Preview only show first 10 pages with watermark. For full document please download

Piazzetta Ip 68-49 Installation, Use And Maintenance Manual

   EMBED


Share

Transcript

1 2 3 4 5 6 7 8 SECTION TITLE PAGE 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 3.0 4.0 GENERAL RULES SINGLE FLUEWAY OR CHIMNEY SOOT INSPECTION CHIMNEY STACK FRESH AIR INTAKE INSTALLATION ENVIRONMENT LOAD CAPACITY OF THE FLOOR HEATING CAPACITY SUITABLE HEAT INSULATING MATERIALS MINIMUM SAFETY DISTANCES FLUE WAY CONNECTING TO A CONVENTIONAL CHIMNEY USING AN EXTERNAL FLUE HOOD GRILLE PROTECTION FOR AN ORNAMENTAL LEDGE ELECTRICAL POWER SUPPLY PREVENTION OF DOMESTIC FIRES TECHNICAL CHARACTERISTICS AND SPECIFICATIONS FEATURES TECHNICAL DATA ACCESSORIES AND EQUIPMENT PRODUCT IDENTIFICATION DATA DIMENSIONS DIMENSIONS WITH PELLET DRAWER KIT DIMENSIONS WITH SUPPORT KIT DIMENSIONS WITH PELLET LOADING KIT DIMENSIONS WITH ADDITIONAL PELLET TANK KIT WIRING DIAGRAM FUEL PREPARING FOR THE INSTALLATION 10 11 11 12 13 13 14 14 14 15 16 18 19 19 19 20 20 20 20 21 21 22 22 23 23 24 24 25 26 26 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 6.22 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 8.0 8.1 INSTALLATION POSITION OF INSERT IN HOUSING AND CLADDING CONVECTION AIR OUTLET POSITIONS MULTIFUOCO SYSTEM FIXING THE BASE ELECTRICAL CONNECTIONS AND CONTROL DEVICES INSTALLING THE EXTERNAL THERMOSTAT ASSEMBLY OF THE EXTRACTABLE PART INSTALLATION OF OPTIONAL SUPPORT USE LOADING THE PELLETS REMOTE CONTROL LIGHTING FOR THE FIRST TIME STARTUP AND NORMAL OPERATION TROUBLESHOOTING CONTROL PANEL SETTING THE LANGUAGE PROGRAMMING PROGRAMMING THE CLOCK TIMER FAN MODE MULTICOMFORT ENERGY SAVING PARAMETER SETTING ENABLE AUDIO SIGNAL STOVE STATUS MODIFYING THE TRANSMISSION UNIT MULTIFUOCO SYSTEM OPERATION SAFETY DEVICES OPENING THE DOOR INSERT EXTRACTION DISPOSAL OF ASHES MAINTENANCE CLEANING THE BRAZIER AND BRAZIER HOUSING CLEANING THE COMBUSTION CHAMBER CLEANING THE FLUE SYSTEM CLEANING THE ENAMELLED METAL PARTS CLEANING THE GLASS ( DAILY ) REPLACING THE GLASS REPLACING THE REMOTE CONTROL BATTERIES CLEANING THE FANS WHEN NOT IN USE EXTRAORDINARY MAINTENANCE TROUBLESHOOTING REPLACING THE FUSES CERTIFICATE OF CONFORMITY FLUE PARAMETER SETTING GUIDE 27 27 28 29 30 31 32 32 33 34 34 35 36 37 40 42 42 43 44 45 50 51 51 53 55 55 56 56 57 59 60 60 61 61 62 62 62 63 63 63 64 64 64 65 68 69 71 INDEX 9 10 NO T FO R UK US E 11 12 13 14 15 16 17 N O T FO R U K U SE 18 N O T FO R U K U SE 19 N O T FO R U K U SE 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 Robeys Ltd Goods Road, Belper, Derbyshire. DE56 1UU Tel 01773 820940 Fax 01773599309 Email [email protected] www.robeys.co.uk 74