Pft_2 Pipe 4 Pipe Fcus

   EMBED


Share

Transcript

PRE-FUNCTIONAL PERFORMANCE TESTING 4 PIPE FAN COIL UNITS (FCU-___) University of Scranton Servicing: Building Cooling Location: _______________ TRADE CONTRACTOR Upper Class Residence Hall Unit Type: ________________ Page 1 of 3 CONTACT INFO SUBSYSTEM: Chilled Water System Heating Hot Water Standby Power Manufacturer: Individuals performing test (print): Model: Start-up date: Serial No.: Size: 1. PURPOSE AND SCOPE To verify that the FCU-____ is visually and mechanically inspected, ensuring that it is installed in compliance with the drawings and specifications. 2. PROCEDURE Upon completion of the installation of FCU-____, perform the checks and inspections included in this form. Verify that any issues found prior to or during this inspection be assigned an issue number with a detailed description of each deficiency. Attach additional sheets as necessary. This checklist DOES NOT take the place of the Manufacturer’s recommended start-up and checkout procedures or reports. Items that do not apply shall be checked as N/A (not applicable). 3. SAFETY All parties involved must be cognizant of applicable safety procedures. This document does not include any procedures, including specific safety procedures. It is recognized that an overwhelming majority of tests and inspections recommended are potentially hazardous. Individuals performing these tests shall be capable of conducting the tests in a safe manner and with complete knowledge of the hazards involved. PRE-FUNCTIONAL PERFORMANCE TESTING 4 PIPE FAN COIL UNITS (FCU-___) University of Scranton Servicing: Building Cooling Location: _______________ Upper Class Residence Hall Unit Type: ________________ Page 2 of 3 4. CHECKLIST ITEM Equipment General Installation & Casing Condition (Dents, Leaks, etc.) Unit Accessible for Maintenance Unit free of Construction Debris/Dust Unit Suspended from Structure with Elastomeric Hangers Fan Motor Wired Equipment Control Wiring Complete Equipment Grounded Properly Fan Belt Correctly Aligned and Tensioned Supply and Return Piping Installed Correctly Two-way Modulating Control Valve Installed in Correct Position Calibrated Balancing Valve Installed in Correct Position Air Vent Installed in Correct Position Strainer Installed in Correct Position Chilled Water Piping Installed Heating Hot Water Piping Installed Ball Valve Installed on Supply and Return Piping Drain Valve Installed in Correct Position Filter Installed Wall Mounted Thermostat Installed Ensure BAS System is interfaced and programmed to control the two pipe and four pipe systems Factory-authorized Service Representative Start-up Paperwork Received N/A PASS FAIL ISSUE ISSUE # PRE-FUNCTIONAL PERFORMANCE TESTING 4 PIPE FAN COIL UNITS (FCU-___) University of Scranton Servicing: Building Cooling Location: _______________ ISSUE # ISSUE – PLEASE BE DETAILED AND SPECIFIC Upper Class Residence Hall Unit Type: ________________ Page 3 of 3 RECORDED BY DATE CORRECTION VERIFIED