Transcript
IDEAS-IV Gulfstream-V aircraft October 17 - November 18, 2013
Overview of instrument testing needs Please describe: your instrumentation instrument testing needs Include such items as: altitude requirements special maneuvers needed additional measurements needed for the evaluation of system performance airspeed requirements or limitations etc. Describe the number of flights needed and the meteorological or similar target conditions (e.g. need for polluted or clean air) needed for testing. List the dates your instrument will be available for testing and the personnel that are planned to be in the field with the testing. Disclose any export restrictions on your instrument or proprietary restrictions on the instrument or data. For the 2013 GV IDEAS program, review the schedule and indicate if you will have any problems meeting it.
Instrument Testing Criteria. Please describe how your instrument testing needs meet each of the criteria listed in the IDEAS announcement.
Contact Information. Please provide contact information. (email, phone, address).
User-supplied Scientific Payload 1 Please provide the following information for each instrument to be tested: Instrument Name: Primary Contact Name: Primary Contact Institution: Primary Contact Phone: Primary Contact Email: Export Status of instruments (e.g. ITAR controlled, dual use, etc., unrestricted) Individual weight of all components: Complete size dimensions of all components: Rack-mountable 19” panel space required (Note: depth beyond 25” will overhang in back): Supplying your own 19” rack (yes/no): (Note: racks must survive 9G crash load.) Hazardous material required: Radioactive sources or materials: Power required (watts, volts, amps): Type of power (DC, 60 Hz, 400 Hz): External sensor location (if any): Are signal(s) to be recorded on RAF’s Aircraft Data System ? If yes: Signal format (digital, analog, serial): Full-scale Voltage: Range: Resolution: Sample Rate (1, 5, 250 sps): Need real-time, in-flight, RAF-measurement, serial data feed (RS-232, RS422)? Need IRIG time-code feed? Special sensor calibration service required? Need full-time operator during flight? Number of lap-top computers for on-board use: Will EOL support be required in preparing the instrument(s) for use on the aircraft (other than inspection, installation and power hook-up)? If so, specify type and lead time. Will you be using your own recording system? What additional recording capability is needed? Please 1
(yes / no)
All user-supplied equipment must meet RAF safety and design specifications. Refer to the RAF GV Investigator Handbook at http://www.eol.ucar.edu/gv.
provide details on the number of signals, their characteristics, format, synchronous, fire-wire, ethernet, etc. If nonstandard output formats and/or data rates are required, how often are the measurements needed? Note: The standard format for processed, RAF output data is net CDF. The standard output media are CD/DVD and ftp transfer. Payload ground support needs for user-supplied instrumentation: Preflight needs On flight days Access (hrs) Power (hrs) Special support needs
Postflight needs On flight days
Routine Maintenance On non-flight days