Alexandria New High School Seven Month Rolling Milestone Schedule 04.08.14 Previous 3 months: • Framing, Sheet rocking and Taping Complete • ACT, Paint, Tile, Carpet, Casework, Lights • MEP Finishes • Technology and Controls • Acoustical Ceilings and Baffles • Interior Concrete Complete • Elevator Complete • Science Casework Complete • Glu Lams Finishes Complete • Gym Equipment Complete • Stage Rigging Current Operations: • Area A & B – Classroom wings o Stair treads and risers o Corridor Wall Tile o Science Casework Install o Paint Complete o DIRTT Wall Finishes ongoing o Room Control Finishes o Technology and Networking o Metal Panels o AHUs ready to start o Architectural Woodwork o Final Cleaning o Stainless Railing • C – Commons, Cafeteria, Kitchen o Terrazzo o MEP Finishes o Kitchen Tile Complete o Toilet Room and Concessions Tile complete o Kitchen Equipment install o Coiling Doors o Wood fins and paneling o ACT complete • Area D & E – Fitness, Locker, Gymnasium o MEP Finishes Complete o AHU Start up o Tile Complete o Wood Flooring Ready for Stain & Paint o Toilet Partitions Compete o Final Clean • Area F – Auditorium, Music, Arts o Terrazzo o MEP Finishes o Vinyl Wall Coverings o Concrete Complete o Lifts Complete o Acoustic panels o Architectural Woodwork o Auditorium Projection Screen o Hearing loop ongoing o Paint Complete o Auditorium Seating o Auditorium Carpet • Site – o Lift road restrictions Future 3 Months: • Building Completion: o Metal Panels completion o Finishes – Paint, Tile, Ceilings, Flooring, DIRTT walls, Woodwork o Auditorium Seating o Test systems; Fire alarm, Controls, Security, Etc. o CLEAN, CLEAN, CLEAN o MEP Finishes Complete, Start AHUs o Balancing, Commissioning, Testing o Certificate of Occupancy o Owner Training • Site work: o Parking lot final paving, stripping and signage o Track Surface o Building Irrigation, Landscaping, and Seeding o Maintenance Building and Out Lot o Scoreboards and Site Finishes PICTURE 1 PICTURE 2 PICTURE 3 PICTURE 4 PICTURE 5 PICTURE 6 PICTURE 7 PICTURE 8 PICTURE 9 PICTURE 10 PICTURE 11 PICTURE 12 PICTURE 13 PICTURE 14 PICTURE 15 PICTURE 16 PICTURE 17 PICTURE 18 PICTURE 19 PICTURE 20 PICTURE 21