Preview only show first 10 pages with watermark. For full document please download

Quick Installation Guide

   EMBED


Share

Transcript

500 Mbps Powerline Ethernet Bridge QUICK INSTALLATION GUIDE LEDs LIGHT INDICATOR DEFINITION Power LED ESTABLISH POWERLINE NETWORK Step 1 Plug the PLC adapter into AC outlet and connect to router or broadband modem with an Ethernet cable (provided) Ethernet Link/Act LED ON: Ethernet link detected PLC LED ON: Linked w/ other PLC device Smart TV Modem / Router Group Button Press 1~3 secs to join the encrypted PLC network. Press over 10 secs to create the encrypted PLC network. Step 2 Plug another PLC adapter into AC outlet and connect it with networked device such as Blu-ray player, Gaming console Smart TV or Freeview Plus Set-Top Box. Reset Button Press 1~3 secs to reset to factory default CREATE AN ENCRYPTED PLC NETWORK GROUP LAN Port BEFORE GETTING STARTED Internet Make sure that router is connected to the Internet. User can easily create an encrypted PLC network with 128-bit encryption for network security and data protection. Simply press GROUP button on adapters to set up hassle-free PLC encrypted network. To do so, please follow below steps! Modem / Router A B GROUP button GROUP button Step 1 Do Not plug PLC adapter into “surge protector”. PLC data transmission might be blocked. TROUBLESHOOTING What if Powerline adapters are not connected? Make sure PLC LED is on. If not, a. Verify that PLC adapters are plugged into a power outlet directly. b. Press RESET button for 2 seconds to recovery to default settings. c. Shorten the distance between PLC adapters. For Instruction Manual go to Press GROUP button on both adapters over 10 secs until LED light turns off and on at once to generate new encrypted PLC network. (PLC LED light will be off) Step 2 Press GROUP button of adapter A again for 1~3 sec to start pairing procedure. (Power LED will start blinking) Step 3 Press GROUP button of adapter B for 1~3 sec to start pairing procedure. (Power LED will start blinking) Once Pairing procedure is completed, both PLC LED lights will be on. http://www.zinwell.com.tw/manual/PLQ-5100D_UM.zip IB04462399-0