Preview only show first 10 pages with watermark. For full document please download

Project Name

   EMBED


Share

Transcript

ELECTRICAL KEY WATERPROOFING GENERAL NOTES: COPYRIGHT: double waterproof 15 amp socket flush with FFL! 1.! 250 micron damp proof membrane [DPM] is to be laid under all surface double 15 amp socket flush with FFL beds. 2.! 375 micron damp proof course [DPC] at base of all walls, at slab level, and In accordance with the relevant clauses of the Copyright Act (Act 98 of 1978) relating to assignment, all documents prepared by designworkshop : sa in Power supply components St St stove connection flush with FFL stove connection at 650 AFFL double 15 amp socket at 220 AFFL W M HZ double waterproof 15 amp socket at 220 AFFL HY HX HW HV HU HG HH HH 3.! double 15 amp socket at 650 AFFL 4.! 5.! 6.! double 15 amp socket at 990 AFFL double 15 amp socket at 1165 AFFL Sh shaver socket at 1165 AFFL double 15 amp socket in cable tray YA double 15 amp socket in ceiling/soffit Light fittings! floor light flush mounted floor light flush mounted adjustable floor mounted flood light floor mounted flood light adjustable wall mounted fitting H11 H11 H10 H10 wall mounted fitting adjustable wall mounted up light wall mounted down light wall mounted up|down light wall mounted flood light ceiling mounted pendant low voltage track fluorescent double fluorescent single recessed fluorescent double recessed garden light H6 lamp post LV low voltage B bollard lighting waterproof two-lever switch at 990 AFFL W4 waterproof four-lever switch at 990 AFFL 2 way dimmer circuit stove isolator switch at 1165 AFFL doorbell photo electric cell concealed 5 100 G geyser position power supply cable to d.b. cable tray AC air conditioner ceiling mounted cassette air conditioner mid-wall split at 2100 AFFL 2x25 conduit links back to DB and Draw Box data double outlet flush with FFL D data wall outlet at 220 AFFL D2 data double wall outlet at 220 AFFL D data wall outlet at 990 AFFL D2 data double wall outlet at 990 AFFL internet transmitter wireless satellite dish TV television aerial connection point at 650 AFFL HiFi HiFi connection point at 650 AFFL S speaker wall mounted S speaker mounted flush with ceiling 2 770 H alarm keypad at 1420 AFFL I intercom point at 1165 AFFL I intercom point at 1420 AFFL passive 440 ex whb H L ex wall to be demolished D03 CA NEW CLASSROOM 1 A: 62,02 m2 Carpet STAIR 3 to backstage 22 treads @ 260 + 900mm platform. 23 risers @ 175mm FFL +45, 295 form new opening in ex brkwk 25mm step D05 CE line of steel screen LED Lighting strip all along screen line sliding gate to detail escape door in screen PUBLIC WALKWAY new RC column form new opening in ex brkwk 25mm step D07 CG L2 6 NEW PRIVATE WALKWAY A: 60,29 m2 Power floated slab sandblasted finish to specialist's detail ex RC column FFL +45, 270 ex RC column 7,5m building line NEW SW 200 X 200 cruciform column SUMP 1 2 3 4 5 6 7 8 910 YC 1112131415161718192021 STAIR 2 to pool 20 treads @ 290mm, 21 risers @ 160mm and 900mm landing line of slab above EX SUTCLIFF HALL H2 110 x 220 x 900mm steel bollards to arch detail B B 3 minimum of 50mm uPVC. Pipes laid below buildings, roads or parking areas to be heavy duty uPVC. 14.! Wastewater branch drains over 6m long to comply with SANS 10400 PP18.4c. 15.! Inspection eyes to all bends and junctions in drains and marked with covers at ground level. 16.! Rodding eyes are to comply with SANS 10400 PP21 17.! Invert level at head of drain to be a min of 450mm below ground level. 18.! Head of drains to have 110mm stack vent pipe [SVP]. 19.! Pipe work is to be at a minimum gradient of 1:60. 20.! Drains under building to be encased in concrete. 21.! All waste fittings to have rodding eye seal traps. 22.! All overflow gulleys to be exposed. 23.! All gulley surrounds to be 75mm above finished ground level. 24.! All fitting locations must be installed strictly in accordance with layout drawings. Contractor to ensure that plumbers and other tradesman follow the detailed drawings carefully when installing any bathware / sanitaryware. The supplier is to be consulted for detailed installation requirements for all fittings. 25.! All plumbing and water supply pipes are to be concealed in walls. No pipe work to be exposed on external surfaces of visible walls and connection to FIRE NOTES: CLIFTON SCHOOL PHASE 1 ALTERATION 1.! HALL RENOVATIONS 2.! 3.! FFL +45, 300 part of existing SATCLIFFE HALL to be demolished new sump H1 H1 COLLEGE DROP-OFF 24 BAYS boundary line NEW PEDESTRIAN CROSSING AND SPEED HUMP TO ALIGN WITH MAIN ENTRANCE 5 190 1.! 195 3 360 5 105 motor garage door 250 4 810 235 145 5.! The contractor is responsible for fire water supply complying with SANS 10400 W [mechanical eng?]. All fire protection installation to comply with SANS 10400 T and relevant specific building classifications. Fire escape stairs to be minimum of 1100mm, all in compliance with SANS 10400 TT23. Fire equipment signage required in terms of SANS 10400 TT29 & TT32 and displayed to dws : sa specification. All equipment is to be stainless steel if within 15km of the coast or subject to degrading chemical exposure. Water supply to fire hose reels [FHR] to be minimum 25mm and in compliance with SANS 10400 TT33. 30m FHRʼs to comply with SANS 543 and SANS 10400 TT34. Portable fire extinguishers to comply with SANS 10400 TT37. Structural stability to comply with SANS 10400 TT7. Materials to comply with SANS 10177. GENERAL NOTES: to municipal connection motor electric gate 4.! 6.! 7.! 8.! 9.! NEW TRAFFIC ISLAND TO ALLIGN WITH EX ISLAND 915 445 5 300 5 145 540 210 235 1 020 1 365 1 035 445 3 225 500 165 455 3 005 6 575 525 450 4 380 200 90 10 065 4 235 3 165 485 3 600 470 6 750 6 740 3 710 960 smoke override to maglock to gates 6 775 2. Mechanical lighting and ventilation to internalised WC's and habitable rooms in compliance with SANS 10400 Part O. 25 L/S per bathroom of mechanical ventilation 3. min 160 lux atrificial lighting to the bathrooms where required 4.! The contractor is responsible for the glazing being executed in strict conformance with glass manufacturerʼs recommendations & all in accordance with the National Building Regulations Part N, SANS 461 M HZ 4 542 4 025 HY 3 235 HX 3 355 HW 3 235 HV 3 841 HU 4 650 HG 10137,SANS 1263-1 & AAAMSA Selection Guide for Safety Glazing HH HH location diagram equipment to be neat and non-visible. Position of pipe work to be agreed with dws : sa. 26.! All pipe work to be coordinated with other services. Queries or concerns are to be recorded with dws : sa before installation. H2 substation to be relocated and then demolished pending municipal approval security camera pool pump D06 CF wall to follow stair's profile ex RC column exterior installation in strict accordance with the manufacturers instructions. 13.! Soil pipes are to be a minimum of 110mm uPVC, waste pipes are to be a A: 67,65 m2 Carpet 25mm step NEW SW SUMP line of slab above NEW CLASSROOM 2 L2 FFL +45, 270 YB 3 FFL +45, 295 INTERNAL PRIVATE WALKWAY beam P ex stair to be demolished 2 W01 CA A: 18,42 m2 Power floated slab H ex column D08 CD FFL +45, 350 L NEW FOYER ex column ex column A: 2,45 m2 Grano screed L H projector ceiling mounted A 5 EX WC H D2 SU N RF EW AC 1 new whb E 25 BE D D02 D01 CB CA ex stair to be demolished 1 12.! All geysers to have a multiblock pressure reducing valve, access for adjusting and maintenance, and visibility to check for system leaks. The pressure-reducing valve must be within 15m of the hot water cylinders for balancing of hot and cold water. Installation, temperature pressure emergency safety valve and draincock, overflow tray and overflow pipe to H4 H data outlet flush with FFL H ex WC H telephone connection point at 1165 AFFL D H new WC H telephone connection point at 990 AFFL T FFL +45, 350 w H T H ne ba H telephone connection point at 220 AFFL RE w H escape door in screen IE n tio va a c ex : lo be ge sta k c H gas oven/stove supply T RE A: 8,81 Grano screed IE maximum operating pressure of 500KPa | 5 bar]. 9.! Hot and cold water is required to all washing facilities, unless otherwise specified. 10.! Hot water reticulation to be sized | designed to ensure that hot water is available within half a minute of turning the tap. All hot and cold water supply 105 90 245 3 730 H GS 3 485 H gas fire supply 3 675 H GF IE m2 22 21 20 19 18 17 gas heater at 2400 AFFL 300 D09 CC H GH D38 3 270 H5 4 NEW SECURITY BOH STAIR 1 to SUTCLIFFE hall 19 treads @ 355mm, 18 risers @ 140mm YCAN 305 Preambles for Trades. 8.! Internal water pressure to be provided at 400KPa [taps and mixers have a pipes to be a minimum of 100mm apart. Hot and cold water supply to be balanced and pressure tested before closing up. 11.! Accessible hot and cold water isolation valves to each ablution cluster. H heated towel rail 4 030 EX HALL H extractor fan at 2400 AFFL 110 16 extractor fan recessed into ceiling 240 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 1 155 ceiling fan 1 615 AC YB 7 552 Appliance locations! 210 110 60 415 485 200 910 1 225 930 PEC 12 11 10 9 8 7 6 5 4 3 2 1 5 135 5 12 BED W NE ACE RF H4 doorbell button at 990 AFFL 21 785 65 SU distribution board at 2100 AFFL 985 IS dimmer circuit motion sensor/timer fire door D30 AN8 1 Power floated slab 17 escape from basement 16 14 treads @ 300mm + 15 platform 14 16 risers @ 163mm 13 220 D 2 way D 2 way circuit 8 755 2 way 110mm thk brick wall bagged & painted finish in front of waterproof lever switch at 990 AFFL W2 60 W H5 105 four-lever switch at 990 AFFL 3 230 two-lever switch at 990 AFFL L4 Existing 100 Ø stm water line to be upgraded to 300 Ø uPVC class 34 as per eng spec. 225 L2 1 485 lever switch at 990 AFFL 3 655 L 245 Control components! H6 YA 2 occupational safety act 6 of 1983 or the latest amendment and the SANS 10400 [National Building Regulations]. 6.! Water supply is to comply with SANS 10400 W. 7.! Mains water supply pipe to building to be HDPE or LDPE as necessary to SANS 10400. External drinking water supply pipe to be 25mm HDPE. All internal pipe work [hot and cold water] to be 22mm [unless otherwise stated] copper and lagged. All pipe work required to external showers and basins routed underground to be polycop 15mm. All in accordance with Model Existing columns & footings to be demolished to hall canopy ex sewer line Soil poisoning to comply with SANS 10400-F fluorescent single 2 proposed alterations are to be reported to dws : sa prior to commencing work. 3.! The sewer sections shown indicate the design intention only and are to be verified by the plumbing contractor and any discrepancies or proposed alterations are to be reported to dws : sa prior to commencing work. Temporary sewer main laid to falls on existing surface to eng specification. 110mm thk brick wall bagged & painted finish in front of 250mm RC RW wall to eng detail track suspended fitting 10400 P, SANS 10252-2, SANS 1200 and any requirements of the local authority. It is the responsibility of the plumbing contractor to ensure compliance therewith. 2.! The municipal sewer connection point is to be exposed prior to commencing any drainage installation, and the level is to be verified. Any discrepancies or 415 external ceiling/soffit fitting recessed adjustable H7 Existing sewer to be temporarily rerouted prior to commencement of any construction as per eng specification. 3 555 H7 e external ceiling/soffit fitting recessed 290 external ceiling mounted fitting adjustable DRAINAGE & PLUMBING GENERAL NOTES: 4.! The storm water drainage is to be to engineerʼs detail. 5.! Sanitary fixtures to be provided in compliance with the machinery and 11 500 external ceiling mounted fitting 4 215 external ceiling mounted pendant EX SUTCLIFF HALL 215 2 115 285 external wall mounted flood light 410 external wall mounted up/down light 270 external wall mounted down light H8 3 605 H8 um external wall mounted up light vol external wall mounted fitting adjustable 255 external wall mounted fitting 4 395 external floor mounted flood light adjustable similarly fused to primed surfaces. Waterproofing to be turned up sidewalls and over fillets as required. Finish with 2 coats aluminium bitumous paint. Membrane to be installed by a ʻDerbigumʼ approved applicator and strictly according to manufacturers detail and specification. A 10-year guarantee is to be seeded to dws : sa. 7.! All showers, where not tiled, are to be sealed with ʻeverbondʼ or equal approved by dws : sa, applied to manufacturers specification before application of top coats. Where the walls are already damp, first apply ʻevercure EM22ʼ or equal approved by dws : sa, to manufacturerʼs specification. 8.! All showers to have ʻCoproxʼ, or equal approved by dws : sa cementitious waterproofing system applied to slab, dressed up shower tray sides and into outlet. System to be applied by specialist sub-contractor and strictly according to manufacturers detail and specification. 9.! External brickwork walls are to be 220mm. The outer face of the inner skin to be bagged and waterproofed with ʻBrixealʼ, or equal approved by dws : sa. Ties, ʻbrickforceʼ, or equal approved by dws : sa and reinforcement around openings all to be according to structural engineerʼs detail and specification. 1.! The design and installation of drainage and plumbing is to comply with SANS 255 external floor mounted flood light 2 750 external floor light flush mounted adjustable wall to be demolished external floor light flush mounted H9 ex wall to be demolished H9 ble brick light vertical LOCAL AUTHORITY APPROVAL: 10.! All recesses in brickwork housing rain water pipes [RWP] is to be waterproofed to dws : saʼs approval. dou V brick light horizontal new RC retaining wall ceiling/soffit fitting recessed adjustable H wall of basement ceiling/soffit fitting recessed 500mm thk continious piling to eng detail ceiling mounted fitting adjustable Storm water concrete channel in basement. Alpha channel with Mentus grid ceiling mounted fitting connection with the project remain the property and copyright of designworkshop : sa , subject to their use by the client for the particular project to which this document relates, and the client shall not be entitled, either directly or indirectly, to make use of the document(s) for any additional or similar works or publish the same except with the prior consent from designworkshop : sa . under all window cills in accordance with SANS 10400 K, SANS 248, 298 and 952. External walls to have stepped DPC, one course below all window openings. Foundation walls to have ʻbrickforceʼ, or equal approved by dws : sa every 3rd course and walls every 4th course. All roof trusses to be fixed using hoop iron built into 6 courses of brickwork. Neoprene closer to suit profile at ridge cap, flashing and eaves of roof. All concrete roofs to be covered with ʻDerbigum SP4ʼ, or equal approved by dws : sa waterproofing membrane fully sealed to deck through torch-on fusion, side laps 75mm and end laps 100mm. Turn-ups and turndowns ! Materials. A certificate of compliance is to be issued to dws : sa on completion of the work. FOR : CLIFTON SCHOOL CLIENT : Clifton School ARCHITECT : Mark Horner 6831 rate no. reg no. PLAN Level 0 (Lambert Rd) 340_Clifton Phase 1_01 [mms.designworkshop.co.za] | 6:22 PM | 2013/05/02 W drawn checked VS -- date scale 13|03|16 1:100 job no. stage zone 340 M 04 GN 501 series family rev. 00 designworkshop : sa 94 florida road l durban | 4001 | south africa +27 [0]31 303 5191 l t +27 [0]31 303 5198 l f [email protected] l e