Preview only show first 10 pages with watermark. For full document please download

Similar Pages

   EMBED


Share

Transcript

Request for Information 421 Detailed, RFIs Grouped by RFI Number 4706 - Wilkes University - New Science Center 150-180 South River Street Wilkes-Barre, PA Project # 4706 Tel: (570) 408-6305 Sordoni Construction Services, Inc. Fax: (570) 408-6304 RFI #: 421 Date Created: 4/2/2013 Answer Company Author Company Authored By SaylorGregg Architects Tom Breslin 1100 Land Title Building, South Broad Street Philadelphia, PA 19010 Answered By Linco Construction 349 Prichards Road Hunlock Creek, PA 18621-3100 William Lindley Co-Respondent Randy Levine, MRA Author RFI Number Subject Sprinkler lines in Stark connector Cc: Company Name Discipline Contact Name Category Copies Notes Question Date Required: 4/5/2013 Sprinkler shop drawings showed side wall heads as there is no clearance to install the in-ceiling concealed heads as noted on the drawings. Please advise if the sidewall heads will be acceptable or is the ceiling height going to drop to allow for the required clearance? Suggestion Answer Date Answered: 4/5/2013 The sidewall heads as shown on the approved shop drawings are acceptable due to space constraints. Prolog Manager Printed on: 4/8/2013 SCS PA Page 1