MATERIAL AND PERFORMANCE CHARACTERISTICS. UNLESS OTHERWISE NOTED, THE IDENTIFICATION OF THE "BASIS OF DESIGN" EQUIPMENT IS NOT INTENDED TO PRECLUDE ALTERNATIVE MATERIAL AND EQUIPMENT SELECTIONS. HOWEVER, THE OWNER RETAINS THE RIGHT TO REJECT MATERIAL AND EQUIPMENT DEVIATING FROM THE BASIS OF DESIGN. WHERE MATERIAL AND EQUIPMENT DEVIATION IS ALLOWED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY MODIFICATIONS NECESSARY TO INCORPORATE THE EQUIPMENT INTO THE PROJECT. A. FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP 1. GENERAL REQUIREMENTS FOR MECHANICAL AND PLUMBING SYSTEMS: ALL WORK SHALL CONFORM TO THE CURRENTLY ADOPTED CODES AND STANDARDS AND AS AMENDED AND/OR REFERENCED. 1 3 A TP 2"W 1-1/2"V 2"W 2"W 4"W 2"W 2"W 2"W 2"W 4"W 4"W TP 2"W TP 2"W 3"W Revisions: 2"W 2-1/2"W 3"W 2"W TP Date: Drawn: Checked: Project: File Name: B Sheet Title: Sheet: 1 PLUMBING PLAN, UNDERFLOOR M2.1 of SOLDOTNA, ALASKA 4"W ROMAN CATHOLIC CHURCH 2"W FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP 2"W 2"W 3 1 1-1/4"G TO RTU SERVICE. A 2"G 2-1/2"G 1-1/4"G 1"CW 2"G VTR ET-1 2"G DOWN TO MAU-1 WH-1A FD-1 P-9 WH-1B (1 GPM) P-5 TP-1 1-1/2"G (RANGE) 3/4"G (GRIDDLE) 3/4"G (OVEN) P-4 1/2"HWC 3/4"HW (8 FU) 1"CW (10.5 FU) 3"G P-4 P-6 3/4"HW(140 DEGF) P-5 FS-1 P-3A 3/4"CW (5 FU) 3/4"HW (5 FU) 3/4"HW 3/4"CW 3/4" CW P-1 CO 3/4"CW (5.5 FU) 3/4"HW (140 DEG F)(5.5 FU) P-3A P-1 1/2"HWC 3/4"HW (16.5 FU) 1-1/4"CW (24.5 FU) 2-1/2"G P-7 P-1A FD-1 WCO VTR VTR 1/2"HWC 3/4"HW 2" CW 2-1/2"G FLOW CONTROL VALVE FD-1 HB-1 2"CW (136 FU) P-2 P-2 FD-1 P-8 Revisions: GI-1 P-1A FCO FS-1 CO P-3A P-3A FCO PROVIDE WATER HAMMER ARRESTOR AND VACUUM BREAKER AT SERVICE TO DISHWASHER. 3/4"HW (2 FU) 3/4"CW (2 FU) HB-1 PROVIDE 1" INSULATION ON WATER PIPE THROUGH RETURN AIR PLENUM. Date: 3/4"CW Drawn: 1/2"HWC 3/4"HW 2" CW 2-1/2"G Checked: Project: File Name: 1-1/4"G 1-1/4"G TO RTU SERVICE. 1/2"HWC 3/4"HW 2" CW 3"G Sheet Title: B Sheet: 1 PLUMBING PLAN CONTINUE NEW GAS SERVICE TO RELOCATED GAS METER. COORDINATE WITH UTILITY FOR NEW METER/REGULATOR TO ACCOMMODATE NEW LOAD PER THIS PROJECT AS APPROPRIATE. M2.2 of SOLDOTNA, ALASKA YCO 3/4"CW (5 FU) 3/4"HW (5 FU) 1/2"HWC ROMAN CATHOLIC CHURCH FCO FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP 2"G FD-1 RTU-1 A 36"X36" O/A INTAKE LOUVER O/A CO2 (1050 CFM) RA-1 (1050 CFM) RA-1 8" S/A 24"x12" S/A 3 DASHED LINE INDICATES LOW CEILING RETURN AIR PLENUM. COORDINATE WITH FRAMING AND FINISH TO MAINTAIN CLASS I SURFACE FOR PLENUM APPLICATION. 24"x12" R/A 1 R/A EHU-2 MAU-1 18" S/A R/A R/A 36" CLEARANCE RTU-1 CONTROL SPACE CARBON DIOXIDE SENSOR MOUNT AT R/A INLET. (50 CFM) SA-2 KEF-1 (ON ROOF) SA-1 (525 CFM) S KITCHEN HOOD EXHAUST FAN CONTROL SWITCH SA-2 (50 CFM) T SA-3 (525 CFM, 4 TYP.) 8" S/A RTU-1 CONTROL THERMOSTAT 6" OVEN VENT STACK. PROVIDE DRAFT DIVERTER AT OVEN FLUE TRIM OUTLET. HD-1 16" S/A 6" S/A 16" S/A 6"S/A SA-4 (100 CFM) 12" S/A 6"S/A 6"S/A SA-4 (100 CFM) EHU-1 S EF-1 6"E/A E/A (100 CFM) SA-4 EF-1 6"E/A E/A Revisions: HD-2 S (50 CFM) SA-2 6"S/A S T RTU-2 CONTROL THERMOSTAT EHU-1 (525 CFM) SA-1 (525 CFM) SA-1 (525 CFM) SA-1 KEF-2 (ON ROOF) 6"S/A 18" S/A 6"S/A 8" S/A R/A B (100 CFM) SA-4 6"S/A (50 CFM) SA-2 Date: Drawn: Checked: Project: File Name: CO2 24"x12" R/A RTU-2 24"x12" S/A Sheet Title: DASHED LINE INDICATES LOW CEILING RETURN AIR PLENUM. COORDINATE WITH FRAMING AND FINISH TO MAINTAIN CLASS I SURFACE FOR PLENUM APPLICATION. MECHANICAL PLAN RTU-2 CONTROL SPACE CARBON DIOXIDE SENSOR MOUNT AT R/A INLET. (1050 CFM) RA-1 R/A 18" S/A (1050 CFM) RA-1 6"S/A (100 CFM) SA-4 R/A 1 12" S/A 10" S/A 10" S/A (50 CFM) SA-2 10" S/A 10" S/A EDGE OF UPPER CEILING LINE 6"S/A (525 CFM) SA-1 Sheet: (50 CFM) SA-2 M2.3 of SOLDOTNA, ALASKA KITCHEN HOOD FIRE SUPPRESSION SYSTEM CABINET ROMAN CATHOLIC CHURCH SA-1 (525 CFM) FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP SA-1 (525 CFM) 6"S/A SA-1 (525 CFM) (50 CFM) SA-2 6"S/A 12" S/A 10" S/A 10" S/A 10" S/A SA-2 (50 CFM) 10" S/A 6" S/A 1 2 3 A WATER HEATER COMBUSTION AIR INTAKES AND VENT TERMINATIONS. VTR VTR VTR Revisions: KEF-2 Date: Drawn: Checked: Project: File Name: Sheet Title: B Sheet: 1 ROOF PLAN M2.4 of SOLDOTNA, ALASKA ROMAN CATHOLIC CHURCH 6" OVEN VENT WITH ROOF CAP. OFFSET TO CLEAR ROOF VALLEY AS APPROPRIATE. FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP KEF-1 OFFSET TO CLEAR ROOF VALLEY AS APPROPRIATE. MAU-1 HD-1 SA-3 (4 TYP.) Revisions: Date: Drawn: Checked: Project: File Name: Sheet Title: Sheet: 1 MECHANICAL RENDERING - RTU (TYPICAL) 2 MECHANICAL RENDERING - MAU-1 M3.1 of SOLDOTNA, ALASKA EF-1 ROMAN CATHOLIC CHURCH (RTU-1 SIMILAR) FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP RTU-2 B A S/A DASHED LINE INDICATES LOW CEILING RETURN AIR PLENUM. COORDINATE WITH FRAMING AND FINISH TO MAINTAIN CLASS I SURFACE FOR PLENUM APPLICATION. RA-1 TYP. 12"X24" INSULATED S/A AND R/A DUCTS IN ARCHITECTURAL ENCLOSURE. R/A DASHED LINE INDICATES LOW CEILING RETURN AIR PLENUM. COORDINATE WITH FRAMING AND FINISH TO MAINTAIN CLASS I SURFACE FOR PLENUM APPLICATION. RTU-1 1 RTU-2 MECHANICAL SECTION THROUGH FELLOWSHIP HALL B A KEF-1 KEF-2 24" HEIGHT ROOF CURB. 24" HEIGHT ROOF CURB. Revisions: TYPICAL S/A DUCT WITH 2" INSULATION IN ATTIC. 8"E/A WITH 2" INSULATION. LISTED INSULATED GREASE DUCT IN ATTIC. SEAL TYP. DUCT PENETRATION THROUGH CEILING ASSEMBLY. SA-4 HD-2 (78" AFF) SA-3 MAU-1 HD-1 (78" AFF) O/A Date: Drawn: Checked: Project: File Name: Sheet Title: Sheet: 2 MECHANICAL SECTION THROUGH KITCHEN M3.2 of SOLDOTNA, ALASKA RA-1 ROMAN CATHOLIC CHURCH R/A SA-1 (525 CFM) FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP S/A SA-1 SEQUENCE OF OPERATION: - DISHWASHER VENTILATION SYSTEM DISHWASHER VENTILATION SYSTEM (EXHAUST FAN KEF-2) SHALL BE OPERATED BY THE MANUAL ON/OFF CONTROL SWITCH. KEF-1 KEF-2 SAT OUTSIDE AIR ISOLATION CONTROL DAMPER. COOK LINE VENTILATION SYSTEM COOK LINE VENTILATION SYSTEM (EXHAUST FAN KEF-1 AND MAKE-UP AIR UNIT MAU-1) SHALL BE OPERATED BY THE MANUAL ON/OFF CONTROL SWITCH. 1. WITH CONTROL SWITCH IN "ON" POSITION, MAU-1 HD-1 S/A S DISHWASHER VENTILATION SYSTEM CONTROL SWITCH DISHWASHER VENTILATION SYSTEM 1 S COOK LINE VENTILATION SYSTEM CONTROL SWITCH COOK LINE VENTILATION SYSTEM SYSTEM SCHEMATICS - KITCHEN VENTILATION SYSTEMS - EXHAUST FAN KEF-1 IS DE-ENERGIZED. MAKE-UP AIR UNIT MAU-1 IS DE-ENERGIZED. MAKE-UP AIR UNIT ISOLATION CONTROL DAMPER SHALL CLOSE. 2. WITH CONTROL SWITCH IN "OFF" POSITION, Revisions: Date: Drawn: Checked: Project: File Name: Sheet Title: Sheet: M4.1 of SOLDOTNA, ALASKA HD-2 EXHAUST FAN KEF-1 IS ENERGIZED. MAKE-UP AIR UNIT MAU-1 IS ENERGIZED. MAKE-UP AIR UNIT ISOLATION CONTROL DAMPER SHALL OPEN. MAKE-UP AIR UNIT SHALL MODULATE GAS-FIRED HEATING SECTION BASED ON SUPPLY AIR TEMPERATURE SENSOR (SAT) TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT OF 65 DEGREES F. ROMAN CATHOLIC CHURCH O/A - FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP MOD 1 SIDE VIEW DETAIL - TYPICAL RTU INSTALLATION MAU-1 Revisions: O/A Date: Drawn: Checked: Project: File Name: Sheet Title: Sheet: 2 DETAIL - MAU-1 INSTALLATION M5.1 of SOLDOTNA, ALASKA END VIEW ROMAN CATHOLIC CHURCH RTU-1 RTU-2 (SIM.) FELLOWSHIP HALL ADDITION OUR LADY OF PERPETUAL HELP RTU-1 RTU-2 (SIM.)