Preview only show first 10 pages with watermark. For full document please download

Rear Of Leviton 48-port Quickport Patch Panel

   EMBED


Share

Transcript

Cable Management Suggestions – Rear of Leviton 48‐port QuickPort Patch Panel  By Dan Underbrink, RCDD, Principal Applications Engineer, Leviton Network Solutions            Rack‐mount the QuickPort Patch Panel and install the Cable Management Bar at the rear of the  panel  Split the cable bundle before routing it to the rack; Jacks that will terminate to the right side of  the panel route down the right side of the rack. Jacks that will terminate on the left side of the  panel route down the left side of the rack.  Start with bottom row of patch panel ports  Seat the jacks of the first 6 terminated cables (far right in picture below) into the first 6 ports  Velcro this bundle of 6 cables to the bottom of the Cable Management Bar, and dress cables  into the vertical cable manager on the right  Install and dress the next group of 6 in a similar fashion, taking them again to the right vertical  cable manager  Now move to the left and install and dress the leftmost group of 6 cables first, then the final  group of 6 on the bottom row of the patch panel  Each of these groups of 6 cables is Velcro‐ed to the bottom of the Cable Management Bar, as  shown below                         Next route terminated cables to the top row of patch panel ports  Install the first 6 on the right and route the cables over the top of the Cable Management Bar  Velcro this bundle in place to the top of the Wire Management Bar, and dress it into the vertical  cable manager       Then do the same with the next bundle of 6 on the right      Do the same with the leftmost group of 6 cables  And then the remaining group of 6 cables         The picture below shows the entire rear of the patch panel with the cables properly routed and  dressed