Preview only show first 10 pages with watermark. For full document please download

Shower Door Tower Installation Instructions 17232t/17233t

   EMBED


Share

Transcript

SHOWER DOOR TOWER INSTALLATION INSTRUCTIONS 17232T/17233T 1. Position Shower Tower in corner. 2. With a soft pencil, mark on the wall the position of the joint between top cap and shower tower. 3. From this mark, measure down and mark centre lines for clips. For the 1000 mm long Shower Tower mark top centre lines only! Do not mark bottom two centre lines. These are for the 1830 mm long Shower Tower. V084260 ISSUE 3/10.2001 1 4. Align holes in clips with centre lines and mark hole centres. Ensure clip is firmly in corner. 5. Drill holes into walls with a 5 mm masonry drill and fit Nylon Anchors. IMPORTANT Only drill 4 holes for 1000mm Shower Tower. 6. Fix clips to wall using screws supplied. Seal screw heads with Silicone. 7. Position Shower Tower in corner and engage clips along length ensuring all clips are inside the extrusion. 8. Holding the bottom fast with foot, secure the top clip using a sharp jolt with the palm of your hand. Continue down to the bottom of the tower. V084260 ISSUE 3/10.2001 2 9. Hold plastic mounting bracket as shown. 10. Fit top end of Tee piece into horizontal slot in the tower. 11. Then rotate bracket 90 to engage small pin at bottom end of bracket in small hole. Repeat for all brackets. 12. Align hoops with mounting brackets, push down and click into position. Press fit 2 soap dishes to 2 top hoops. On the 1830 Shower Tower, align foot rest with mounting brackets, push down and click into position. SOAP DISH HOOP FOOT REST V084260 ISSUE 3/10.2001 3 IMPORTANT CONSUMER INFORMATION LIMITED ONE-YEAR WARRANTY Kohler plumbing fixtures and fittings are warranted free of manufacturing defects. Kohler China Limited will, at its election repair, replace, or make appropriate adjustment where Kohler China Limited inspection discloses any such defects occurring in normal usage within one year after installation. Kohler China Limited is not responsible for installation costs. To obtain warranty service, contact Kohler China Limited either through your Dealer or Plumbing Contractor or by writing: Central Customer Service Center Kohler China Ltd. 19/F, Shanghai Square, 138 Huaihai Road, Luwan District Shanghai, PRC, Post Code: 200021 Http://www.kohler.com.cn Implied warranties, including that of merchantability, are expressly limited in duration to the duration of this warranty. Kohler China Limited disclaims any responsibility for consequential damages. This is our exclusive written warranty. V084260 ISSUE 3/10.2001 © Copyright Kohler NZ Ltd 2001 4