Preview only show first 10 pages with watermark. For full document please download

Similar Pages

   EMBED


Share

Transcript

Concealed bath/shower mixer Installation Instruction Please read this instruction carefully to avoid any difficulty during installation. Components List No. Component 1 Handle 2 Plate 3 Sealing strip 4 Cap 5 Cartridge fastener 6 Ceramic cartridge 7 Cover 8 Main body 9 Female allen screw 10 Index 11 Knob 12 Diverting valve 13 Index 14 Cross-head screw 15 Plastic sleeve 16 O-ring 17 Stopper 18 Union 19 Safe cover for diverter 20 Safe cover for body 21 Index 22 Flat washer 23 Cross-head screw 24 Blue index 25 Red index Quantity 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 Installation Step Installation Fig 1 3 Flow rate Curves Test pressure: 1.6MPa (16bar) L/min 40 Flow pressure: 35 2 1 4 Before installing the main body, read the index on cover , install the decorating tiles and glue the plate (4). 2 30 Min 0.05MPa 25 Max 1.60MPa 20 Recommended pressure: 15 0 0.5 1 1.5 2 2.5 3 3.5 4 Bar 0.1MPa to 0.8MPa (1 to 8 bar) 5 Note 7 6 3 Attention: the inner radii of the G1/2 connection pipe is not less than 13mm. Read the Installation Fig and confirm the installing position. Test: Open the supply pipes, close the ceramic cartridge and check the connections for leakage; open the ceramic cartridge and check the smooth water flow. Decorate the wall after checking and remove the safe cover. Install the escutcheon and handle. 1.Ensure proper cleaning of the water supply pipe before installation to avoid any jammed. 2.The cold-water supply must be connected on the right and the hot-water supply must be connected to the left. 3.Check the installation dimensions according to the Figure and ensure it is installed correctly. o 4.Hot-water inlet temperature must not be over 80 C. PZMF131400 2009.02.10