Quick-Start Guide
Security Analytics Storage Module
Cabling
Rack Installation
1
WARNING: The storage modules MUST be cabled exactly as shown: For 2-RAID-controller configurations, Module 1 must be connected directly to RAID Controller 1, Module 2 to RAID Controller 2, Module 3 to Module 1, and so on. The numbered stickers on each port indicate the corresponding port on the next module in the chain; for example, connect Port 1 on RAID Controller 1 to the Port 1 on Module 1, and Port 3 on Module 1 to Port 3 on Module 3. If you do not follow these instructions with exactness, you risk damaging the disk configuration, and a complete system reinitialization might be required to repair the damage.
Verify Package Contents
1 RAID Controller
2 RAID Controllers
• Security Analytics storage enclosure • Two SAS cables • Two power cables • Bezel (optional) • Two mounting rails (optional)
Module 5
• RAID controller card (optional) • User documentation
2
Module 3 NOTE: For the SA-2G-10T-G6 appliance, only one storage module is supported.
Identifying the Rail Kit Contents Locate the components for installing the rail kit assembly: • Two mounting rails [1] • Eight 10-32 x 0.5-inch flange-head Phillips screws [2]
3
Module 1
Multiple Head-Unit Setup If you have purchased multiple head units with attached storage modules, each head unit and its respective modules have a unique group number. The group number is indicated by a blue sticker on the rear of each unit.
RAID Controller 2
1
RAID Controller 1
Installing the Rails
Module 2
NOTE: Ensure that the screws are centered within the rack holes and tightened to the rack flange. Position the rail labeled R-FRONT facing inward and align the holes on the rail with the holes on the front of the vertical flange. Install two screws to secure the rail to the vertical flange [3]. Align the back end of the rail until the holes align with the corresponding holes on the back vertical flange. Install two screws to secure the rail to the vertical flange [4]. Repeat the steps for the other rail.
4
10G Appliance 1
Module 4 1
2G Appliance
Identify the Port and Group Numbering The SAS ports on the back of the storage modules are marked with a white, numbered sticker. The numbers indicate which SAS ports to cable to the next SAS port in the chain.
I/O Card Placement May Vary
Module 6
A blue sticker with a white number indicates the module’s group number. The module’s corresponding head unit has the same group number.
SA-SM-48T-G6
Blue Coat Part: 231-03270 rev A.0
Date of Publication: 17 March 2017
Quick-Start Guide
Security Analytics Storage Module
5
Front Panel Features 1. System identification button 2. Power LED 3. Enclosure status LED 4. Hard disk drives
Installing and Removing the System Align the system with the rails and slide the system into the rack [5]. Tighten the thumbscrews on each side of the system’s front panel [6]. To remove the system from the rack, loosen the thumbscrews and slide the system out of the rack.
6 Rear Panel Features
Connecting and Securing the Power Cable(s)
7 Power-On the Components After you have connected the storage module(s), power on the components in this order: 1. Storage module(s) 2. Wait 30 seconds, and then turn on the host controller.
1. Power supply unit or cooling fan module (PS1)
4. Information tag
2. Primary enclosure management module (EMM 0)
5. Power switches (2)
3. Secondary EMM (EMM 1)
6. Power supply unit or cooling fan module (PS 2)
Enclosure Management Module 1. SAS port (input) 2. SAS port (output) 3. SAS port (input) 4. SAS port (output) 5. USB Mini-B (serial debug port) 6. 7-Segment display to indicate the enclosure location in the SAS chain
WARNING: This is a condensed reference. Read the safety instructions in the Product Information Guide, included with the product packaging, before you begin. WARNING: Only trained service technicians are authorized to remove the system cover and access any of the components inside the system. CAUTION: The rack kit is intended to be installed by trained service technicians in a rack that meets the specifications of American National Standards Institute (ANSI)/Electronic Industries Association (EIA) standard ANSI/EIA-310-D-92, International Electrotechnical Commission (IEC) 297, and Deutsche Industrie Norm (DIN) 41494. One rack kit is required for each system that is installed in a rack. NOTE: Begin installing the rails in the allotted space that is closest to the bottom of the rack enclosure. NOTE: The illustrations in this document do not necessarily represent a specific system. Information in this document is subject to change without notice. © 2015 Blue Coat Systems, Inc. Reproduction of these materials in any manner whatsoever without the written permission of Blue Coat Systems, Inc. is strictly prohibited.
SA-SM-48T-G6
Blue Coat Part: 231-03270 rev A.0
Date of Publication: 17 March 2017