Transcript
Installation E19-230DC Freestanding Eyewash with Dust Cover Table of Contents Pre-Installation Information . . . . . . . . . . . . . . . .2 Installation Instructions . . . . . . . . . . . . . . . . . . . .3 Assembly of Components . . . . . . . . . . . . . . . . . .4 Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
215-160DCE Rev. K; EN 06-532E © 2007 Bradley Corporation Page 1 of 4 4/24/07
P.O. Box 309, Menomonee Falls, WI USA 53052-0309 PHONE 1-800-BRADLEY FAX (262) 251-5817 http://www.bradleycorp.com
E19-230DC
Installation
WARNING Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.
Installation
! ! ! !
Packing List
IS TH SIDE UP
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts. Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff. The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.
P.O
Da Da te Da tum te
TES
Sig ned Sig ned ned
. Box DIE ESS SEST THI 309 Tes AI S Rep t-op HEBGER UNI , Me Ven ort DO ÄT T EAC nom dur til(e anyera 1ST te MA one H Tes ch val DAI WÖ WE sig e Un ) wö ma ve( RE CHE EK Fal un ne t le ters che lfun s) ls, NTL rap en fon chr ntli ctio eac WI por basctio ICH ns h ift. ch 530 t imm. nne ZU immwe Jeg im S'il 51 ek me PRÜ lichTes edi and édi y nt Sig FEN ate ateà que des e tbe Stö trie ly. sig Un ned . me lqu n Sig ter nt. e valves run b prü bel g ne sch cho ow sof fen rift . se cha ort , bes qui que Da me ne sem lde täti Da te va ain n. gt Da te pas e te Sig fait et
R
The inspection and testing results of this equipment should be recorded weekly to verify proper operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com 114-051
Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358.1. For questions regarding the operation or installation of this product, visit www.bradleycorp.com or call 1-800-BRADLEY. Product warranties may also be found under ”Product Information” on our web site at www.bradleycorp.com.
2
4/24/07
Bradley Corporation • 215-160DCE Rev. K; EN 06-532E
Installation
E19-230DC
Installation Instructions NOTE: Flush the water supply line before beginning installation.
95mm (3-3/4")
Supplies Required: • Pipe sealant • Piping to 1/2" BSP water supply inlet on unit • Piping to 1-1/4" BSP drain outlet for eyewash • Sign-mounting hardware
Ø 273mm (10-3/4")
546mm (21-1/2")
Step 1: Assemble eyewash components
438mm (17-1/4")
1. Assemble eyewash components as shown in Figure 2 on page 4. • Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.
222mm (8-3/4")
NOTE: The top of the eyewash heads should be positioned (1067mm (42") from the floor.
Step 2: Connect water supply 1. Connect the water supply piping (supplied by installer) to the 1/2" BSP inlet on the eyewash (see Figure 1). 2. Connect the drain piping (supplied by the installer) to the 1-1/4" drain outlet on the eyewash. 3. Mount the safety sign to the wall using sign-mounting hardware (supplied by installer). 4. Open the water supply lines. Test for leaks and adequate water flow.
133mm (5-1/4")
184mm (7-1/4") 1067mm (42") Suggested Height To Floor
927mm (36-1/2") Suggested Height To Floor
Figure 1
Bradley Corporation • 215-160DCE Rev. K; EN 06-532E
4/24/07
3
E19-230DC
Installation
Assembly of Components and Parts List
3
1.7
2 1
1.6
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN. ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below. Report any malfunctions immediately. Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden. Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
1.5
Date Datum Date
Signed Unterschrift Signe
Date Date Date
Signed Signed Signed
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA TEL: 1-800-BRADLEY FAX: (262-251-5817) http://www.bradleycorp.com
Flow Control This End
114-051
1.12
1.4 1.3 1.8
1/2" BSP Supply Inlet (BSP threads are noted with a black line)
1.9 1.2 1.1
HANDLE NOTE: Close the cover and put the pin through the clip to keep closed.
1.13
1.14 1.131 1-1/4" BSP Drain Outlet
1.16
1.10
1.15
1.11
NOTE: Items 1.1–1.15 come preassembled as Item 1.
Figure 2
Item 1
Part No.
Qty
Description
Item
Part No.
Qty
Description
S39-310E
1
Dust Cover/Receptor Assembly
1.10
113-006LQ
1
Pipe 1/2" NPT x 3-1/2" Long
1.1
111-039BSP
1
Inlet-Drain Fitting
1.11
169-025
1
Elbow 1/2" NPT Street
1.2
124-028
1
Gasket
1.12
S30-072B
1
1/2" Valve/Handle Prepack
1.3
S90-009
1
Dust Cover Assembly
1.13
S27-282B
1
1/2" Ball Valve with Nut
1.4
173-009
1
Cup Strainer
1.131
110-215
1
Nut only
1.5
S21-071
1
Supply Stem
1.14
S08-367
1
Handle Assembly
1.6
113-1159
1
Spacer, Drain
1.15
142-002DA
1
Lockwasher
1.7
S05-091
1
Eyewash Yoke
1.16
153-372R
1
Adapter
1.8
269-447
1
Bumper
2
204-421
1
Emergency Tag
1.9
161-025
1
Hex Nut
3
114-051E
1
Safety Sign
Prepack S45-1782 includes Items 1.2, 1.4, 1.5, 1.6 Prepack S30-087 includes Items 1.131, 1.14, 1.15, 1.16 Item 1.12 includes Items 1.13, 1.131, 1.14, 1.15, 1.6
4
4/24/07
Bradley Corporation • 215-160DCE Rev. K; EN 06-532E