Preview only show first 10 pages with watermark. For full document please download

Proboil.3.0

   EMBED


Share

Transcript

PROBOIL.3.0  Installer checklist This checklist is designed to ensure the professional installation, service and care for this premium product. Failure to complete and return this form may result in our warranty being voided. If you have any questions please contact the service agent listed on the top of the boiler. Please leave this reference document for your client. Please clearly complete the following detail in block capitals then scan or photograph pages 1 & 2 and return this [email protected]. Please check the images supplied are sufficiently clear the maximum total file size is 5mb. All information supplied will be used to initiate a quality and service record lasting the lifetime of this product, any contact information will not be given to any third party without prior permission. 1) Product detail: Boiler serial number: (numeric, see front silver data plate) Tap model code: (alphanumeric, see tap box label) 2) End Customer details: Full name: Installation address: (full address including post code) *If the site is new and or vacant please supply as much detail as possible. The end customer must complete the registration process after the property is occupied. Contact phone number: (optional) Contact Email address: (required for automated replacement filter reminders and offers) 3) Installer details: Installation date: (dd/mm/yyyy) Installers name: Company name: Company address: (full address including post code) Contact phone number: (mandatory) Proboil 3 installer checklist v1-0e Page 1 4) Location details: a) Static hot water pressure: (measured locally to the product) b) Domestic hot water system type: (example: gravity fed (vented), combination boiler, pressurised) c) Water hardness value: (tested from an unfiltered & unsoftened cold water source, write the hardness in English Clarke scale only) 5) Pre Installation details: a) Delivery condition (confirm the boiler product has been delivered without visual or physical damage and all parts are present) b) Delivery condition (confirm the tap product has been delivered without visual or physical damage and all parts are present) c) Incoming cold water pressure (please state value in Bar) d) Hot & Cold 15mm feeds (are suitably located and have service (isolation) valves) e) Hot & Cold feeds flushed (flush until clear) f) Vent to sink drain connection (the location and size is suitable to connect the vent pipe) g) Electrical socket (the socket is available and located so it can be used at all times) h) Tap hole size & position (the size and position is suitable for the product to be installed) i) Installation space (sufficient space is available to install and service the product) 6) Filter Installation details: a) Bypass setting (confirm the bypass valve has been adjusted to suit the local water conditions, supply the number the bypass dial was set to) b) Filter location (sufficient space is available to install and replace the filter cartridge) 7) Post Installation / commissioning details: a) Ambient filtered flow rate (confirm the flow rate of filtered water is adjusted to 2 litres / minute) b) Domestic hot maximum water flow rate (What is the approximate flow rate in litres per minute?) Proboil 3 installer checklist v1-0e Page 2 Proboil 3 installer checklist v1-0e Page 3 Key Qty Description A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 B1 B2 B3 B4 B5 B6 B7 B8 B9 C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 D1 D2 D3 E1 E2 E3 E4 E5 E6 E7 E8 E9 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 2 1 1 1 Part of C8 Part of C8 1 1 0 1 1 0 1 1 1 1 1 0 1 1 Boiler unit 1.5m Power lead Boiler mounting bracket Boiler bracket to base unit screw Boiler bracket screw Data connection lead ½” Safety / steam / overflow vent outlet 3/8” Hot water outlet ¾” Filtered water inlet Screw – front panel Front panel Drain valve ½” BSPF x ¼” push fit ¼” tube (drain) 1 ½” x 3” Waste extension piece (for use with one bowl sinks only) 1 ½” x 1 ½” x 22mm Waste tee 22mm Olive Plastic compression nut 22mm copper pipe with elbow, installer fabricated to suit. Plastic compression nut 22mm Olive ½” x 22mm Tundish ½” x ½” Vent hose ¾” BSP x 3/8” push fit 3/8” x 600mm tube (thicker tube type) Filter head (including check valve) Flush / Drain pipe Filter cartridge Filter head screws 3/8” stem x ¼” push fit ¼” x 1500mm Tube (thinner tube type) ¼” x ¼” x ¼” Push fit equal tee ¼” x 1500mm Tube (cut to length as required from C8) ¼” x 1500mm Tube (cut to length as required from C8) ¼” NPTF x ¼” Push fit connector ¾ BSPF x ¼”” push fit 15mm copper pipe 15mm Compression nut 15mm Compression olive 15mm copper pipe 15mm Compression nut 15mm Compression olive ½” (15mm) x ½” (15mm) x ¾” 3 way isolating tee 15mm Compression olive 15mm Compression nut 15mm copper pipe 15mm Compression nut 15mm Compression olive Proboil 3 installer checklist v1-0e Page 4