Transcript
SAPPHIRE ROUND CORNER SLIDING SHOWER DOOR INSTALLATION GUIDE
CAUTION
It is the responsibility of the INSTALLER to ensure that the installation complies with council and or local authority bylaws.
Instructions, drawings, and diagrams contained in this manual present information available at the time of printing. Although every attempt has been made to keep them up-to-date, Kohler Company reserves the right to implement product changes without further notice.
1089610 - C May 2009
Page 1
Kohler Co.
BEFORE YOU BEGIN Before you install your shower door, please read these instructions carefully to familiarise yourself with the required tools, materials and installation sequences. These instructions contain important care and cleaning information. Please leave these for the consumer after installation. Make sure that the shower tray and the wall are completely finished prior to installing your SAPPHIRE shower door. CAUTION: Risk of injury or product damage. Tempered glass cannot be cut. CAUTION: Before commencing installation. KOHLER strongly recommends reading these installation instructions. ATTENTION: Please install this door on an ENGLEFIELD Quick-Fit® shower tray only. IMPORTANT: The shower door requires a flat and vertical wall surface. The flatness is recommended to be out by no more than 4mm / m.
TOOLS AND MATERIALS REQUIRED Tools Required. Philips Screwdriver. Pencil. Silicone gun. Measuring tape. Safety glasses. Center punch. Hammer. Knife. Drill bits. 1 x 6mm. 1 x 2.5mm. Level. Materials Required. Drop cloth. SIKA Silaflex NG silicone sealant. 1089610 - C May 2009
Page 2
Kohler Co.
2005/2/25 13 ROUGH-IN
B
A
DIMENSION ‘A’ 872 ± 7.5mm 972 ± 7.5mm 872 ± 7.5mm
DIMENSION ‘B’ 872 ± 7.5mm 972 ± 7.5mm 1161 ± 7.5mm
MAX. DOOR OPENING 480mm 500mm 480mm
1830mm
SIZE 900 x 900 1000 x 1000 1200 x 900
B
Top rail
A
46.5mm
Bottom rail
25mm
Elevation
1089610 - C May 2009
Plan view
Page 3
Kohler Co.
PARTS IDENTIFICATION
PARTS IDENTIFICATION
Stopper Screw ST 3.9 X 12 mm
Right door stop
Left door stop
Top and bottom rail
Corner cover, top left
Corner cover top right Door entry seal
Wall retainer
Clip screw ST 4.2 X 9.5 mm
Top and bottom rail seal* Infill glass
Wedge Infill glass screw ST 4.2 X 16 mm
Door Seal Top roller sets*
Wall anchor
Wall retainer screw ST 4.2 x 28mm
Door Handle*
Corner cover clip
Screw cover
Wall retainer seal
Corner cover clip
Return seal
Bottom roller sets*
Corner cover bottom right Door panel assy right
Corner cover bottom left
1089610 - C May 2009
Door panel assy left.
Door edge cap
Magnetic seal
Page 4
Kohler Co.
DOOR INSTALLATION 1. Mark and drill wall retainer fixing holes Measure and mark a line on the rim of the tray using the following dimensions (all dimensions are measured from the acrylic wall face): SIZE 900 x 900 1000 x 1000 1200 x 900
DIMENSION ‘C’ 862mm 967mm 1154mm
Pencil
DIMENSION ‘D’ 862mm 967mm 862mm
Wall retainer
Level
right hand tray shown
Align the outside face of the wall retainer with the mark on the rim of the tray.
Inside of tray
Using a level, plumb the wall retainer, and mark the three mounting holes with a pencil.
D
Use a 6mm drill bit to drill the holes.
C
Outside of tray
Press fit the wall anchors into the holes. Repeat this procedure for the other wall retainer.
Shower Tray
2. Install the wall retainers. Install each wall retainer by aligning the holes in the retainer with the wall anchors.
Wall retainer screw.
Secure the wall retainers wth 6 x ST 4.2 x 28 mm screws provided.
ST 4.2 x 28 mm
B
1089610 - C May 2009
Page 5
Kohler Co.
3. Install the bottom rail. Press fit the bottom rail into the wall retainer on the tray.
B
Note: Make sure there are seals in each end of the top and bottom rails,and the end of the seal aligns with the end of the rail.
Seal Rail
4. Install the infill glass Press fit the infill glass to the bottom rail.
B
Note: Make sure that the fixing holes in the glass align with the holes in the bottom rail.
1089610 - C May 2009
Page 6
Kohler Co.
5. Install the top rail. Press fit the top rail to the top end of both glass infill panels. Make sure that the glass infill panels align with the end of the rails.
B
6. Adjust the top rail. To make sure that the rails are correctly fitted to the glass infill panels, use a tape measure to make sure the total height of the assembled product is 1830 mm. If higher, try pressing the top rail onto the glass infill panels harder.
1830 mm
1830 mm
If lower, insert a wedge into the gap between the glass infill panels and the top rail seal.
1830 mm
B
1089610 - C May 2009
Page 7
Kohler Co.
7. Fix the top and bottom rails to the glass infill panels. Use a power drill on a low torque setting to drive the countersunk screws into the top and bottom rails 8 places.
ST 4.2 x 16 mm
Take care not to over drive these screws.
ST 4.2 x 16 mm
8. Install the wall retainer seals Press fit the wall retainer seals into the wall retainer.
Ensure the seals are fitted with the soft edge in contact with the face of the glass, as show in the illustration on the right hand side.
Soft edge of retainer seal
1089610 - C May 2009
Page 8
Kohler Co.
9. a) Referring to the diagram below, cut the return seals to the length leaving a 3 - 5mm notch at the bottom so that the fexible flap overlaps the curved still extrusion. Return seal b) Press fit the return seals onto the vertical edges of both return panels. The flexible flap should point inside shower.
Flexible flap
Notch 3-5mm of rigid portion at bottom of seals so that the flexible flap overlaps the sill extrusion (right hand seal shown).
Return seal (right hand)
Return panel
Sill extrusion
10. Install the door panels. Identify the left door from the right door, referring to the handle location. Note that the rollers on the top edge are height adjustable. A) From the inside of the shower, hang the door panel on the top rail. B) Press the button on the bottom rollers and fit the rollers into the bottom rail. C) If there are gaps between the doors, raise or lower the doors by adjusting the screws in the top rollers (clockwise to raise the door). Once done there should be no gaps between the doors, and the top edges must be level.
C
D) Press fit the door seals onto the vertical edges of both doors.
A D
B
1089610 - C May 2009
Page 9
Kohler Co.
11. Install the corner cover clips. Move the bottom rail forward or backward to make sure that the gap between the bottom rail and the front edge of the tray is even.
ST 4.2 x 9.5mm
Make sure that the edges of the infill glass are vertical. Drill a 2.5mm hole through the small holes at the top and bottom ends of the retainers, and into the top and bottom rail.
ST 4.2 x 9.5mm
Take care to not drill all the way through the retainers! Fix the corner cover clips to the retainer. Make sure that the pin on the back of the clip aligns with the large hole at the top and bottom end of the retainer.
ST 4.2 x 9.5mm
12. Sealing the door. CAUTION: Use only Sika Silaflex NG Silicone Sealant. CAUTION: Apply silicone to the outside of the door only. silicone applied to the inside of the door will cause leakage and damage. Thoroughly clean all surfaces. Remove all dust, dirt or grease from the bottom rail, retainers and shower tray. For best results apply masking tape to within 5mm of the joints to be sealed. Apply a bead of sealant around the outside of the door where: 1. The bottom rail meets the tray. 2. The retainers meet the wall and the tray. 3. In and around the bottom corners where the retainers meet the bottom rail, and behind the corner cover caps. NOTE: Allow silicone to cure for 24 hours before using shower. Apply silicone along the broken line
1089610 - C May 2009
Page 10
Kohler Co.
13. Fit door entry seals and corner covers. Press fit the door entry seals into the channel in the top side of the bottom rail, and the underside of the top rail. Press fit all four corner covers over the corner cover clips.
1089610 - C May 2009
Page 11
Kohler Co.
CLEANING INSTRUCTIONS Use non abrasive soap and water when ever possible. In addition you may safely use: • Mr Muscle Shower Clean (branded as Windex Shower Clean in Australia). • Jif Powerspray. Avoid: • harsh chemicals and disinfectants. • abrasive cleaners. • solvent based cleaners. • acid or alkaline cleaners. • products containing ammonia or peroxides. Wipe out the unit after each use to prevent build-up of scum. Always read the label instructions on any cleaner carefully before applying it to the surface. Use a squeegee or dry towel to dry the glass after use. Regularly wash down the extrusions with warm water and mild soap solution. Where greasy deposits are concerned, cleaning may require a soft cloth dipped in white spirits. Thoroughly rinse with water after cleaning to ensure removal of all residues.
CALL US FOR HELP NEW ZEALAND KOHLER NZ Ltd. Ph 0800 100 382 Fax 0800 664 488 www.englefield.co.nz
1089610 - C May 2009
AUSTRALIA
KOHLER Co. Ph 1300 362 284 Fax 1300 652 284 www.englefield.com
Page 12
Kohler Co.