Preview only show first 10 pages with watermark. For full document please download

Rack Standoff Brackets

   EMBED


Share

Transcript

Rack Standoff Brackets Part Number(s): RSB1A, RSB1B, RSB1C INSTALLATION INSTRUCTIONS © Panduit Corp. 2012 CM565 2.9” 1.6” Top View 5.3” Top View RSB1B RSB1A All Rack Standoff Bracket Kits contain the following components: • (2) 1RU Mounting Brackets • (4) #12-24 X 1/2" Bonding Screws Brackets are designed to mount 1RU equipment. Top View RSB1C Multiple RU equipment will require (2) sets of Rack Standoff Brackets. Installing Standoff Brackets to Rack Install brackets on rack using #12-24 X 1/2" Bonding Screws at desired RU location. Notes: Minor flanges on brackets must be placed inward toward the rack center as shown. Rack brackets must align horizontally. Rack Standoff Brackets #12-24 X 1/2" Bonding Screws Detail View #12-24 X 1/2" Bonding Screws For Technical Support: www.panduit.com/resources/install_maintain.asp Page 1 of 2 INSTALLATION INSTRUCTIONS © Panduit Corp. 2012 CM565 Securing Standoff Brackets Installing 1RU Horizontal Equipment Using a phillips screwdriver through the front clearance holes in the bracket, tighten the #12-24 Bonding Screws. The clearance holes are obround and are at the top and bottom of the bracket. Install 1RU horizontal equipment (horizontal manager, patch panel, blanking panel, etc.) onto brackets using screws supplied with the piece of equipment being installed. Phillips Screwdriver 1RU Horizontal Manager Screws supplied with horizontal equipment Completed Assembly The Rack Standoff Brackets are designed to mount horizontal managers spaced off of rack equipment rails in order to match up the front of the horizontal managers with the front of the vertical managers. Standoff bracket selection to have vertical cable manager and horizontal cable manager finger and door alignment PatchRunner High Capacity Vertical Fully back Standard mounting extended Mounting position on Fully forward extended rack Standoff Bracket to use RSB1A RSB1B RSB1C Top View Installing Multiple RU Horizontal Equipment Using Rack Standoff Brackets Multiple RU equipment will require (2) sets of Rack Standoff Brackets. These will be mounted on the outer ends of the equipment as shown. 3RU Horizontal Manager (2) Rack Standoff Brackets mounted to each side E-mail: [email protected] For Instructions in Local Languages and Technical Support: www.panduit.com/resources/install_maintain.asp www.panduit.com Page 2 of 2 Fax: (708) 444-6448