ADDENDUM NO. 3 November 06, 2015 TO: PLANS and SPECIFICATIONS for UNIVERSITY WELLNESS AND PARKS MULTI-PURPOSE RECREATION CENTER CAMPUS OF LINCOLN UNIVERSITY Jefferson City, Missouri TAA Project Number: 1501 The Architects Alliance, Inc. 631 West Main Street Jefferson City, Missouri 65101-1531 573-636-5000 Bidders are hereby informed that the construction plans and/or specifications are modified as follows: SPECIFICATIONS: 1. Section 03 30 00 – CAST-IN-PLACE CONCRETE, Paragraph 2.5 DELETE entire paragraph E. Color Pigment. 2. Section 03 30 53 – MISCELLANEOUS CAST-IN-PLACE CONCRETE, ADD entire section to specifications. Product shall only be used under WF-1. Reference attached copy of section. 3. Section 03 35 19 – COLORED CONCRETE FINISHING, DELETE the following: 1.3.B.1 Concrete floor color. 2.2.A. Concrete Floor Color… 4. Section 03 35 19 – COLORED CONCRETE FINISHING, Paragraph 2.1.A.1.d REVISE to read: Prosoco; Consolideck LS Guard plus PolishGuard (BASIS OF DESIGN) 5. Section 06 16 00 – SHEATHING, Paragraph 3.1. ADD the following paragraph H. 5/8” plywood sheathing may be adhered directly to insulation per contractor’s preference. Product must meet all qualities, operations and criteria as set forth in the specifications. 6. Section 07 41 10 – METAL ROOF PANELS, Paragraph 2.1. MANUFACTURERS; ADD the following manufacturer/product (note: substituted manufacturer/product must meet all qualities, operations and criteria as set forth in the specifications). a. Merchant & Evans, Inc. – ZIP-RIB Structural Standing Seam Roof & Wall Panel System b. DMI – TL2516 Standing Seam Metal Roof Panel c. MBCI – Superlok Standing Seam Metal Roof Panel 7. Section 07 41 10 – METAL ROOF PANELS, Paragraph 2.6.F Snow Guards ADD the following product (note: substituted manufacturer/product must meet all qualities, operations and criteria as set forth in the specifications). a. Alpine SnowGuards “SnowMax” System 8. Section 07 42 13 – METAL WALL PANELS, Paragraph 2.1.A.2 Steel Wall Panels; ADD the following manufacturer/product (note: substituted manufacturer/product must meet all qualities, operations and criteria as set forth in the specifications). Addendum No. 3 1501 Page 1 of 8 a. DMI – WP72 9. Section 07 42 13 – METAL WALL PANELS, Paragraph 2.1.B. Aluminum Soffit Panels; ADD the following manufacturer/product (note: substituted manufacturer/product must meet all qualities, operations and criteria as set forth in the specifications). a. DMI – VS-012 b. MBCI – 7.2 Panel 10. Section 07 54 23 – THERMOPLASTIC POLYOLEFIN (TPO) ROOFING, Paragraph 2.3.A DELETE the following “…fabric –backed…” 11. Section 07 54 23 – THERMOPLASTIC POLYOLEFIN (TPO) ROOFING, Paragraph 3.10.D.1.b. REVISE to read “peak gust wind speed exceeding 55 mph m/sec;” 12. Section 084113 – ALUMINUM FRAMED ENTRANCES, 2.13 Door Hardware Schedule; Group No. H: CHANGE: Door 002A to 029A. 13. Section 087100 – DOOR HARDWARE, 3.6 Door Hardware Schedule; Group No. 20: CHANGE: Lockset 9K37AB15DxS3 to 9K37D15DxS3 x US26D, Best. Group No. 50: CHANGE: Door 003A to 030A. Group No. 51: CHANGE: Door 005A to 032A. 14. Section 09 64 40 – WOOD ATHLETIC FLOORING ASSEMBLIES, Paragraph A MANUFACTURER; ADD the following product (note: substituted manufacturer/product must meet all qualities, operations and criteria as set forth in the specifications). a. Connor Sports, NeoShok (WF-1 Base Bid) b. Connor Sports, S-Channel (WF-1A Alternate #5) 15. Section 09 67 66 – POLYURETHANE FLOOR SYSTEM, Part 2.1.A MANUFACTURER; ADD the following product (note: substituted manufacturer/product must meet all qualities, colors, operations and criteria as set forth in the specifications). a. Dynamic Sports Construction, DynaForce 16. Section 09 77 20 – DECORATIVE WALL PANELS, DELETE the following: 1.1.A.2. Decorative thermoplastic sheets 2.1.B. Decorative Thermoplastic Sheet… 2.2.B. Decorative Thermoplastic Sheet… 17. Section 09 77 20 – DECORATIVE WALL PANELS,, Paragraph 2.2.A.1. REVISE to read “Color: From full range of The Classic Collection.” 18. Section 10 28 00 – TOILET, BATH, AND LAUNDRY ACCESSORIES, Paragraph 2.5 WARM-AIR DRYERS; ADD the following product (note: substituted manufacturer/product must meet all qualities, operations and criteria as set forth in the specifications). a. American Dryer #CPC9-SS 19. Section 10 70 00 – EXTERIOR SUN CONTROL DEVICES, Paragraph 2.1.B Available Manufacturers; ADD the following manufacturer (note: substituted manufacturer/product must meet all qualities, operations and criteria as set forth in the specifications). b. ASCA Inc. (Exterior Sun Control Devices). 20. Section 11 52 13 – PROJECT SCREENS, Paragraph 2.3.A.1. DELETE entire product a. Da-Lite Screen Co, Inc. Glass Beaded. Addendum No. 3 1501 Page 2 of 8 21. Section 12 24 13 – ROLLER WINDOW SHADES, Part 2.1 Section A.1 Basis of Design Product; should read “Basis of Design: Manufacturer: MechoShade Systems, Inc., Electro/3 Doubleshade #20 with fascia. “ 22. Section 12 24 13 – ROLLER WINDOW SHADES, Part 2.1 Section A.2 Manufacturer, Add the following product (note: substituted manufacturer/product must meet all qualities, operations and criteria as set forth in the specifications). a. Draper, Motorized Flexshade System, Dual Roller 23. Section 12 36 23 – PLASTIC-LAMINATE-CLAD COUNTERTOPS, Paragraph 2.1. DELETE Item J. Backer Sheet: Provide plastic-laminate backer sheet, NEMA LD 3, Grade BKL, on underside of countertop substrate. DELETE Item K. Paper backing: Provide paper backing on underside of countertop substrate. 24. Section 26 33 05 – BATTERY EMERGENCY POWER SUPPLY, paragraph 2.02, REVISE subparagraphs A. and B. to read as follows: a. Input Voltage: 120/208 Volts, 3-phase, 4-wire, 60 Hz. b. Output Voltage: 120/208 Volts, 3-phase, 4-wire, 60 Hz. 25. Section 27 10 00 – INSIDE PLANT CABLE AND EQUIPMENT, paragraph 2.03, REVISE subparagraphs D. and E. to read as follows: a. Data jacks shall be ORANGE in color for Lincoln University data jacks, GREEN in color for Parks and Recreation data jacks. b. Voice jacks shall be BLUE in color for Lincoln University voice jacks, YELLOW in color for Parks and Recreation voice jacks. 26. Section 27 10 00 – INSIDE PLANT CABLE AND EQUIPMENT, ADD new paragraph 2.16 as follows: 2.16 Standard Wall Mount Cabinet 1. Where indicated on Contract Documents, provide standard wall mount cabinets as specified herein to house cable termination panels and network electronics. The Contractor shall provide and install one (1) ¾" plywood backboard for each wall cabinet for support when mounting wall cabinet. a. The Contractor shall coordinate with General Contractor to install power outlet into cabinet. b. Cabinets shall be equipped with integral ventilation fan and 6-outlet, 20 amp rack mount power strip. c. Fan shall be Chatsworth 12804-701. d. Cabinet shall be Chatsworth 12787-536. 27. Section 28 13 00 – ACCESS CONTROL SYSTEM , ADD entire section to specifications. Reference attached copy of section. 28. Section 28 31 00 – FIRE ALARM AND DETECTION SYSTEM, paragraph 2.03, REVISE the first sentence of sub-paragraph A to read as follows: A. The FACP shall be as manufactured by Notifier, Simplex or FCI and shall contain a microprocessor-based Central Processing Unit (CPU). NOTE – the remainder of sub-paragraph A is unchanged. 29. Section 28 31 00 – FIRE ALARM AND DETECTION SYSTEM, paragraph 2.03, K, REVISE the first sentence of sub-paragraph 1 to read as follows: 1. The FACP shall be as manufactured by Notifier, Simplex or FCI and shall contain a microprocessor-based Central Processing Unit (CPU). NOTE – the remainder of sub-paragraph K is unchanged. Addendum No. 3 1501 Page 3 of 8 30. Section 28 31 00 – FIRE ALARM AND DETECTION SYSTEM, paragraph 2.02, sub-paragraph A, 2, DELETE the following sentence: 2. “Where required, all wiring shall be installed in conduit or raceway”. NOTE – the remainder of sub-paragraph A, 2 is unchanged. 31. Section 28 31 00 – FIRE ALARM AND DETECTION SYSTEM, paragraph 2.02, ADD new subparagraph 7 as follows : 7. When installed above accessible ceilings (lay in acoustical ceilings), fire alarm wiring shall be installed “open” (not within conduit). When installed in spaces having an exposed structure ceiling (except in the Gymnasium), fire alarm wiring shall be installed “open” (not within conduit). All fire alarm system wiring within the exposed structure areas of the Gymnasium shall be installed within EMT conduit as specified herein. All fire alarm system wiring installed above drywall ceilings shall be installed in EMT conduit as specified herein for its length of run over the drywall ceiling. All fire alarm wiring “drops” to wall mounted fire alarm devices shall be installed within EMT conduit as specified herein. 32. Section 28 31 00 – FIRE ALARM AND DETECTION SYSTEM, paragraph 2.02, sub-paragraph K, 4, ADD new item “e” as follows: a. Horn loudspeakers for the loudspeaker “clusters” within the Gymnasium shall be Wheelock STH-15S or approved equal. Color shall be gray. 33. Section 28 40 00 – AUDIO / VISUAL / SOUND SYSTEMS, DELETE this section in its entirety and replace with REVISED section being re-issued in its entirety as part of this Addendum. Reference copy of attached re-issued specification section. DRAWINGS: 1. Sheet SK-1: ADD; Entire Sheet: See attached drawing SK-1 for clarification drawings regarding the relocated dugouts from the existing softball field, typical of (2) two. 2. Sheet SK-2: ADD; Entire Sheet: See attached drawing SK-2 for clarification drawings regarding the relocated dugouts from the existing softball field, typical of (2) two. 3. Sheet SK-3: ADD; Entire Sheet: See attached drawing SK-3 for clarification drawings regarding the relocated dugouts from the existing softball field, typical of (2) two. 4. Sheet C101: REVISE: See attached drawing C101 for revisions to address changes to the civil site plan as a result of revisions in the water service location, addition of a fire line and fire hydrants, additional concrete to accommodate A/C units and additional information for the softball field relocation. 5. Sheet C102: REVISE: See attached drawing C101 for revisions to address changes to the civil site plan as a result of revisions in the water service location, addition of a fire line and fire hydrants, additional concrete to accommodate A/C units and additional information for the softball field relocation. 6. Sheet C103: Addendum No. 3 1501 Page 4 of 8 REVISE: See attached drawing C101 for revisions to address changes to the civil site plan as a result of revisions in the water service location, addition of a fire line and fire hydrants, additional concrete to accommodate A/C units and additional information for the softball field relocation. 7. Sheet C104: REVISE: See attached drawing C101 for revisions to address changes to the civil site plan as a result of revisions in the water service location, addition of a fire line and fire hydrants, additional concrete to accommodate A/C units and additional information for the softball field relocation. 8. Sheet C201: REVISE: See attached drawing C101 for revisions to address changes to the civil site plan as a result of revisions in the water service location, addition of a fire line and fire hydrants, additional concrete to accommodate A/C units and additional information for the softball field relocation. 9. Sheet A101: ADD; Drawing Note: 1.PROVIDE FRP PANELS UP TO 4’-0”. CLARIFICATION: Jan 019 shall have 4’-0” wide FRP panels (Drawing Note 1.) at two (2) walls at service sink. 10. Sheet A102: CLARIFICATION: Jan 156 shall have 4’-0” wide FRP panels (Drawing Note 3.) at two (2) walls at service sink. 11. Sheet A104: CLARIFICATION: Jan 112 shall have 4’-0” wide FRP panels (Drawing Note 3.) at two (2) walls at service sink. 12. Sheet A107: CLARIFICATION: Jan 211 shall have 4’-0” wide FRP panels (Drawing Note 3.) at two (2) walls at service sink. ADD; Drawing Note: 08 83 00: 6’-0” TALL MIRROR WITH J-CHANNEL TRIM AT TOP AND BOTTOM. MOUNT AT 18” A.F.F. See attached drawing A107-R1 for additional information. 13. Sheet A301: REVISE; Drawing Note: Revise note 11 6643 to read: GYMNASIUM SCOREBOARDS 14. Sheet A302: DELETE; Drawing Notes: Delete entire drawing note 11 6643 GYMNASIUM SCOREBOARD AND SHOT CLOCKS 15. Sheet A501: REVISE: Door 004-A shall be Door Type HM-1 in lieu of HM-2. REVISE; Door Schedule: Door 301-A shall be QUAN.: 1, WIDTH: 3’-0”, HEIGHT: 7’-0”, THK: 1-3/4”, FRAME TYPE: 10, HEAD DETAIL: K15/A309, JAMB DETAIL: Similar to K1 / A504. 16. Sheet I110-2: Addendum No. 3 1501 Page 5 of 8 REVISE: Window Shades – Alternate #4, should read, Mechoshade or approved equal Doubleshade Motorized Shades Sunscreen Fabric Selection Equal to: Euroveil, Color TBD Blackout Shade Fabric Selection Equal to: Equinox Blackout, Color: TBD 17. Sheet P201A: REVISE; See revised drawing P201A-R3 for revisions to relocate domestic water, vent and waste piping to chase space. 18. Sheet E101: REVISE; See revised drawing E101-R1 for revisions to network extension conduit and boxes. 19. Sheet E201: REVISE; Drawing Note; revise keyed note #2 to include the following new text: “Disconnect switch shall be 30 Amp, 240 Volt equipped with one (1) 20 Amp fuse”. 20. Sheet E204: REVISE; See revised drawing E204-R1 for addition of lighting at Reception Desk casework. 21. Sheet E207: REVISE; See revised drawing E207-R1 for addition of lighting at Reception Desk and for the addition of an exit sign at Corridor 201. 22. Sheet E401: REVISE; reference tag; Within Stair #2 (room 017), revise the door identification tag from “016A” to “005A”. 23. Sheet E402: REVISE; See revised drawing E402-R1 for revised wiring at the scoreboard control floor box. 24. Sheet E403: REVISE; See revised drawing E403-R1 for revised wiring at the scoreboard control floor box. 25. Sheet E405: REVISE; See revised drawing E405-R1, R2 for addition of wiring at the scoreboard. 26. Sheet E406: REVISE; See revised drawing E406-R1, R2 for addition of wiring at the scoreboard.. 27. Sheet E501: REVISE; Drawing Note; revise Panel P1D to be graphically represented as a two-section panel. Example – Panel P1A is currently represented as a two-section panel. 28. Sheet E502: Addendum No. 3 1501 Page 6 of 8 REVISE; Drawing Note; at the coaxial cable extending from the MEDIACOM equipment in Room 163 to the MEDIACOM equipment in Room 111, revise the cable type from RG-59 to RG-11. 29. Sheet E503: REVISE; See revised drawing E503-R1, R2 and R3 for revisions to schematic wiring diagrams. 30. Sheet E505: REVISE; See revised drawing E505-R1 for revisions to network extension conduit and boxes. 31. Sheet E701: REVISE; See revised drawing E701-R1 for revisions to the Equipment Data Schedule. 32. Sheet E702: REVISE; See revised drawing E702-R1, R2 for revisions to the Lighting Fixture Schedule and the Fire Alarm Matrix. REVISE schedule on drawing; At fixture type M, revise the Kelvin rating of the LED’s from 3,500 to 4,000. Within the catalog number for this fixture, revise catalog number nomenclature from “35” to “40”. 33. Sheet E703: REVISE; Drawing Note; at the panel schedule for Panel “INV”, revise the Amperage of the main circuit breaker from 60 Amps to 50 Amps. ATTACHMENTS: Specification Section 03 3053 Miscellaneous Cast-In-Place Concrete Specification Section 28 1300 Access Control System Specification Section 28 4000 Audio/Visual/Sound Systems Supplemental Drawing SK-1 Supplemental Drawing SK-2 Supplemental Drawing SK-3 Revision Drawing C101 Revision Drawing C102 Revision Drawing C103 Revision Drawing C104 Revision Drawing C201 Revision Drawing A107-R1 Revision Drawing P201A-R3 Revision Drawing E101-R1 Revision Drawing E204-R1 Revision Drawing E207-R1 Revision Drawing E402-R1 Revision Drawing E403-R1 Revision Drawing E405-R1 Revision Drawing E405-R2 Revision Drawing E406-R1 Revision Drawing E406-R2 Revision Drawing E503-R1 Revision Drawing E503-R2 Revision Drawing E503-R3 Revision Drawing E505-R1 Revision Drawing E601-R1 Addendum No. 3 1501 two (2) pages fifteen (15) pages twelve (12) pages one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page one (1) page Page 7 of 8 Revision Drawing E702-R1 Revision Drawing E702-R2 one (1) page one (1) page END OF ADDENDUM 3 Addendum No. 3 1501 Page 8 of 8 CONCURE SYSTEMS ADMIXTURE DIVISION 03 3053 MISCELLANEOUS CAST-IN-PLACE CONCRETE PART 1- GENERAL 1.1 SUBMITTALS A. Closeout Submittals: Submit the following: 1. 1.2 Warranty: Warranty documents specified herein. DELIVERY, STORAGE & HANDLING A. 1.3 Store materials protected from exposure to harmful weather conditions and at a temperature above 45 Fahrenheit. WARRANTY A. Project Warranty: Refer to Conditions of the Contract for Project warranty provisions. B. Manufacturer’s Warranty: Submit, for the owner’s acceptance, the manufacturer’s standard warranty document executed by an authorized company official. The manufacturer’s warranty is in addition to, and not a limitation of, other rights the Owner may have under provisions of the contract documents. 1. Warranty Period: Ten years commencing on the date of acceptance of the project by the Owner or Notice of Completion which ever is earliest. 2. Warranty Terms: Terms to include moisture related failures, including all finish floor materials and labor. Admixture warranty issued on completion of ASTM-D-5084 or ASTM-D-4263 test and results submitted to a Concure Systems Representative. PART 2- PRODUCTS 2.1 CONCRETE WATERPROOFING ADMIXTURE A. Manufacturer: Contact: Email: Concure Systems, Phoenix, AZ 85048 Emil Pikula Cell – (480) 820-7171 [email protected] B. Admixture: C. Accessory Materials. Concure Systems Admixture 1. Concure Systems Crack Fill Binder. 2. Concure Systems 2100 Cure & Seal 2.2 MIXING A. Add 14 ounces of Concure admixture per 100 lbs. of cementitious material to ready mix truck at the batch plant, or jobsite before discharge, mix rapidly for 7 minutes. (Follow Manufacturer’s Instructions). CONCURE SYSTEMS ADMIXTURE DIVISION 03 3053 MISCELLANEOUS CAST-IN-PLACE CONCRETE B. To be used in lieu of, designed, mix water. Not in addition to mix water. Do not alter Water/cement ratio. W/c .45 or less and a maximum slump of 4 inches. C. The addition of non-chlorinated admixtures is permitted. (Follow Manufacturer’s Instructions). TESTING 2.3 A. Concure recommends either ASTM D-5084 or ASTM 4263 only. B. 2.4 Projects more than 30k sf Concure Systems to perform ASTM D-5084, any project under 30k sf ASTM D-4263 shall be sufficient for testing and to be performed by flooring contractor with documented results of installation and Concure present for test removal. PRODUCT SUBSTITUTIONS A. Substitutions allowed meeting the following criteria: Full warranty on above based terms without use of under slab VAPOR BARRIER/VAPOR RETARDER. Company MUST manufacture and offer full array of product i.e. Admixture, Topical System, Crackfill Binder, and Cure & Seal A representative from proposed substitute company MUST be present on site first day of pour minimum as well as jobsite visit day of pour. Product must have MINIMUM 10 years no fail experience in the flooring/Concrete industry. SECTION 28 1300 ACCESS CONTROL SYSTEM PART 1 - GENERAL 1.1 A. 1.2 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. SUMMARY A. The intent of this document is to specify the minimum criteria for the design, and installation of a physical access control system (herein after identified as SYSTEM). B. One of the SYSTEM's primary purposes shall be to provide access control. The SYSTEM shall be able to make access granted or denied decisions, define access levels, and set time zones and holidays. An input/output linkage feature shall allow linking of monitor zone points to output control points within Intelligent System Controllers (ISCs). The SYSTEM shall support features such as area control, database segmentation, and time zone/holiday overrides. C. The SYSTEM shall have an open architecture design. It shall be a true open architecture design and support industry standards for databases, networks, credential printers, and video cameras. No customized or proprietary PC or credential creation software or hardware shall be required to operate the SYSTEM. The SYSTEM shall be both scalable and portable to give CUSTOMER the ability to increase performance based on CUSTOMER requirements. This shall give CUSTOMER maximum flexibility and room for unlimited growth. D. The system shall include database segmentation so the Lincoln University staff as well as Parks and Recreation staff can have their information secured from the other. Personnel information and reader programming shall only be available to the respective user. The information shall be accessible from 2 user workstations, one in Lincoln University and one in the Parks and Recreation area. SCOPE OF WORK A. The scope of work for this project includes: 1. Provide one quad core server with minimum 21 inch flat panel monitor under this contract Windows 7 Operating system and applicable access control software. Located in data closet. ACCESS CONTROL SYSTEM 28 1300 - 1 2. Windows 7 Operating system and two client workstation licenses as well as other required applicable software shall be provided. 3. Design and input of system database (training structure only-no data entry.) 4. Intelligent System Control/reader interface panels. 5. Proximity card readers with keypads. 6. Electric door locks and door lock power supplies shall be as specified under another section, locks shall be provided and installed by others, lock power supplies shall be provided and installed by the electrical contractor. 7. Provide interface to the building fire alarm system for release of locks in a fire condition. 8. Provide connection to Owners network. Network port and configuration shall be the responsibility of the owner coordinated with the access control system provider. REFERENCES A. Federal Communications Commission (FCC): 1. B. Underwriters Laboratories (UL): 1. C. FCC Part 15 – Radio Frequency Devices UL294 – Access Control System Units National Fire Protection Association (NFPA): 1. NFPA70 – National Electrical Code SUBSTITUTIONS A. The specified system is an integrated system from Lenel consisting of various manufacturers’ products as specified. The specified equipment is compatible as an integrated system and any substitution may not provide for a working system. It is the responsibility of the contractor to provide a complete working system. Provide Lenel OnGuard software as required for the specified system features. B. Substitutions are permitted if the equipment supplier provides manufacturer verified technical data confirming system compatibility to the engineer 10 days prior to bid time. The engineer will review and any approval to bid the substituted equipment will come out by written addendum. Equipment manufacturers which may be substituted include Cardkey, Linx and Rusco. SYSTEM OVERVIEW ACCESS CONTROL SYSTEM 28 1300 - 2 A. The system shall provide a number of functions including the ability to regulate access through specific doors to secured areas of the facility. The SYSTEM’s operating environment shall be the fully multi-tasking multi-threading Microsoft Windows 7 Operating System. B. The system shall allow the configuration of enrollment & badging functions, alarm monitoring and administrative functions on a single workstation. The system shall be expandable to support an unlimited number of individual module or integrated client workstations. All access control field hardware, including Intelligent System Controllers (ISCs), shall be connected to every / any Windows based access control system workstation on the network. Provide two PC workstations capable of running the client software under this contract including 21 inch flat panel monitors. C. The system shall be designed to support any industry standard network topology including those listed below. TCP/IP Novell Netware (IPX/SPX) Digital PATHWORKS Banyan VINES IBM LAN Server (NetBUI) IBM SNA Networks Microsoft LAN Manager (NerBUI) NFS Networks Remote Access Service (RAS) via ISDN, x.25 and standard phone lines D. Operating System 1. The system shall support the 32-bit Microsoft Windows 7 multi-tasking, multithreading operating system. The system must meet the below requirements for a Windows 7 based system. Interface a. The operating system shall offer the look and feel of Windows 7 to enhance usability and efficiency. The operating system shall come complete with administrative wizards and interactive help to guide System Administrators in the configuration of the system. Networking a. The operating system shall support a minimum of 15 networking protocols including, but not limited to, TCP/IP, IPX/SPX, RAS, and NetBUI. The system shall also support peer-to-peer and FTP server capabilities. Remote Management a. The operating system shall utilize remote management utilities such as event viewers and performance monitors to fine tune and optimize the operating system that will in turn optimize the system. It shall support both ACCESS CONTROL SYSTEM 28 1300 - 3 dial out capabilities to remote servers as well as remote dial in capabilities. Remote Access Services (RAS) a. The operating system shall support full remote diagnostics abilities through its remote access services. Full network functionality shall be available over remote links using NetBUI, IPX/SPX, and TCP/IP protocols. Dial in capability to remote Windows 7 Servers using remote access service shall also be available. Security a. The operating system shall support multiple user profiles on the same client workstation so System Administrators can assign which programs shall be available to System Operators based on their operating system user log-on. Local desktop security shall be available through User ID and required password log-on. b. The system shall support industry standard Open Database Connectivity (ODBC) compliant relational database management systems. This shall include relational database management systems such as Microsoft SQL Server 2005 or Oracle Server 10g. Graphical User Interface a. The system shall have an easy to use Windows Graphical User Interface. It shall be intuitive and all messages and commands shall be in English Prose. All functions shall be both keyboard and mouse driven. Migration & Upgrades a. The system shall support a seamless upward and horizontal migration path from system to system. The system shall ship with the ability to support the largest system in the product line complete with all the modules, features and functionality described above and below. The system size and feature set shall be controlled by a software / hardware license key and shall be programmed based on licensing. Seamless Integration a. All system application modules, features, and functions must be generated from a single source code set. The access control, alarm monitoring, asset management, remote access level management, and visitor management, and ID management modules of the software shall be created from this single source code set. There absolutely shall not be separate source code bases for different modules. Thus, a single manufacturer must develop all modules of software. All system modules shall be seamlessly integrated to feature a single system, single code base, single graphical user interface, and single database. ACCESS CONTROL SYSTEM 28 1300 - 4 1.3 ACTION SUBMITTALS A. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, and furnished specialties and accessories. B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work. 1. 2. 3. Diagrams for cable management system. System labeling schedules, including electronic copy of labeling schedules that are part of the cable and asset identification system of the software specified in Parts 2 and 3. Wiring Diagrams. For power, signal, and control wiring. Show typical wiring schematics including the following: a. b. c. 4. 1.4 A. 1.5 A. Workstation outlets, jacks, and jack assemblies. Patch cords. Patch panels. Generic wiring diagrams from the equipment manufacturers shall be supplemented with customized, project specific wiring diagrams prepared specifically for the work of this project. CLOSEOUT SUBMITTALS Operation and Maintenance Data: For access control system to include in Operation and Maintenance manuals. QUALITY ASSURANCE Installer Qualifications: An employer of workers trained and approved by manufacturer. 1. Cable installer must have on staff a registered communication distribution designer certified by Building Industry Consulting Service International. B. Source Limitations: Obtain central station, workstations, controllers, Identifier readers, and all software through one source from single manufacturer. C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. D. Comply with NFPA 70, "National Electrical Code." E. The contractor shall deliver a set of System Operation and Maintenance manuals to the Owner as part of the Project Closeout documentation. F. Checkout report: The contractor shall provide the Owner with a check-out report for each item of equipment. The report shall include: ACCESS CONTROL SYSTEM 28 1300 - 5 1. 2. 3. 4. G. 1.6 A. Complete list of each device. The date the device was tested and by whom. The date the device was re-tested and by whom. Final test report indicating each device was tested successfully. Certification 1. The equipment supplier/firm must be an authorized, trained equipment supplier with minimum of 5 years of selling, installing and maintaining similar systems and services as outlined in this document. The firm shall have an established office located within 100 miles of the jobsite and be capable of providing 4 hour response time for emergencies related to the system. 2. All technicians providing final wire termination, configuration and programming on major components shall be manufacturer trained on the products being installed under this scope, certifications shall be provided within submittals. DELIVERY, STORAGE, AND HANDLING Central Station, Workstations, and Controllers: 1. 2. 3. Store in temperature- and humidity-controlled environment in original manufacturer's sealed containers. Maintain ambient temperature between 50 and 85 deg F and not more than 80 percent relative humidity, noncondensing. Open each container; verify contents against packing list; and file copy of packing list, complete with container identification, for inclusion in operation and maintenance data. Save original manufacturer's containers and packing materials and deliver as directed under provisions covering extra materials. PART 2 - PRODUCTS 2.1 SYSTEM OVERVIEW A. The system shall provide a number of functions including the ability to regulate access through specific doors to secured areas of the facility. The SYSTEM’s operating environment shall be the fully multi-tasking multi-threading Microsoft Windows 7 Operating System. B. The system shall allow the configuration of enrollment & badging functions, alarm monitoring and administrative functions on a single workstation. The system shall be expandable to support an unlimited number of individual module or integrated client workstations. All access control field hardware, including Intelligent System Controllers (ISCs), shall be connected to every / any Windows based access control system workstation on the network. Provide two PC workstations capable of running the client software under this contract including 21 inch flat panel monitors. ACCESS CONTROL SYSTEM 28 1300 - 6 C. The system shall be designed to support any industry standard network topology including those listed below. TCP/IP Novell Netware (IPX/SPX) Digital PATHWORKS Banyan VINES IBM LAN Server (NetBUI) IBM SNA Networks Microsoft LAN Manager (NerBUI) NFS Networks Remote Access Service (RAS) via ISDN, x.25 and standard phone lines D. Operating System 1. The system shall support the 32-bit Microsoft Windows 7 multi-tasking, multithreading operating system. The system must meet the below requirements for a Windows 7 based system. Interface a. The operating system shall offer the look and feel of Windows 7 to enhance usability and efficiency. The operating system shall come complete with administrative wizards and interactive help to guide System Administrators in the configuration of the system. Networking a. The operating system shall support a minimum of 15 networking protocols including, but not limited to, TCP/IP, IPX/SPX, RAS, and NetBUI. The system shall also support peer-to-peer and FTP server capabilities. Remote Management a. The operating system shall utilize remote management utilities such as event viewers and performance monitors to fine tune and optimize the operating system that will in turn optimize the system. It shall support both dial out capabilities to remote servers as well as remote dial in capabilities. Remote Access Services (RAS) a. The operating system shall support full remote diagnostics abilities through its remote access services. Full network functionality shall be available over remote links using NetBUI, IPX/SPX, and TCP/IP protocols. Dial in capability to remote Windows 7 Servers using remote access service shall also be available. Security ACCESS CONTROL SYSTEM 28 1300 - 7 a. The operating system shall support multiple user profiles on the same client workstation so System Administrators can assign which programs shall be available to System Operators based on their operating system user log-on. Local desktop security shall be available through User ID and required password log-on. b. The system shall support industry standard Open Database Connectivity (ODBC) compliant relational database management systems. This shall include relational database management systems such as Microsoft SQL Server 2005 or Oracle Server 10g. Graphical User Interface a. The system shall have an easy to use Windows Graphical User Interface. It shall be intuitive and all messages and commands shall be in English Prose. All functions shall be both keyboard and mouse driven. Migration & Upgrades a. The system shall support a seamless upward and horizontal migration path from system to system. The system shall ship with the ability to support the largest system in the product line complete with all the modules, features and functionality described above and below. The system size and feature set shall be controlled by a software / hardware license key and shall be programmed based on licensing. Seamless Integration a. All system application modules, features, and functions must be generated from a single source code set. The access control, alarm monitoring, asset management, remote access level management, and visitor management, and ID management modules of the software shall be created from this single source code set. There absolutely shall not be separate source code bases for different modules. Thus, a single manufacturer must develop all modules of software. All system modules shall be seamlessly integrated to feature a single system, single code base, single graphical user interface, and single database. E. Door Hardware Interface: 1. 2. 2.2 Comply with requirements in Section 087100 "Door Hardware" and Section 087111 "Door Hardware (Descriptive Specification)" for door hardware required to be monitored or controlled by the security access system. Electrical characteristics of controllers shall match the signal and power requirements of door hardware. FUNCTIONAL & OPERATIONAL REQUIREMENTS A. General ACCESS CONTROL SYSTEM 28 1300 - 8 1. B. The design of the system shall include devices and equipment to monitor and control access of cardholders to restricted areas, detect and deny unauthorized attempted entries within specific buildings or areas, annunciate alarms and generate reports. Once incorporated with the daily operations of the designated facility, the system shall detect and deny unauthorized entry into restricted areas, while granting entry to individuals who have proper access rights. The system is to be designed and configured to provide operational flexibility, reliable performance, and ease of use. Operational Concept 1. The system shall consist of equipment and devices placed at predetermined locations to ensure that only cardholders that are authorized to enter secured areas through certain doors can do so. This shall be accomplished by means of a computer(s) and electronic devices used in conjunction with door locks and card readers. 2. Photo badges are a capability of the system but not part of this contract. The badging may be added to the system at a later date. The data screen shall allow for a minimum of sixteen pages of cardholder information that shall be input upon enrollment. Above and beyond the fixed fields such as Last Name, First Name, there shall also be user-definable fields of which the system can designate, if desired, as drop-down menus to ensure data integrity. These fields shall vary in character length as dictated by the System Administrator. Data fields shall be assigned as alphanumeric, numeric, date, or unique. Numeric, date, and unique fields shall be generated by the system if desired. 3. The system shall support an unlimited number of card readers, input point, and relay outputs. The system database server shall support an unlimited number of cardholders, visitors, and assets limited only by the memory located in the Intelligent System Controllers in which cardholder information will be downloaded. The database server shall also support an unlimited number of access events and System Operator transactions in the history file. The system shall support an unlimited number of client workstations, so long as the network supports them. A fully loaded system shall guarantee a one half-second response time for access granted/denied decisions from the time that a cardholder swipes his/her card. C. System Features and Requirements 1. All system applications must be easy to use and attractive to look at. The system shall utilize a user friendly Windows Graphical User Interface. It shall utilize keyboard and mouse operations with graphical presentations of screen information. System Operators / System Administrators shall change the look and feel of the applications by setting the typeface and size of font for the way they wish for the system information to be displayed. A minimum of 255 typeface combinations shall be available for System Operators to choose from. Each application shall provide a consistent user interface across all operations of the system. All routine information displayed and requiring input must be in English language prose. ACCESS CONTROL SYSTEM 28 1300 - 9 D. Access Control 1. Time Zones a. The system must be capable of creating and storing up to two hundred fifty five (255) time zones. Each time zone must have a minimum of six (6) intervals. Each interval shall be assignable to any day of the week and capable of being restricted on a minimum of eight (8) types of holidays. 2. Access Levels a. All cardholders shall have access based on facility, card reader, time, and day. The card readers must grant access to cardholders assigned to the appropriate access levels. The capability to define a minimum of 32,000 access levels is required to provide the System Administrator flexibility in assigning access privileges to cardholders. A minimum of thirty two (32) access levels shall be assignable to each cardholder. 3. Temporary Access Levels a. Inclusive of the above 32,000 Access Levels, the system shall allow the System Administrator to define Temporary Access Levels that combine card readers and time zones. 4. Access Groups a. The system shall allow System Administrators to define an unlimited number of access groups. 5. Precision Access Levels a. The system shall include the ability to utilize Precision Access Levels above and beyond the aforementioned 32,000 standard and temporary access levels. This will offer the ability to assign “unlimited card reader/time zone combinations.” 6. Holidays a. The system must allow the System Administrator to designate certain dates as holidays. As well, the dates for Daylight Savings Time shall be definable and shall automatically take effect without user intervention. The system shall support a minimum of 255 Holiday assignments. 7. Database Segmentation a. The system shall employ advanced database segmentation functionality. Each segment shall be allowed to have its own unique set of hardware and system parameters including access control field hardware, time zones, access levels, etc., which shall allow System Administrators to expand upon current hardware constraints. For example, each segment shall have its own 32,000 access levels, 255 time zones, and 255 holi- ACCESS CONTROL SYSTEM 28 1300 - 10 days. As such, only ID cards that are assigned access levels to card readers in a segment need to be downloaded to the Intelligent System Controllers in that segment. E. Field Panel Hardware 1. The system shall communicate with the Intelligent System Controllers/reader interface board by either RS-485 or RS-232 EIA standard. The system shall communicate by LAN/WAN connections utilizing TCP/IP communications protocol. The system shall also have the ability to communicate through remote dial up capabilities. The System Controllers/reader interface board shall be Lenel model LNL-2220 with 2 reader capacity. Additional capacity shall be provided using Lenel LNL-320 dual reader interface boards or LNL-1300 single reader interface boards as required. F. Power supplies shall be provided as required for all reader interface modules and motion sensors. The system power supplies shall be 4 amp model LNLAL600ULX-4CB6 UL Listed assemblies mounted in Lenel system enclosures to include door control modules. Power for door locks shall be provided by others. G. Smart card readers shall be provided at locations shown on plans. The card readers shall be HID model RWK40 utilizing contactless smart card technology with a keypad and shall include the following features. Provide 500 compatible smart cards with the system. 1) Power: The reader shall be powered by external 12VDC or by the controller’s internal 12VDC regulated power supply. 2) Mounting: The reader shall be capable of being mounted against metal door or window frames. 3) Range: The reader shall be capable of reading cards at a range of two to four inches. Note* If card reader is mounted against a metal frame, read range may be reduced. 4) Electronics: The reader electronics shall be encapsulated for environmental security. 2.3 A. Magnetic Door Contacts shall be Sentrol 1078CW for recessed flush mounted applications. B. Request to exit motion detectors shall be Detection System DS-160. ASSOCIATED EQUIPMENT A. Magnetic door contacts shall be Sentrol 1078CW for flush mounted applications. B. Request-to-Exit motion detectors shall be Detection Systems DS-160. ACCESS CONTROL SYSTEM 28 1300 - 11 2.4 A. 2.5 A. DOOR HARDWARE INTERFACE Electric Door Strikes: Use end-of-line resistors to provide power-line supervision. Signal switches shall transmit data to controller to indicate when the bolt is not engaged and the strike mechanism is unlocked, and they shall report a forced entry. Power and signal shall be from the controller. Electric strikes are specified in Section 087100 "Door Hardware." CABLES Refer to details on drawings for additional information regarding cables. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine pathway elements intended for cables. Check raceways and other elements for compliance with space allocations, installation tolerances, hazards to cable installation, and other conditions affecting installation. B. The access control system shall be installed in accordance with the manufacturers installation instructions. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Comply with recommendations in SIA CP-01. B. Comply with TIA/EIA 606-A, "Administration Telecommunications Infrastructure." 3.3 Standard for Commercial CABLING A. Comply with NECA 1, "Good Workmanship in Electrical Construction." B. Wiring Method: Install wiring in raceway and cable tray except within consoles, cabinets, desks, and counters. Conceal raceway and wiring except in unfinished spaces. C. Wiring Method: Install wiring in raceway and cable tray except within consoles, cabinets, desks, and counters and except in accessible ceiling spaces and in gypsum board partitions where unenclosed wiring method may be used. Use NRTL-listed plenum cable in environmental airspaces, including plenum ceilings. Conceal raceway and cables except in unfinished spaces. ACCESS CONTROL SYSTEM 28 1300 - 12 D. Boxes and enclosures containing security-system components or cabling, and which are easily accessible to employees or to the public, shall be provided with a lock. Boxes above ceiling level in occupied areas of the building shall not be considered accessible. Junction boxes and small device enclosures below ceiling level and easily accessible to employees or the public shall be covered with a suitable cover plate and secured with tamperproof screws. E. Install end-of-line resistors at the field device location and not at the controller or panel location. 3.4 GROUNDING A. Comply with Section 280526 "Grounding and Bonding for Electronic Safety and Security." B. Comply with IEEE 1100, "Recommended Practice for Power and Grounding Electronic Equipment." C. Ground cable shields, drain conductors, and equipment to eliminate shock hazard and to minimize ground loops, common-mode returns, noise pickup, cross talk, and other impairments. D. Bond shields and drain conductors to ground at only one point in each circuit. E. Signal Ground: 1. 2. 3. 3.5 Terminal: Locate in each equipment room and wiring closet; isolate from power system and equipment grounding. Bus: Mount on wall of main equipment room with standoff insulators. Backbone Cable: Extend from signal ground bus to signal ground terminal in each equipment room and wiring closet. IDENTIFICATION A. In addition to requirements in this article, comply with applicable requirements in Section 260553 "Identification for Electrical Systems" and with TIA/EIA 606-A. B. Label each terminal strip and screw terminal in each cabinet, rack, or panel. 1. 2. All wiring conductors connected to terminal strips shall be individually numbered, and each cable or wiring group being extended from a panel or cabinet to a building-mounted device shall be identified with the name and number of the particular device as shown. Each wire connected to building-mounted devices is not required to be numbered at the device if the color of the wire is consistent with the associated wire connected and numbered within the panel or cabinet. ACCESS CONTROL SYSTEM 28 1300 - 13 3.6 A. 3.7 A. SYSTEM SOFTWARE AND HARDWARE Develop, install, and test software and hardware, and perform database tests for the complete and proper operation of systems involved. Assign software license to Owner. FIELD QUALITY CONTROL Perform tests and inspections. 1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing. 2. The equipment supplier shall conduct a complete inspection and test of all installed access control and security monitoring equipment. All deficiencies noted in the above test shall be corrected. 3. B. Devices and circuits will be considered defective if they do not pass tests and inspections. C. Prepare test and inspection reports. D. A letter of certification shall be provided to indicate that the tests have been conducted and all devices are operational. 3.8 A. STARTUP SERVICE Engage a factory-authorized service representative to supervise and assist with startup service. 1. 2. 3.9 Complete installation and startup checks according to approved procedures that were developed in "Preparation" Article and with manufacturer's written instructions. Enroll and prepare badges and access cards for Owner's operators, management, and security personnel. DEMONSTRATION A. Engage a factory-authorized service representative to train Owner's personnel to adjust, operate, and maintain security access system. See Section 017900 "Demonstration and Training." B. Training shall occur at the project site. Training shall take place at dates and times mutually agreed upon between the Owner and the equipment supplier. Provide 12 hours of on site training. C. Develop separate training modules for the following: ACCESS CONTROL SYSTEM 28 1300 - 14 1. 2. 3. 4. 5. Computer system administration personnel to manage and repair the LAN and databases and to update and maintain software. Operators who prepare and input credentials to man the control station and workstations and to enroll personnel. Security personnel. Hardware maintenance personnel. Corporate management. END OF SECTION 281300 ACCESS CONTROL SYSTEM 28 1300 - 15 SECTION 28 4000 AUDIO/VISUAL/SOUND SYSTEMS PART 1 - GENERAL 1.1 A. 1.2 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. ACTION SUBMITTALS A. Product Data: For each type of product. B. Shop Drawings: Power, signal, and control wiring. 1. 2. 3. 4. 5. 6. Include plans, elevations, sections, and attachment details. Include details of equipment assemblies. Indicate dimensions, weights, required clearances, method of field assembly, components, and location and size of each field connection. Console layouts. Control panels. Rack arrangements. Wiring Diagrams: For power, signal, and control wiring. a. b. c. d. 7. 1.3 Identify terminals to facilitate installation, operation, and maintenance. Single-line diagram showing interconnection of components. Cabling diagram showing cable routing. Generic wiring diagrams from the equipment manufacturers shall be supplemented with customized, project specific wiring diagrams prepared specifically for the work of this project. Written verification of the "A/V System Sub-Contractor" qualifications as required in PART 1 section 1.6, A,7. INFORMATIONAL SUBMITTALS A. Qualification Data: For Installer. B. Field quality-control reports. 1.4 A. CLOSEOUT SUBMITTALS Operation and Maintenance Data: For sound systems to include in Operation and Maintenance manuals. 1. In addition to items specified in Section 017700 "Closeout Procedures" and Section 017823 "Operation and Maintenance Data," include the following: a. b. c. 1.5 List of tools and replacement items recommended to be stored at Project for ready access. Include part and drawing numbers, current unit prices, and source of supply. Operating instructions laminated and mounted adjacent to operating console location. Training plan. SCOPE OF WORK A. Included in this contract the A/V contractor shall provide: 1. All major items of A/V equipment as specified. 2. All miscellaneous items required for a complete and operating system. 3. Shop fabrication of all equipment cabinets, outlet plates and panels, and subassemblies. 4. All low voltage control equipment. 5. All cables and outlet plates. 6. Preparation of drawings & documentation required by the specification. 7. Initial tests and adjustment. 8. Instruction of owner's operating personnel. 9. Preparation of the owner's manuals. 10. Maintenance services and warranty. B. The A/V contractor is responsible for the following related work: 1. Supply accessories and minor equipment items needed for a complete system, even if not specifically mentioned herein or on the drawings, without claim for additional payment. 2. Cooperate with all trades present in the building, so lost time, work stoppages, interference, and work inefficiencies do not occur. Assure labor "harmony" among personnel and subcontractors, and with other trades associated with construction, delivery, installation, and testing of the facility. 1.6 A. QUALITY ASSURANCE Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project. 1. Personnel certified by Infocomm as CTS or CTS-I Level Technician. 2. The A/V Contractor must be a contractor who has regularly furnished and installed commercial A/V systems of the type specified for a minimum of the last 5 years. 1.7 A. 3. The A/V Contractor must maintain a suitably staffed and equipped service organization and must regularly offer maintenance services for systems of this type and size. 4. The A/V Contractor must be an authorized dealer of all equipment provided with this system. Given the inherent warranty difficulties which occur when products are provided from contractors who participate in trans-shipping or two-stepped equipment sales, this dealership requirement will be strictly adhered to. At the request of the Owner or Architect, any contractor responding to this bid proposal must provide proof of dealership status for all listed system components or approved alternates. Failure to comply with this request will be grounds for bid rejection. 5. At the request of the Owner or Architect, an inspection of the A/V contractor's place of business shall be scheduled to demonstrate that the contractor possesses adequate plant and equipment to complete the work properly and in a timely manner, adequate staff with sufficient technical experience, and suitable financial status to meet the obligations of the contract. 6. The A/V Contractor must have a programmer on staff who has received factory training from the manufacturer to program the control system provided, and who has received factory certification of same. At the request of the Owner or Architect, any contractor responding to this bid proposal must provide proof of certified factory programming training for listed control equipment. Failure to comply with this request will be grounds for bid rejection. 7. An Electrical Contractor or any other contractor who does not meet the requirements listed above who intends to bid on this work will be required to employ the services of a qualified "A/V System Sub-Contractor". The "A/V System Sub-Contractor" must be named in the shop drawing submittal information along with written documentation verifying that the sub-contractor fulfills all requirements listed in 1.02 A through E. SYSTEM DESCRIPTIONS Gymnasium Sound System 1. The Gymnasium sound system shall enable system users to broadcast microphone and program content to the (4) separate court sections – either as individual sections or as combined portions. (Only adjoining court sections can be combined.) Each section shall have a single microphone input jack; with the southwest end having an additional single microphone input jack that shall serve as the front end location for full room events. Each court section shall be furnished with a microphone/cord/stand assembly; along with a portable announcer’s case that will expand the users capabilities. The portable announcer’s case shall contain a 5-input mixer (4 microphone inputs and 1 auxiliary input), a CD player with iPod dock and MP3 player connections, and an AC power panel for one button operation of the case components. Each case shall be furnished both a 10’ cord and a 100’ cord. The 10’ cord shall enable connection to the local input jack while keeping the case at that location. The 100’ cord shall enable the user to move the case to the center court position. (Note: This cord should only be extended across the floor when the wall partition has been extended to prevent a trip hazard from the cord.) B. C. 2. The 5 microphone input jacks shall connect to a digital signal processor which will then connect to the 4-channel power amplifier. 3. A total of eight (8) high-performance, ceiling mounted speakers shall be installed in each of the four court sections for a total of thirty two (32) speaker systems. These speakers shall be mounted such that the face of the speaker enclosure is at, or above, the lowest portion of the adjoining steel bar joist ceiling supports. The main system electronic equipment shall be installed into a main equipment cabinet that will be located in the designated rack room. This cabinet shall contain the digital signal processor, 4-channel power amplifier, an AC power onoff panel, a storage drawer, and a custom control panel. This custom control panel shall contain 4 volume controls (one for each of the court sections) and 3 room combining switches. Pressing a room combining switch will connect two adjoining court sections such that the combined section can operate as one unit. Pressing all 3 room combining switches shall combine all sections into one unit. Classroom Audio/Visual Systems (Rooms 104, 107, 109, 204, 217) 1. This description is typical for five (5) identical Classroom A/V Systems. Each system shall have a single input jack plate that shall contain an HDMI connector, a 15-pin VGA connector, and a 3.5mm audio connector. Cabling from this jack plate shall connect directly to a ceiling mounted video projector that shall project onto a recessed, motorized, ceiling mounted projection screen. A pole mounted amplifier and 4 ceiling mounted speakers shall provide audio support for each classroom. The Classroom A/V system shall be controlled by a wall mounted control panel that will enable projector on-off, screen up-down, projector input selection and volume up-down functions. 2. Each classroom system shall have (4) ceiling mounted speaker systems installed. These speakers shall connect to a 20 watt power amplifier that will be attached to the pole that supports the video projector. 3. The projector shall be a 4,000 lumen model and shall be installed approximately 17’ from the screen. 4. A 104” wide projection screen shall be installed as indicated on the drawings. The screen shall have a 16:10 aspect ratio and have a low voltage controller provided. All power supply and control wiring for the motorized projection screen shall be furnished, installed and connected by the Electrical Contractor. Game Room/Outdoor Patio Sound System 1. The Game Room/Covered Patio Sound System shall have three (3) inputs – a custom input jack plate with 3.5mm and XLR microphone connectors, and an audio feed from the existing athletic stadium sound system. These inputs shall connect to a stereo mixer/amplifier such that the 2 rooms can be managed separately. Each room shall have an independent wall mounted volume control. 2. D. The indoor Game Room shall have seven (7) ceiling mounted speaker systems installed. The outdoor Patio Space shall have three (3) surface mounted speaker systems installed. Miscellaneous Sound Systems (Rooms 012, 014, 022, 027, 208) 1. This description is typical the five (5) rooms identified above. 2. Each system shall be equipped with a mixer/amplifier, speakers (quantity as shown on the plans) and a single input jack plate that contains an XLR female microphone input and a 3.5 mm MP3 input jack. Cabling from this jack outlet shall connect directly to the mixer/amplifier associated with the individual room’s sound system. PART 2 - GENERAL 2.1 PRODUCTS/BILL OF MATERIAL GYMNASIUM SOUND SYSTEM Input Plates a. 5 RAPCO SP-1DFN 1-GANG SINGLE MIC INPUT PLATES Microphones and Accessories b. 4 c. 4 d. 4 AKG D-5S RAPCO N1M1-25 ATLAS MS-12CE VOCAL MICROPHONE W/ON-OFF SWITCH 25’ MICROPHONE CORD MICROPHONE FLOOR STANDS Main System Electronics Cabinet a. b. c. d. e. f. g. 1 1 4 3 Req 1 1 BIAMP NEXIA-CS BIAMP VCB BIAMP RLP-1 CUSTOM LOWELL DBB-4 CROWN DCi 4/600 SWITCHCRAFT D3F DIGITAL SIGNAL PROCESSOR VOLTAGE CONTROL BOX VOLUME ATTENUATORS DECORA LIGHTED/LATCHING SWITCHES DECORA FILLER PANELS 4-CHANNEL POWER AMPLIFIER FEMALE XLR PANEL MOUNT JACK Speakers & Volume Controls a. 32 JBL CONTROL 321CT b. 32 JBL MTC-300SG12 c. 32 JBL MTC-300BB12 CEILING MOUNTED SPEAKER SYSTEMS SPEAKER GRILLES BACKBOXES Main Equipment Cabinet & Accessories a. 1 LOWELL LPR-1422FV b. 1 WIREMOLD R8BZ-15 c. 4 d. 1 e. 1 LOWELL SEP-1 LOWELL UDE-314 LOWELL D8P-ID-3 EQUIPMENT CABINET W/VENTED FRONT DOOR; 14RU AC POWER ON-OFF PANEL W/SURGE SUPPRESSION BLANK CABINET FILLER PANELS 3RU STORAGE DRAWER 3RU PANEL W/8-DECORA CUTOUTS Portable Announcer’s Case & Accessories a. 4 SKB SKB19-6U PORTABLE EQUIPMENT CABINET; 6RU b. 4 c. 4 d. 4 SHURE SCM268 TASCAM CD-200il WIREMOLD R8BZ-15 e. 8 f. 4 g. 4 LOWELL SEP-1 RAPCO N1M1-10 RAPCO N1M1-100 4-INPUT MIXER CD PLAYER W/iPOD DOCK AC POWER ON-OFF PANEL W/SURGE SUPPRESSION BLANK CABINET FILLER PANELS 10’ MICROPHONE CORDS 100’ MICROPHONE CORDS Cable a. REQ b. REQ 22-2/SHIELD MICROPHONE CABLE 12-2/SHIELD SPEAKER CABLE CLASSROOM AUDIO/VISUAL SYSTEMS Input Plates and Cabling a. 5 b. 5 c. 5 LIBERTY PC-G1796-E-P-C LIBERTY DL-AOCHP-020M LIBERTY G-VGAMAM-M-75 A/V INPUT PLATE W/HDMI + VGA/AUDIO PLENUM RATED HDMI CABLE PLENUM RATED VGA/AUDIO CABLE Projectors & Accessories a. 5 b. 5 c. 5 PANASONIC PT-DW530U CHIEF RPMAUW CHIEF CMA100 4,000 LUMEN WXGA PROJECTORS PROJECTOR MOUNTS CEILING PLATE W/ADJUSTABLE COLUMN Projection Screens a. 5 DALITE 20858LS 65” x 104” PROJECTION SCREENS Audio Equipment a. b. c. d. e. 5 5 5 20 20 RADIO DESIGN LABS FP-PA20A RADIO DESIGN LABS PS-24KS RADIO DESIGN LABS PM-20VA BOSE DS16F BOSE 29830 20 WATT POWER AMPLIFIERS POWER SUPPLIES POLE MOUNT KITS CEILING MOUNTED SPEAKERS TILE BRIDGES Control Systems a. 5 Cable EXTRON MLC 226 IP WALL MOUNTED CONTROL PANELS a. b. c. d. REQ REQ REQ REQ 22-2/SHIELD RS-232 CONTROL CABLE 18-2/SHIELD SPEAKER CABLE 22-4 SCREEN CONTROL CABLE 18-2 POWER CABLE GAME ROOM/OUTDOOR PATIO SOUND SYSTEM Input Plates and Cabling a. 1 CUSTOM INPUT PLATE W/3.5MM + XLR-F CONNECTORS Audio Equipment a. b. c. d. e. 1 2 6 6 3 JBL CSMA280 JBL CSR-V (White) SOUNDSPHERE Q-CA UL SOUNDSPHERE TB-1 LOWELL OS-50TW DUAL OUTPUT MIXER/AMPLIFIER WALL MOUNTED VOLUME CONTROLS WHITE CEILING MOUNTED SPEAKERS TILE BRIDGES SURFACE MOUNTED OUTDOOR SPEAKERS Cable a. REQ b. REQ c. REQ 22-2/SHIELD 18-2/SHIELD CAT-5e MIC/LINE CABLE SPEAKER CABLE VOLUME CONTROL CABLE MISCELLANEOUS SOUND SYSTEMS (ROOMS 012, 014, 022, 027, 208) Input Plates and Cabling a. 5 CUSTOM INPUT PLATE W/3.5MM + XLR-F CONNECTORS Audio Equipment a. b. c. d. 5 JBL CSMA180 5 JBL CSR-V (White) * BOSE DS16F * BOSE 29830 MIXER/AMPLIFIERS WALL MOUNTED VOLUME CONTROLS CEILING MOUNTED SPEAKERS TILE BRIDGES * Refer to drawings for the quantities of speakers associated with each individual sound system in each space. Cable (as required) a. REQ b. REQ c. REQ 22-2/SHIELD 18-2/SHIELD CAT-5e MIC/LINE CABLE SPEAKER CABLE VOLUME CONTROL CABLE PART 3 - EXECUTION 3.1 A. WIRING METHODS When installed above accessible ceilings (lay in acoustical ceilings), sound system wiring shall be installed “open” (not within conduit). When installed in spaces having an exposed structure ceiling (except in the Gymnasium), sound system wiring shall be installed “open” (not within conduit). All sound system wiring within the exposed structure areas of the Gymnasium shall be installed within EMT conduit as specified herein. All sound system wiring installed above drywall ceilings shall be installed in EMT conduit as specified herein for its length of run over the drywall ceiling. All sound system wiring “drops” to wall mounted devices shall be installed within EMT conduit as specified herein. 1. Install plenum cable in environmental air spaces, including plenum ceilings. B. Wiring Method: Conceal conductors and cables in accessible ceilings, walls, and floors where possible. C. Wiring within enclosures: Bundle, lace, and train cables to terminal points with no excess and without exceeding manufacturer's limitations on bending radii. Provide and use lacing bars and distribution spools. 3.2 PERMITS & CODES A. All materials and equipment are to be installed in accordance with all applicable standards of the National Electrical Code, the electrical code of the governing local municipality, all other applicable local codes, and all safety codes and ordinances. B. All equipment supplied for this system shall be UL listed. C. All bidders will be required to provide all required local electrical permits. 3.3 INSTALLATION OF CABLES A. Comply with NECA 1. B. General Cable Installation Requirements: 1. 2. Terminate conductors; no cable shall contain unterminated elements. Make terminations only at outlets and terminals. Splices, Taps, and Terminations: Arrange on numbered terminal strips in junction, pull, and outlet boxes; terminal cabinets; and equipment enclosures. Cables may not be spliced. 3. 4. 5. 6. 7. C. Open-Cable Installation: 1. 2. 3. D. 3.4 Secure and support cables at intervals not exceeding 30 inches and not more than 6 inches from cabinets, boxes, fittings, outlets, racks, frames, and terminals. Cable support components shall include J-hooks, D-rings and bridle rings. Bundle, lace, and train conductors to terminal points without exceeding manufacturer's limitations on bending radii. Install lacing bars and distribution spools. Do not install bruised, kinked, scored, deformed, or abraded cable. Do not splice cable between termination, tap, or junction points. Remove and discard cable if damaged during installation and replace it with new cable. Cold-Weather Installation: Bring cable to room temperature before de-reeling. Heat lamps shall not be used. Install cabling with horizontal and vertical cable guides with terminating hardware and interconnection equipment. Suspend speaker cable not in a wireway or pathway a minimum of 8 inches above ceiling by cable supports not more than 60 inches apart. Cable shall not be run in contact with pipes, ducts, or other potentially damaging items. Separation of Wires: Separate speaker-microphone, line-level, speaker-level, and power wiring runs. Install in separate pathways or, where exposed or in same enclosure, separate conductors at least 12 inches apart for speaker microphones and adjacent parallel power and telephone wiring. Separate other communication equipment conductors as recommended by equipment manufacturer. INSTALLATION A. Coordinate layout and installation of system components and suspension system with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment, fire-suppression system, gymnasium equipment and partition assemblies. B. Match input and output impedances and signal levels at signal interfaces. Provide matching networks where required. C. Identification of Conductors and Cables: Color-code conductors and apply wire and cable marking tape to designate wires and cables so they identify media in coordination with system wiring diagrams. D. Wall-Mounted Outlets: Flush mounted. E. Weatherproof Equipment: For units that are mounted outdoors, in damp locations, or where exposed to weather, install consistent with requirements of weatherproof rating. F. Speaker-Line Matching Transformer Connections: Make initial connections using tap settings indicated on Drawings. 3.5 A. 3.6 GROUNDING Ground cable shields and equipment to eliminate shock hazard and to minimize ground loops, common-mode returns, noise pickup, cross talk, and other impairments. FIELD QUALITY CONTROL A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections. B. Perform tests and inspections. 1. C. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing. Tests and Inspections: 1. 2. 3. 4. Schedule tests with at least seven days' advance notice of test performance. After installing sound systems and after electrical circuitry has been energized, test for compliance with requirements. Operational Test: Perform tests that include originating program and page messages at microphone outlets, pre-amplifier program inputs, and other inputs. Verify proper routing and volume levels and that system is free of noise and distortion. Signal-to-Noise Ratio Test: Measure signal-to-noise ratio of complete system at normal gain settings as follows: a. b. c. 5. 6. 7. Disconnect microphone at connector or jack closest to it and replace it in the circuit with a signal generator using a 1000-Hz signal. Replace all other microphones at corresponding connectors with dummy loads, each equal in impedance to microphone it replaces. Measure signal-to-noise ratio. Repeat test for each separately controlled zone of loudspeakers. Minimum acceptance ratio is 50 dB. Distortion Test: Measure distortion at normal gain settings and rated power. Feed signals at frequencies of 50, 200, 400, 1000, 3000, 8000, and 12,000 Hz into each pre-amplifier channel. For each frequency, measure distortion in the paging and all-call amplifier outputs. Maximum acceptable distortion at any frequency is 3 percent total harmonics. Acoustic Coverage Test: Feed pink noise into system using octaves centered at 500 and 4000 Hz. Use sound-level meter with octave-band filters to measure level at five locations in each zone. For spaces with seated audiences, maximum permissible variation in level is plus or minus 3 dB. In addition, the levels between locations in same zone and between locations in adjacent zones must not vary more than plus or minus 3 dB. Power Output Test: Measure electrical power output of each power amplifier at normal gain settings of 50, 1000, and 12,000 Hz. Maximum variation in power output at these frequencies must not exceed plus or minus 1 dB. D. Inspection: Verify that units and controls are properly labeled and interconnecting wires and terminals are identified. Prepare a list of final tap settings of paging speaker-line matching transformers. E. Sound systems will be considered defective if it does not pass tests and inspections. F. Prepare test and inspection reports. 1. 3.7 A. STARTUP SERVICE Engage a factory-authorized service representative to perform startup service. 1. 2. 3.8 A. 3.9 A. Include a record of final speaker-line matching transformer-tap settings and signal ground-resistance measurement certified by Installer. Verify that electrical wiring installation complies with manufacturer's submittal and installation requirements. Complete installation and startup checks according to manufacturer's written instructions. ADJUSTING On-Site Assistance: Engage a factory-authorized service representative to provide onsite assistance in adjusting sound levels, re-setting transformer taps, and adjusting controls to meet occupancy conditions. DEMONSTRATION Train Owner's maintenance personnel to adjust, operate, and maintain the public address system and equipment. Refer to Section 017900 "Demonstration and Training." HSS 4X4X114 WI 10" X 10"X 518 BASE PLATE WI (4) 518" DIA. X 8" EMBED ANCHORS. PROVIDE 114" DIA. WEEP HOLE. BOTTOM EL. = 99"-5" 1 - - 1 L- ~'"·'./ 4" THICK SLAB WI -----........._ #4's AT 24" O.C. -· _.. ~ E.W. T.O.SLAB = 100'-0" .. · : .. NOTE: ALL STEEL SHALL BE HOT-DIPPED GALVANIZED. l~l I : 18" X 18ft PEDESTAL WI (4) #$ VERTICAL WI ACI TENSION HOOK INTq FOOTING AND (3) #3 TIES AT 3ft O.C. T~ EN AT 12ft I I :j I I q.c. _: _; I ..... . - ,'!: .. ·. L------------------------------ ~ ---~ ' ...~· ~...-,:.-,,;'""."'7~~~~~~".""'.':-"'~~~~~~~~'l"""""'!'~~-~~1~ .......,....................J.-':'. ~!-.... ~.... ~ ···.:.~:-... ~·.:·..~.::.,r:.,~... 4:-::·.:·:.-:. .,.::.. ';.•··.=.. ·..:: ...·••A:' ..•' .,-t'• .••. • • V .. .......... ',•': •-. _).~• .. , ;··~: .~~·<;,,•:.., . ... ...>~ .. · '" ··-·-:-;:•. 7".·:"":""·. -4,---- :;"•·.·· ~'".·'·~••.:: .•. I L 30 811 ------- ~ ------ I I V 8" CONCRETE WALL WI #5's AT 18" VERTICAL WI ACI TENSION HOOK INTO FOOTING AND (3) #5's HORIZONTAL. T.O.W. EL. = 99'-4R 3'-0R X 18ft THICK FOOTING WI (3) #5's LONG AND #4's AT 48ft SHORT. T.O.F. EL.= 97'-4" I I ~ FOUNDATION PLAN (3)2X12'sTREATED - ~ SOUTHERN PINE #2 OR BETTER 114R: 1'-0" HSS 4X4X114 WI 114R X 12" WIDE X 8" TALL RUR PLATE WI (2) 518" DIA. BOLTS GROUT (2) END CORES SOLID, TYP. 2X8 JOISTS AT 2'-0" O.C. TREATED SOUTHERN PINE #2 OR BETTER 114" X 6R WIDE X B" TALL "U" PLATE WI (1) 518ft DIA. BOLT WELDED TO 10" TALL X 12" WIDE X 112ft THICK PLATE WI (4) 518" DIA. X 5-112" EMBED EPOXY ANCHORS, TYPICAL. WELD RU" PLATE TO SURFACE PLATE 518" APA RATED PLYWOOD SHEATHING 8" NORMAL WEIGHT CMU WI #5's AT 32" O.C. VERTICAL. PROVIDE DOWELS INTO FOOTING TO MATCH VERTICAL SPACING. WEATHERPROOF~~-1--~t-~f" DUPLEX RECEPTACLE WEATHERPROOF DUPLEX RECEPTACLE '-0' FRAMING PLAN 114R: 1'-0" 30 811 I I 2'-6" X 2'-6R X 12" THICK Fb OTING WI (3) #4's BOTTOM. I T.0.F. EL. = 97'-4R I I I METAL ROOF PANELS - - ,-. - - - - / V / , ~ r PRE-FINISHED METAL ROOF EDGE TRIM ~ - .- - I - I I I I I I I I I I I I I I I I I I I I It I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I T ~ T I I I I - I I I :~ I I I I ~~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I K I I I K I I PRE-FINISHED GUTTER ALUMINUM DOWNSPOUT SPLASH BLOCK i:= -11 ELEVATION 1/4R =1'•0" TREATED 2X8s BEYOND I T T T T T T T T T T ; ;T T T T T / - " " / " \ " CMU GROUT SOLID ABOVE BOND BEAM " \ ~ 0--- ,-. \ 0--- ,-. I I I I I I I I I I I I I I I I I I I I I I I ELEVATION l 1/4R: 1'-0" I I I I I I I, I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ~ HSS4X4X1/4 COLUMN, PAINTED 8" NORMAL WEIGHT CMU, PAINTED I I I I I PROVIDE BOND BEAM AT TOP AND BOTTOM OF WALL I I I I I I I I I I I I I _/ lJ' V I I GROUT (2) END CORES SOLID ---- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I \I I I I I \ I I I I I I I I I I I I I I I ""'-J. I I I I ""-.. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I (2\ " r \ I " T T V ELEVATION 1/4" =1'-0" METAL ROOF PANELS SPRAY APPLIED FLUID MEMBRANE 5/a· APA RATED PLYWOOD SHEATHING 2X WOOD FASCIA BOARD PRE-FINISHED ALUMINUM FASCIA TRIM SURFACE-MOUNTED, CLAMPON SNOW GUARDS PROVIDE 3'-0" ICE & WATER BARRIER AROUND EDGE PRE-FINISHED METAL - DRIP EDGE I I TREATED 2X8s AT 24" O.C. 3 3/4" X 5" OGEE ALUMINUM GUTIER. PITCH 1/B• PER FOOT TO DOWNSPOUT HSS4X4X1/4 COLUMN H2.5H CLIPS BY SIMPSON STRONG-TIE OR EQUAL, TYPICAL 2X WOOD FASCIA BOARD (2) 2X TREATED NAILERS WI 5/8" ANCHORS AT 4 -0• 1 PRE-FINISHED ALUMINUM FASCIA TRIM AND AT PLATE ENDS - ALUMINUM DOWNSPOUT - - a• NORMAL WEIGHT CMU W/#5'sAT 32" O.C. VERTICAL IN FULLY GROUTED CORES 4• SLAB-ON-GRADE W/ #4's AT 24• O.C. SPLASH BLOCK _-..; ~ . •. •·.. A -~-- - .. 8" X 12" THICKENED SLAB EDGE, TYPICAL ·-~11. " - • ti" ..... ~:::z::-=-=~ SECTION SECTION 1/2" =1'-0" 1/2" =1'-0" I I ~ _, U) - -.-- - - I 24'-4R •0 ~ I~ I~ I ih I I I ~EE:lt L _j_ - - - - - - - - - - - - - ~-~)--ffiplf--{ I I I PARTIAL UPPER LEVEL FLOOR PLAN 1/8": 1'-QR AREAC 4" OD DN TO 18" A.F.F., PIPE THRU WALL TO OVERFLOW FITIING. 4" RD UP AND DN SK-1 3/4" CW/HW ON Ul J 1/2" CW ON FOR VEST ~ ICE MAKER F=1:lll!!I~~- 1/2" CW/HW 2" W DN 2" V UP 14 13 UNIVERSITY WELLNESS AND PARKS MULTl-PURPOSE RECREATION CENTER 1299 LAFAYETTE STREET JEIFIFERSONI cnrv, MISSOUIRI IPROJ: 1601 ADDENDUM DRAWING P201A-R3 DATE: 11/06/15 ·// ASH ,ERVICE SPECIALIST /· ·/ -681-7528 321-4531 @AMEREN.COM / ::MISE NUMBER: 691216100 !· I· ·I / I ) 1 I I/. .. I ,1 \~ I EXISTING . MANHOLE I ., il :IE z~ "'f"""" fl:I IO iii ~ "'f"""" 0 I w "'f"""" ~ I- < C ( i... ~ a. . / @ / / ----·S - - \ - - s - - - - s - - - - s--------==-=~ ·,- s - n -_-----@ --- // // /- 1z
:..J
::, ::,
LIGHTING FIXTURE SCHEDULE NOTES
::E
1. LETIEIRS " I" AND "O" ARE tlOT USED TO IDENTIFY A LIGHTING FIXTURE TYPE. 2. WHEN A BIDDER PROPOSES TO USE LIGHT AXTURES OF MANUFACTURERS AND MODEL NUMBEIRS DIFFERENT THAN THOSE SPECIFIED ABOVE. THE SUBSTITUTION REQUEST SHALL INCLUDE A COMPUTER GENEIRATED PHOTOMElRIC LIGHTING ANALYSIS THAT IDNTIFIES THE ILLUMINATION LEVELS P RODUCED BY THE PROPOSED SUBSTITUTE FIXTURE. REFEIR TO DIVISION 26 SPECIFICATIONS FOR ADDl1l0NALINFORMA1l0N.
-~
*I
FIRE ALARM SYSTEM FUNCTION MATRIX
~-
~ (!)
z
C
z j:: < (.) 0 z
~ cz
-
~
0::
~
(!)
j::
rJ)
s< tlz w<
~ (/')
w
s< (.~) 0::
..J ..J
<
C
z
::::,
0
Cl)
~c
-> <
rn
Cl)
<
..J ..J
w ::::, Q. 0 w ..J
:c <
I- ::::,
< ::c Cl)
We c( > > l5 i= z (.) -
I- -
s LL
LL.
Cl)
w~ I- w c( ICl) (.) >OC/) rn > Cl) < c( rn C 0:: z w<
z
::::, Q. (/') Q.
Q.
..J
c(
CCI
::::, < <
0
..J
..J -
..J -
i i5
0 I-
z w
:E Q.
5
aw
(.)
<
~
i0
C
~
J:
Cl)
c(
SYSTEM ACTIONS
~ ffi
•~~ ~.
Cl)
0:: :
::::, 0
I- I-
0 : 1-- ... LL. 0
..J :
w ::!!: ZO < c:: Q. LL. >- Cl)
t ~ t ~ ~ t ~ t ~
z zO Cl)
~ ~
ffi
w Q
~~
~·
I- w ..J I-
~ < Cl)
0
w
C
X
X
NA '
X
SMOKE DETECTOR
X
X
X
X
NA ~.
X
DUCT SMOKE DETECTOR AT fiVAC EQUIPMENT
X
X
X
X
~ NA ~~
X
SMOKE DETECTOR AT BASEMENT LEVEL ELEVATOR LOBBY
X
X
X
X
X
t..
X
SMOKE DETECTOR AT 1ST FLOOR ELEVA TOR LOBBY
X
X
X
X
X
SMOKE DETECTOR AT 2ND FLOOR ELEVATOR LOBBY
X
X
X
X
X
~~
SMOKE DETECTOR WITHIN ELEVATOR MACHI NE ROOM
X
X
X
X
X
(
MACHI NE ROOM
~.
X
X
't·
Q
z
WW
::::, c..
Oz 0:: < I-
wZ c.. <
Cl) (.)
w<
::C LL I-
i5
-z
CCI I::::, C
w
::c
I-
...