Transcript
PRE-FUNCTIONAL PERFORMANCE TESTING 4 PIPE FAN COIL UNITS (FCU-___) University of Scranton Servicing: Building Cooling Location: _______________ TRADE
CONTRACTOR
Upper Class Residence Hall Unit Type: ________________ Page 1 of 3 CONTACT INFO
SUBSYSTEM:
Chilled Water System Heating Hot Water Standby Power
Manufacturer:
Individuals performing test (print):
Model:
Start-up date:
Serial No.: Size:
1.
PURPOSE AND SCOPE To verify that the FCU-____ is visually and mechanically inspected, ensuring that it is installed in compliance with the drawings and specifications.
2.
PROCEDURE Upon completion of the installation of FCU-____, perform the checks and inspections included in this form. Verify that any issues found prior to or during this inspection be assigned an issue number with a detailed description of each deficiency. Attach additional sheets as necessary. This checklist DOES NOT take the place of the Manufacturer’s recommended start-up and checkout procedures or reports. Items that do not apply shall be checked as N/A (not applicable).
3.
SAFETY All parties involved must be cognizant of applicable safety procedures. This document does not include any procedures, including specific safety procedures. It is recognized that an overwhelming majority of tests and inspections recommended are potentially hazardous. Individuals performing these tests shall be capable of conducting the tests in a safe manner and with complete knowledge of the hazards involved.
PRE-FUNCTIONAL PERFORMANCE TESTING 4 PIPE FAN COIL UNITS (FCU-___) University of Scranton Servicing: Building Cooling Location: _______________
Upper Class Residence Hall Unit Type: ________________ Page 2 of 3
4. CHECKLIST ITEM
Equipment General Installation & Casing Condition (Dents, Leaks, etc.) Unit Accessible for Maintenance Unit free of Construction Debris/Dust Unit Suspended from Structure with Elastomeric Hangers Fan Motor Wired Equipment Control Wiring Complete Equipment Grounded Properly Fan Belt Correctly Aligned and Tensioned Supply and Return Piping Installed Correctly Two-way Modulating Control Valve Installed in Correct Position Calibrated Balancing Valve Installed in Correct Position Air Vent Installed in Correct Position Strainer Installed in Correct Position Chilled Water Piping Installed Heating Hot Water Piping Installed Ball Valve Installed on Supply and Return Piping Drain Valve Installed in Correct Position Filter Installed Wall Mounted Thermostat Installed Ensure BAS System is interfaced and programmed to control the two pipe and four pipe systems Factory-authorized Service Representative Start-up Paperwork Received
N/A
PASS
FAIL
ISSUE
ISSUE #
PRE-FUNCTIONAL PERFORMANCE TESTING 4 PIPE FAN COIL UNITS (FCU-___) University of Scranton Servicing: Building Cooling Location: _______________
ISSUE #
ISSUE – PLEASE BE DETAILED AND SPECIFIC
Upper Class Residence Hall Unit Type: ________________ Page 3 of 3
RECORDED BY
DATE
CORRECTION VERIFIED