Sandvik DL311-7 Underground Drill Rig
Sandvik DL311-7 is an electro-hydraulic longhole drilling rig for small and medium scale production drilling in underground mines. The rig is capable of drilling 64-89 mm holes up to 38 meters. The rig has been designed for vertical and inclined plane rings and fans and also for parallel long production holes as well as for long single holes. The robust ZR 20 boom has 2 meters parallel drilling coverage. The 360° rotation in full parallel coverage area and wide tilt angle ranges forward and backwards make the boom suitable to various drilling applications. Simple and proven technical solutions ensure efficient and reliable operations. The rigid boom and feed construction together with innovative centralizer gives optimal drilling accuracy. Good stability characteristics enables fast tramming even in challenging road conditions. Tramming is done from the operator’s platform and drilling from a remote panel. The new carrier is designed for better access to the daily service points.
1/4
Carrier
NC5
Rock drill
HL710
Boom
ZR20
Drilling module
LFRC700
Control system
TPC LH 5
Hole diameter
64-89mm
Drilling hole length
Up to 38m
Cornering
3200mm
Total weight
17 000Kg (depending on options)
© 2011 Sandvik Mining and Construction
Technical Specification 7-6328-B 2011-08-23
Technical Specification
Sandvik DL311-7
7-6328-B 2011-08-23
General dimensions FOPS/ROPS certified position* Seated operation Standing operation
H From 2430 to 3100 From 2930 to 3100
45°
30°
*The min.FOPS/ROPS height are marked with red paint on the canopy tube
485
SANDVIK
360°
DL 311
3100 2150
1615
1830
180
1600 2810
All dimensions in mm
3100
15° 880
9590
30°
9810
Hydraulic rock drill Rock Drill Percussion power Percussion pressure Percussion rate Rotation speed Rotation torque Hole size Shank adapter Weight Flushing water pressure Shank lubrication device Shank lubrication compressor *Power extractor
Boom Boom Parallel coverage Feed extension Boom weight Rotation angle Stinger extension
Overall length LF
Overall length LF LF704 2940 LF705 3240 LF706 3550
Drilling module
Technical Specification 2_1750
LFRC 700x Capacity Feed force Rod retainer Cuttings collector Readiness for double tools Sequence control
HL710 19.5 kW 190 bar 42-52 Hz 0...180 rpm Max. 1095 Nm (OMT200) Max. 1335 Nm (OMT250) Max. 1765 Nm (OMT315) 64 - 89 mm T38, T45, T51 245 kg 20 bar Air /oil mist SLU CT10, 1m³/min (7 bar) HL710
*Front stinger
x=4’ / 5’ /6’ 20+1 rods/tubes 31kN Pito 5 CC705 Rods/Tubes Automatic rod/tube changing LF704-1700mm LF705/6-2000mm
*Instrumentation options
Technical Specification 5_9250
*Angle
TIS DDS (drilling direction, depth and speed) with data logging
*Visual angle indicators
Spirit levels
*Greasing systems and options *Greasing unit with reel, pump and nozzle *Automatic greasing system
Technical Specification 4_1820
ZR20 2000mm LF704: 985mm LF705: 1050mm LF706: 1200mm 2 200kg 360° 1500mm
Manual Carrier, boom and cassette
*Cleaning system *Pressure cleaning system with reel *High pressure cleaning system with reel *Optional features/components
2/4
Max. 15 bar (11 bar additional to mine water network) Max. 180 bar
Technical Specification
Sandvik DL311-7
7-6328-B 2011-08-23
Tramming dimensions
3100
2830 1830 1945
3200
750
15°
8900 9120 (with greasing unit option)
750
40° 3240
15°
320
5830 5980 2510
2145
All dimensions in mm
Hydraulic system Filtration size Oil cooler Hydraulic oil tank volume Tank filling Powerpack Percussion pump Rotation pump *Biodegradable oils
Electric system and *options Total input power Main switch Standard voltages Voltage fluctuation Positioning lights Automatic cable reel
20 micron (pressure) 12 micron (returns) Cooling capacity 30kW OW30 water cooler 180 liters Electric pump HPP555 (55kW) 130 l/min (variable) 60 l/min (variable) Shell Naturelle HFE
Cable reel control (in & out) *Electric cable rubber or PUR
Control system Type Power control Anti-jamming control Rotation control Flushing control
70 kW MSE 5 380-690 VAC ± 10% 2xLaser type TCR I Operator station and rear of unit 80, 100, 150 meters depending on voltage
*Ground fault and overcurrent VYK protection *Star delta starting 380VAC - 575VAC Powerpack starts only when *Electric power interlock jacks are on ground *Optional voltage 1000 VAC, 50 Hz 230V outlet Max.4500VA *Optional outlet 3-phase outlet, network voltage
TPC LH5 Adjustable full power Adjustable collaring power Adjustable anti-jamming pressure Adjustable rotation speed Water flushing pressure Air-mist flushing, (option)
Flushing system and *options
*Fire suppression system and options
Flushing Water pump
*Manual fire suppression 6 nozzles system (Ansul) *Automatic fire suppression 6 nozzles system (Ansul) *Hand held fire extinguisher 6 kg
Water pump capacity Inlet pressure *Compressor *Air mist flushing packages *Optional features/components
3/4
Water WBP2 (4 kW) 100 l/min (12 bars on top of mine network pressure) 2-7 bar (while drilling) CT16 (11kW, 1.6m3/min) For external or internal supply of air and water
Technical Specification
Sandvik DL311-7
7-6328-B 2011-08-23
Coverage area
Minimum drift size
Drilling module H W Wp LF 704 3150 3150 1460 LF705 3450 3450 1760 LF706 3750 3750 2000 Included 100m clearance on each side
Hr 1620 1620 1620
Maximum drift size Drilling module H W Wp Hr LF 704 3700 4800 2000 1740 LF705 4000 5100 2000 1740 LF706 4150 5250 2000 1740 With rear stingers in use without optional front stinger
530 775 1990 1750 3310
30°
2000
620
30°
All dimensions in mm
Carrier
Safety canopy Controls Sound pressure level according to EN791 Seat * Seat
FOPS Drilling and tramming Operator station: 97 dB(A) Emitted: 115 dB(A) Ergonomic, adjustable with seat belt Seat with arm rests T back seat
Carrier name Carrier type Transmission Axles Tyres Diesel engine Diesel engine control Exhaust catalyzer
12 km/h on horizontal 14% = 1:7 = 8° 5km/h Max. 15° / 5°
Brakes
Tramming Tramming speed Gradeability / Inclination
Lights Front working lights Front driving lights Rear working lights Rear driving lights
2x35W HID (24V) 2x35W HID (24V) 2x70W (24V) 2x70W (24V)
Ground clearance Rear oscillation Frame steering Fuel tank Tramming hydraulic oil tank
*Packages *Harsh water options (level 1) *Harsh water options (level 2) *Harsh water options (level 3) *Regional
Oil cooler + boom cylinders
Hydraulic jacks
Level 1 + steering and jacks cylinders Level 2 + main switchgear cabinet + cable reel (TCR) + greasing cleaning reel (when applicable) LAM, USC, AUS, EUR
*Diesel engine *Brake release *Fast filling systems *Automatic water hose reel *Water hose 32mm (1¼”) *Wheel chocks and holder *Automatic reversal of the fan rotation for cleaning *Battery jump start *Foam filled tyres *Spare wheel complete
Extra items Spare rock drill Spare wheel assembly Special tools for rock drill
Standard or foam filled
*Optional features/components Sandvik Mining and Construction reserves the right to change this specification without further notice.
Sandvik Mining and Construction Oy P.O Box 100. FIN-33311 Tampere, Finland Tel. +358 205 44 121, Fax +358 205 44 120 www.sandvik.com
4/4
NC5 Wheel mounted, frame steering Hydrostatic, automotive Spicer 112 / Spicer123 12.00-20 Deutz BF4M2012, Tier II, 74kW Electronic, EMR Standard Service, hydrostatic and positive braking Parking and emergency, hydraulic oil immersed multiple discs brakes on both axles 320 mm ± 10° ± 40° 80 liters 55 liters Outriggers on the boom (front) Vertical (rear) Deutz TCD 2012, Tier III, 74kW Manual hand pump For fuel/complete (Wiggins) THR 80 meters 2 pieces
© 2011 Sandvik Mining and Construction
Operator’s station