Preview only show first 10 pages with watermark. For full document please download

Schematic Layout Portoflio E-book_final_rev3

   EMBED


Share

Transcript

Building Schematic Layouts for Temporary Power & Lighting Planning. Our Custom Solutions Legend 1) 50 KVA Transformer / PDU 2) 50 A PDU 3) High Bay Lighting 4) Room Lighting 5) Cable Protectors 6) Cordset: 50 A Distribution Functional Description 1) 50 KVA Transformer / PDU 2) 50 A PDU 3) 400 W High Bay Light 4) LED Tube Stringlight 5) Cable Protector 6) 50' PDU Cord Set 7) 100' Tool / Light Industrial Cord Set Ericson Part Number EC2SPX43050XXPL3121 GWO 1004 MHXPS 817-5-LEDSL-143100-1 CP4-36-ED 63BSO 1510P123D Ericson Description E-Cart2 Transformer PDU 50 A Power Distribution Center 400 W Metal Halide Pulse Start 100' LED Tube Stringlight, (10) 2' Lights 3' Industrial Duty Cable Protector 50', 50 A, #6/3 – 8/1 SO 100', 12/3 SmartMonitor Cord Set Quantity 2 4 24 25 65 4 36 7) Cordset: Tool and Lighting Temporary Power and Lighting Layout: Floors 2 - 14 EPS 130 Our story is built around you. Our customer. We believe in listening, implementing and adapting. We are a customer driven, sales driven, innovative industry leader committed to “exceeding customer expectations.” Our in-house Applications Engineering team is available to assist you in providing design and layouts from off shelf products to custom power distribution units. Ericson emphasizes 3rd party NRTL Agencies to demonstrate our commitment to safety. UL, ETL, CSA and QPS listings as well as NEC/CEC and OSHA/Workers Compensation Code Compliance are integrated into every design. Our Schematic Layouts 8 RESTRICTED 7 6 5 4 3 2 1 THIS P RINT IS PROPRI ETRY AND CON FIDENTIAL AND MU ST NOT BE COPIED OR ITS CONTENTS REVEALED TO UNAUTHORIZED PERSONNEL W ITHOUT WRITTEN CONSEN T OF ERICSON MANUFATU RING CO. IT IS TO BE RETU RNED TO ERICSON MANUFACTU RING UPON REQUEST. Legend 1) 75KVA Transformer / PDU D D Fed by 480V 3φ from 112.5KVA 2) 50A PDU 3) 120A PDU C C 4) String Lighting 5) Low Bay Lighting B B 6) Cable Protectors Summary of Floor 2 QTY (2) 120A 120/208V 3φ PDU - (2) 50A 120/240V 1φ PDU Feed - (6) 20A 120V 1φ Duplex QTY (36) 250W MH Low Bay Lights QTY (1) 190A 120/208V 3φ PDU - (4) 50A 120/240V 1φ PDU Feed - (6) 20A 120V 1φ Duplex REVISION DESCRIPTION DATE BY CHKD ECN NO. A TOLERAN CES FRAC. ± 1/64' .X ± .015 .XX ± .010 .XXX ± .005 ANGLE ± 1° UNLESS OTHERWISE SPECIFIED 8 7 6 DWG. APPROVALS QTY (108) 20A 120V Cordsets - 100FT Length DATE 8) Tool & Lighting Cordset DWG. TITLE ALNYLAM PHARMACEUTICALS TEMPORARY POWER & LIGHTING REV. DRAW N ENERGIZE, PROT ECT, ILLUMINAT E, CONNECT CHECKED ERICSON MANUFACTURING COMPANY 1-800-ERICSON WWW.ERICSON.COM 5 7) 50A Cordset QTY (12) 50A 120/240V Cordsets - 100FT Length QTY (2) 50FT Stringlights - (5) Lights - 10FT Spacing QTY (15) GWO 50A 120/240V 1φ PDU - (6) 20A 120V 1φ GFCI Duplex - (1) 30A 240V 1φ Twist-Lock - (1) 50A 120/240V 1φ Feed-Thru REV. QTY (3) 50A 120/240V Cordsets - 50FT Length QTY (4) 100FT Stringlights - (10) Lights - 10FT Spacing 4 3 SCALE 1=1 PROJ. NO. --//-- SHEET 1 OF 1 2 A REV. DWG. UNIT NO. 18884 – 2 1 A Planning for a project isn’t easy, and we get that. Let us assist you in handling your temporary power and lighting with a simple schematic layout. Our experience can save you time and money. Our engineering staff understands the risks with dark passges, confined work spaces, rugged environmental construction sites. We also understand the needs for explosion proof, low power consumption, flexible magnetic mounting, light weight products and in consideration of electrical safety standards. Ericson can ensure your utilizing best practice on the job -site with basic off the shelf products or custom solutions to fit your needs and budget. By providing a schematic layout, all your temporary power and lighting needs can be designed accordingly offering options you might not have considered. Request for Airport Apron, Concourse & Mezzanine Level Temporary Power & Lighting Plan Apron Level Ericson received a request to scope out the temporary power and lighting for part of an expansion and facility improvements to an International Airport. The construction project was primarily on the Terminal Expansion including apron, concourse and mezzanine levels. Ericson offered their complimentary schematic design layout services to assist specifying the correct temporary power and lighting products needed to ensure a reliable and safe work environment for the project. Read more about the project on the next page. Concourse & Mezzanine Level Concourse Level The project consisted of running power from two sources: Mezzanine Level 1. Tower Power Crane at 480V/3 phase/200 amp 2. Existing duct bank with 4, 4” conduits back to a 480v transformer. The power sources were located at two different areas outside of the apron terminal. Ericson was able to feed power to Oscar Temporary Power Boxes to feed x number of stringlights and heavy duty lighting. For safety reasons, cable protectors were added to the specifications as an option. This job required to provide temporary power supply to three floors. Ericson was able to place Oscar-GWO’s as the main power source. Stringlights and LED work lights were placed set to electrical safety standards. Request for Temporary Power and Lighting for Data Center 8 RESTRICTED 7 6 5 4 3 2 1 THIS P RINT IS PROPRI ETRY AND CON FIDENTIAL AND MU ST NOT BE COPIED OR ITS CONTENTS REVEALED TO UNAUTHORIZED PERSONNEL W ITHOUT WRITTEN CONSEN T OF ERICSON MANUFATU RING CO. IT IS TO BE RETU RNED TO ERICSON MANUFACTU RING UPON REQUEST. Legend 1) 75KVA Transformer / PDU D D 2) 50A PDU 3) 200A PDU C C 4) String Lighting 5) Bay Lighting B B 6) LED Work Light Summary of Main Floor REV. QTY (47) Bay Lights - Low Energy LED - 150W QTY (6) 50A 120/240V PDU - (6) NEMA 5-20 Receptacles - (1) NEMA L6-30 Receptacle QTY (2) 100FT Stringlights - (10) Sockets - 10FT Spacing QTY (6) 50A 120/240V Cordset - 100FT Length REVISION DESCRIPTION DATE BY CHKD ECN NO. A TOLERAN CES FRAC. ± 1/64' .X ± .015 .XX ± .010 .XXX ± .005 ANGLE ± 1° UNLESS OTHERWISE SPECIFIED 8 7 6 DWG. APPROVALS DATE 8) Power & Lighting Cordsets DWG. TITLE FACEBOOK ATN-4 DATA CENTER MAIN FLOOR REV. DRAW N ENERGIZE, PROT ECT, ILLUMINAT E, CONNECT CHECKED ERICSON MANUFACTURING COMPANY 1-800-ERICSON WWW.ERICSON.COM 5 7) Cable Protectors NOTE: LED Bay Lights will provide approximately 12 foot-candles of illumination at floor level in shown configuration. 4 3 SCALE 1=1 PROJ. NO. --//-- SHEET 1 OF 1 REV. DWG. UNIT NO. 18991-1 2 1 B U.S. company requested Ericson to provide temporary power and lighting solutions for the construction of four new data centers. Ericson received drawings for the main floor/s & Penthouse floor/s which were all identical. Above you can see our schematic design layout which was created to set the baylites, stringlights, cordsets and our version of a spider box, the GWO for temporary power and lighting distribution. A Request for Temporary Power and Lighting for Data Center 8 RESTRICTED 7 6 5 4 3 2 1 THIS P RINT IS PROPRI ETRY AND CON FIDENTIAL AND MU ST NOT BE COPIED OR ITS CONTENTS REVEALED TO UNAUTHORIZED PERSONNEL W ITHOUT WRITTEN CONSEN T OF ERICSON MANUFATU RING CO. IT IS TO BE RETU RNED TO ERICSON MANUFACTU RING UPON REQUEST. Legend 1) 75KVA Transformer / PDU D D 2) 50A PDU 3) 200A PDU C C 4) String Lighting 5) Bay Lighting B B 6) LED Work Light Summary of Penthouse REV. A REVISION DESCRIPTION QTY (18) 100FT Stringlights - (10) Sockets - 10FT Spacing QTY (4) 50A 120/240V PDU - (6) NEMA 5-20 Receptacles - (1) NEMA L6-30 Receptacle QTY (7) 50FT Stringlights - (5) Sockets - 10FT Spacing QTY (4) 50A 120/240V Cordset - 100FT Length DATE BY CHKD ECN NO. TOLERAN CES FRAC. ± 1/64' .X ± .015 .XX ± .010 .XXX ± .005 ANGLE ± 1° DWG. APPROVALS DATE 7) Cable Protectors 8) Power & Lighting Cordsets DWG. TITLE FACEBOOK ATN-4 DATA CENTER PENTHOUSE REV. The overall challenge was custom cord sets and the need for custom temporary lighting solutions. The contractor had certain energy requirements for lighting products and the endB user was extremely specific in having high quality products for the job site. UNLESS OTHERWISE SPECIFIED 8 7 6 DRAW N ENERGIZE, PROT ECT, ILLUMINAT E, CONNECT CHECKED ERICSON MANUFACTURING COMPANY 1-800-ERICSON WWW.ERICSON.COM 5 4 3 SCALE 1=1 PROJ. NO. --//-- SHEET 1 OF 1 REV. DWG. UNIT NO. 18991-2 2 1 Ericson provided a temporary lighting layout, and offered additional product sources for temporary power and electrical safety. The implementation led to ordering of the temporary lighting and the customer is currently evaluating other products. By offering a schematic layout request, the customer saved time with the complimentary layout solution and was able to quickly implement temporary lighting on the job site with high quality products. A Ericson engineers and manufacturers temporary power & lighting products. Markets include: • Aerospace • PetroChem • Construction • Food & Beverage • Ship Building & Maintenance • Power Generation For more information on our complimentary schematic layouts, please email us at [email protected]. 4323 Hamann Parkway Willoughby, OH 44094 USA 1.800.374.2766 www.ericson.com