Transcript
C
EXTERIOR SOLAR PANELS: REFER TO SITE PLANS E-P-01 AND S-P-01 FOR LOCATIONS Public Works and Government Services Canada
1
Travaux Publics et Services gouvernementaux Canada
STRING #1 1
3
ARRAY #1 DC COMBINER BOX
SOLAR DC DISCONNECT (60A, 35A FUSE)
4
3
2
1
6 SOLAR CHARGE CONTROLLER
1 STRING #2
SOLAR DC DISCONNECT (100A, 75A FUSE)
4
6
4A
5
3
1
Copyright Reserved
STRING #3 1
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay. The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
3
1
ARRAY #2 DC COMBINER BOX
STRING #1 1
3
SOLAR DC DISCONNECT (60A, 35A FUSE)
4
2
3
SOLAR DC DISCONNECT (100A, 75A FUSE)
6 SOLAR CHARGE CONTROLLER
4
6
4A 5
1 STRING #2 1
5A
6
EXISTING DIESEL GENERATOR ENCLOSURE
3 DC BUS 1
WIND TURBINE #5
STRING #3 1
3
2 LOAD DIVERSION CONTROLLER #5
G
EXISTING MANUAL TRANSFER SWITCH
2 DIESEL GENERATORS
6 11 WIND TURBINE #4
EXTERIOR WIND TURBINES: REFER TO SITE PLANS E-P-01 AND S-P-01 FOR LOCATIONS
11 WIND TURBINE #1
WIND TURBINE #2
WIND TURBINE #3
WIND TURBINE #4
WIND TURBINE #5
2.5kW
2.5kW
2.5kW
30A-2P DISC.
6
EXISTING 48V BATTERY BANK
150A DC DISCONNECT SWITCH
150A DC DISCONNECT SWITCH
5
30A-2P DISC.
30A-2P DISC.
6
GENERATOR BRAKER
INVERTER #1 (120V)
12
5
6
6
INVERTER #2 (120V)
6
LOAD DIVERSION CONTROLLER #2 6
WIND TURBINE #1 11
BACKUP
5
2.5kW
11 30A-2P DISC.
5
LOAD DIVERSION CONTROLLER #3
WIND TURBINE #2
30A-2P DISC.
LOAD DIVERSION CONTROLLER #4
6
WIND TURBINE #3 11
2.5kW
NORMAL
LOAD DIVERSION CONTROLLER #1 7 6
20A-2P
C
8
PANEL W
9
11
10
8
8 20A-2P
20A-2P
20A-2P
20A-2P
125A-2P
15A 1P
15A 1P
15A 1P
15A 1P
20A 2P
15A 1P
15A 1P
20A 2P
HEATER
1
9
E-P-03
15A 1P
15A 1P
HEATER
15A 2P
15A 1P
30A 2P
60A 2P
60A 2P
OVERFLOW
20A 2P
(JUNCTION BOX ARRAY #3 LOCATED IN LIGHT TOWER)
10
N.T.S.
120/240V, 225A, 42 CCT., 22kAIC
03/31 2015
ISSUED FOR TENDER
0 revisions
ELECTRICAL KEY NOTES
ELECTRICAL FEEDER SCHEDULE FEEDER NO.
FEEDER SIZE
1
2
2
2 x [2C #3/0 AWG TECK90]
3
2C#10 TECK90
4
2C#6 TECK90
5
2C#2/0 TECK90
6
1
PROVIDE TWO DC COMBINER BOXES FOR ARRAY OF SOLAR PANELS AS INDICATED. COMBINER BOXES SHOULD BE CAPABLE OF ACCEPTING A MINIMUM OF THREE STRINGS AND SIZED FOR #12 AWG RPV90 CABLES IN AND #6 AWG TECK90 OUT, SCHNEIDER AB08-160 OR EQUIVALENT. MOUNT TO EXISTING SOLAR PANEL RACKING SYSTEM. COORDINATE ON SITE WITH STRUCTURAL CONTRACTOR. PROVIDE #6 AWG COPPER GROUND CONDUCTOR FOR CONNECTION TO EACH SOLAR PANEL, TERMINATING AT THE COMBINER BOX.
4
PROVIDE TWO, 60A, 150VDC RATED DC DISCONNECT SWITCHES WITH 35 AMP FUSES FOR SOLAR PANEL ARRAYS. MOUNT SWITCHES IN DISTRIBUTION EQUIPMENT ROOM. REFER TO LAYOUT DRAWING E-P-02.
4A
PROVIDE TWO, 100A, 150VDC RATED DC DISCONNECT SWITCHES WITH 75 AMP FUSES FOR SOLAR PANEL ARRAYS. MOUNT SWITCHES IN DISTRIBUTION EQUIPMENT ROOM. REFER TO LAYOUT DRAWING E-P-02.
7
3C #1 TECK90
5
PROVIDE TWO SOLAR CHARGE CONTROLLERS, MORNINGSTAR TS-MPPT-60 OR EQUIVALENT. MOUNT IN DISTRIBUTION EQUIPMENT ROOM. REFER TO DRAWING E-P-02.
8
3C#6 TECK90
5A
PROVIDE SINGLE PHASE, 400A RATED, 2 BUS SPLITTER BOX FOR DC BUS. CONNECT TO EXISTING BATTERY BANK AS INDICATED.
9
3C#8 TECK90
6
PROVIDE DC DISCONNECT SWITCHES RATED FOR 150A. INSTALL INVERTERS, PROVIDED BY OTHERS, AND DISCONNECT SWITCHES IN EQUIPMENT ROOM AS INDICATED ON LAYOUT DRAWING E-P-02.
10
3C#10 TECK90 7
NOT USED.
8
PROVIDE DISTRIBUTION PANEL AS PER SPECIFICATIONS AND SINGLE LINE DIAGRAM, DETAIL 1.
9
PROVIDE CABLES, SIZED AS INDICATED. FINAL CABLE SIZES SHALL BE VERIFIED UPON CONFIRMATION OF EQUIPMENT SELECTION BY OWNER.
10
ENSURE PROPER COORDINATION AND CONNECTION OF WIND TURBINES, DIVERSION CONTROLLER, AND DIVERSION LOAD THERMAL SENSORS IN ORDER TO GUARANTEE THE TURBINES WILL COME TO A STOP AS REQUIRED. REFER TO MANUFACTURER'S INSTRUCTIONS AND CONSULT MANUFACTURER OR ENGINEER AS REQUIRED.
11 12
3C#12 TECK90 2C #1 TECK90
11
PANEL E
(LOCATED IN DWELLING UNIT)
(LOCATED IN EQUIPMENT BLDG.)
INSTALL SOLAR PANELS, PROVIDED BY OWNER, ON EXISTING RACKING AS PER MANUFACTURER'S INSTRUCTIONS.
3
2C#4 TECK90
PANEL D
date projet
project
SOLAR AND WIND POWER REPLACEMENT GREEN ISLAND FORTUNE BAY, NL
drawing
dessin
PUFFIN ISLAND SINGLE LINE DIAGRAM
R.M.D.
designed
concu
APR. 2, 2014
date drawn
J.L.T.
date
APR. 2, 2014
approved
R.M.D.
date
APR. 2, 2014
dessine
approuve
Tender
Soumission
ANDREW TEMPLE PWGSC Project Manager
APR. 2, 2014 Administrateur de projets TPSGC
project number
INSTALL LOAD DIVERSION CONTROLLERS WITHIN 9m OF DC BUS.
no. du projet
133430024 drawing no.
E-P-03
C
PWGSC B1 (2004) 0
10
20mm
40
60
80
100
no. du dessin
120
140
160
180
200mm
E-DRM/GDD-E: